This document is a Contract Data Requirements List (CDRL) that describes a set of 28 acceptance test procedures for various line replaceable units (LRUs) and shop replaceable units (SRUs) that are part of the AN/ALE-47 Countermeasures Dispenser System (CMDS). The CDRL specifies the requirements for developing, submitting, and approving the test procedures for items such as the Control Display Unit, Programmer, Sequencer, Signal Conditioner, and other CMDS components. Key details include distribution statements, submission timelines, document format requirements, and the procuring organization of AFLCMC/HBY. This CDRL is associated with a pre-solicitation for the ALE-47 CMDS Hardware Procurement, which will be a Firm-Fixed Price contract issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base. The solicitation is anticipated to be released around April 2024 with award around June 2025, using Tradeoff source selection procedures.
View the file
Other files for this federal contract opportunity
Show all 50
ALE-47 Countermeasures Dispenser System (CMDS) Hardware Procurement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA01
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures – Control Display Unit
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA02
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Power Supply/Connector Interface CCA
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA03
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Power Supply Module CCA
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA04
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Discrete I/O Module Assembly
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA05
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Discrete I/O
CCA
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA06
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU CPU Module Assembly
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA07
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU CPU CCA
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA08
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Electronic Indicating Panel Assembly
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA09
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Front Panel
I/O CCA
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0A
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Switch Panel (Front Panel) CCA
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0B
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - CDU Panel, Control, Elect (Faceplate)
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0C
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - Programmer
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0D
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - Programmer
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0E
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - Programmer
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0F
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - PGMR Electronic Enclosure Assembly
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0G
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - PGMR Motherboard No. 1
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 3: Concatenate the subtitle shown on Exhibit D Attachment #1 and Block 3 above. Example: For CDRL A001, the subtitle will be "Control Display Unit Acceptance Test Report".
Block 4: Contract format is acceptable.
Block 7: The contractor shall provide a Letter of Transmittal for each submission and a final LT for the cumulative CDRL.
Block 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD contractors only [Controlled Technical Information (CTI)] [22 October 2024]. Other requests for this document shall be referred to AFLCMC/HBY 320 Richard Ray Blvd, Bldg. 300 West Wing, Bay C Room C303, Robins AFB, GA 31098.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments. Modifications to the report shall be documented with future submissions.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
Block 12, 13: The Acceptance Test Procedure shall be submitted Not Later Than (NLT) 75 calendar days prior to test. Government response will be provided with 30 calendar days after submittal. Resubmit, if required, to incorporate Government comments within 15 calendar days of receipt of Government comments.
Block 14: Data Copies shall be submitted in accordance with (IAW) the General Notes. Data shall be in editable electronic document format and Microsoft Office 2016 or newer.
AFLCMC/HBY 0 0 1
15. TOTAL 0 0 1
G. PREPARED BY
JENNIFER NOE
H. DATE
2024/10/29
I. APPROVED BY
UPSHAW.MEDINA.NANCY.1075468403
J. DATE
2024/10/29
18. ESTIMATED
TOTAL PRICE
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
100X
B. EXHIBIT
DA
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
VENDOR X
1. DATA ITEM NO.
DA0H
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures - PGMR CPU CCA
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
2.1.2.1, 2.1.2.2, 2.2.2.1, 2.2.2.2
6. REQUIRING OFFICE
AFLCMC/HBY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 3:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .