Additional RFI Questions.doc

DOC document 37 KB Posted

Attached to
Aircraft Launching, Landing, and Ground Handling Equipment
Solicitation number
FA8533-08-R-20817
Issued by

About this file

Request for Information response date is 22 April 2008

View the file

Other files

File Type Posted
C-130 ISO Stand Questions 22 July 2008.doc DOC document
C-130 ISO Stand Questions 9 July 2008.doc DOC document
C-130 ISO Stand Questions 8 Jul 08.doc DOC document
C-130 Stretch Profile.pdf PDF
C-130 Side.pdf PDF
C-130 Top.pdf PDF
C-130 Front_1.pdf PDF
Amendment 0001.doc DOC document
PD06WRGBZOENF34 Revision 1 2 July 2008.pdf PDF
9579776G.doc DOC document
9579777A.doc DOC document
C130 ISO Stand Questions 6-20-08.doc DOC document
A006ConferenceMinutes.pdf PDF
Attachment3Transmitallttr.pdf PDF
A009InstructionalMediaPackage.pdf PDF
Attachment2PPPQuestionnaire.pdf PDF
Attachment1Factssheets.pdf PDF
SOW.pdf PDF
C001.pdf PDF
A003EngineeringCalculations.pdf PDF
C-130 ISO Stand Using Activities.doc DOC document
FA853308R20817 20 May 08.doc DOC document
Attachment4ClientAuthorization.pdf PDF
AFMC Form 158.xfd —
B001.pdf PDF
A0073DComputerModeling.pdf PDF
Attachment6Subkconsentform.pdf PDF
A00AA004ECPNOR.pdf PDF
D002ProvSDFP.pdf PDF
A008WeldingProcedures.pdf PDF
A005ConferenceAgenda.pdf PDF
PD06WRGBZOENF34_ —
D001ProvLMI.pdf PDF
Attachment5PPPQTR.pdf PDF
A001A002.pdf PDF
B001ProductDrawings.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional RFI Questions: Please respond by 22 April 2008

1. Are there any business practices unique to your industry? If so, please describe.

2. Is your company willing to provide a product drawing with unlimited rights which meets the requirements of our PD? (Copy of DD1423 attached.)

3. What is the estimated time period for installation of one of these stands at a field location? Estimated number of people needed to assemble?

4. What is the estimated production time for the first pre-production unit? What would be the lead-time for the production units? What is your maximum manufacturing capacity per month?

5. Will you have critical subcontractors to assist with this effort? If so, in what capacity will they be involved?

File details come from the government source that posted it. Updated .