Attch_12_-_Section_L_Appendix_C_F-15_PDM_Pricing_Spreadsheet.xlsx

XLSX spreadsheet 169 KB Posted

Attached to
F-15 Programmed Depot Maintenance Kadena Air Base
Solicitation number
FA8505-17-R-0004
Issued by

About this file

Attch 12 - Section L Appendix C F-15 Pricing Spreadsheet

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

CLINDescriptionTypeQtyU/ITotal
BASIC
0001F-15C LaborFFP1Lot$ - 0
0002F-15D LaborFFP1Lot$ - 0
0003MaterialsCRNF1Lot$ - 0
0004TravelCRNF1Lot
0005DATA IAW FORM 1423NSP1Lot
0006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Basic Total$ - 0
OPTION I
1001F-15C LaborFFP1Lot$ - 0
1002F-15D LaborFFP1Lot$ - 0
1003MaterialsCRNF1Lot$ - 0
1004TravelCRNF1Lot
1005DATA IAW FORM 1423NSP1Lot
1006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option I Total$ - 0
OPTION II
2001F-15C LaborFFP1Lot$ - 0
2002F-15D LaborFFP1Lot$ - 0
2003MaterialsCRNF1Lot$ - 0
2004TravelCRNF1Lot
2005DATA IAW FORM 1423NSP1Lot
2006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option II Total$ - 0
OPTION III
3001F-15C LaborFFP1Lot$ - 0
3002F-15D LaborFFP1Lot$ - 0
3003MaterialsCRNF1Lot$ - 0
3004TravelCRNF1Lot
3005DATA IAW FORM 1423NSP1Lot
3006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option III Total$ - 0
OPTION IV
4001F-15C LaborFFP1Lot$ - 0
4002F-15D LaborFFP1Lot$ - 0
4003MaterialsCRNF1Lot$ - 0
4004TravelCRNF1Lot
4005DATA IAW FORM 1423NSP1Lot
4006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option IV Total$ - 0
OPTION V
5001F-15C LaborFFP1Lot$ - 0
5002F-15D LaborFFP1Lot$ - 0
5003MaterialsCRNF1Lot$ - 0
5004TravelCRNF1Lot
5005DATA IAW FORM 1423NSP1Lot
5006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option V Total$ - 0
OPTION VI
6001F-15C LaborFFP1Lot$ - 0
6002F-15D LaborFFP1Lot$ - 0
6003MaterialsCRNF1Lot$ - 0
6004TravelCRNF1Lot
6005DATA IAW FORM 1423NSP1Lot
6006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option VI Total$ - 0
OPTION VII
7001F-15C LaborFFP1Lot$ - 0
7002F-15D LaborFFP1Lot$ - 0
7003MaterialsCRNF1Lot$ - 0
7004TravelCRNF1Lot
7005DATA IAW FORM 1423NSP1Lot
7006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option VII Total$ - 0
OPTION VIII
8001F-15C LaborFFP1Lot$ - 0
8002F-15D LaborFFP1Lot$ - 0
8003MaterialsCRNF1Lot$ - 0
8004TravelCRNF1Lot
8005DATA IAW FORM 1423NSP1Lot
8006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option VIII Total$ - 0
OPTION IX
9001F-15C LaborFFP1Lot$ - 0
9002F-15D LaborFFP1Lot$ - 0
9003MaterialsCRNF1Lot$ - 0
9004TravelCRNF1Lot
9005DATA IAW FORM 1423NSP1Lot
9006 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option IX Total$ - 0
OPTION X
9101F-15C LaborFFP1Lot$ - 0
9102F-15D LaborFFP1Lot$ - 0
9103MaterialsCRNF1Lot$ - 0
9104TravelCRNF1Lot
9105DATA IAW FORM 1423NSP1Lot
9106 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option X Total$ - 0
OPTION XI
9201F-15C LaborFFP1Lot$ - 0
9202F-15D LaborFFP1Lot$ - 0
9203MaterialsCRNF1Lot$ - 0
9204TravelCRNF1Lot
9205DATA IAW FORM 1423NSP1Lot
9206 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot
Option XI Total$ - 0
OPTION XII (Option to Extend Services)
9301F-15C LaborFFP1Lot$ - 0
9302F-15D LaborFFP1Lot$ - 0
9303MaterialsCRNF1Lot$ - 0
9304TravelCRNF1Lot
9305DATA IAW FORM 1423NSP1Lot
9306 OPTIONDATA IAW FORM 1423- REPORTING ACTUALSFFP1Lot$ - 0
Option XII Total$ - 0
TOTAL
Grand Total$ - 0

Basic - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP0EA
0019INSTALLATION OF WING REPLACEMENTFFP0EA
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP0EA
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 0001 F-15C Model Labor.

Basic - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 84,717.54$ 762,457.86
0002F-15C PDMCRNF9LOT$ 1,958,672.37$ 17,628,051.33
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 118,346.16$ 1,065,115.44
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 76,699.46$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$141,471.00$ - 0
F-15D MODELS
0009In/Out Processing F-15D AircraftCRNF1LOT$ 85,631.68$ 85,631.68
0010F-15D PDMCRNF1LOT$ 2,128,514.45$ 2,128,514.45
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 118,346.16$ 118,346.16
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$243,775.60$ 243,775.60
0023GFP/GFE ExpensesCRNF1LOT$10,586.68$ 10,586.68
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 22,042,479.20
*Add-On Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option I - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F15-D Models
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP0EA
0019INSTALLATION OF WING REPLACEMENTFFP0EA
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP0EA
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 1001 F-15C Model Labor.

Option I - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 87,004.91$ 783,044.22
0002F-15C PDMCRNF9LOT$ 2,011,556.52$ 18,104,008.72
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 121,541.51$ 1,093,873.56
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 78,770.35$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 145,290.72$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 87,943.74$ 87,943.74
0010F-15D PDMCRNF1LOT$ 2,185,984.34$ 2,185,984.34
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 121,541.51$ 121,541.51
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$250,357.54$ 250,357.54
0023GFP/GFE ExpensesCRNF1LOT$10,872.52$ 10,872.52
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 22,637,626.14
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option II - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP9EA$ - 0
0019INSTALLATION OF WING REPLACEMENTFFP0EA
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP0EA
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 2001 F-15C Model Labor.

Option II - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 89,354.05$ 804,186.42
0002F-15C PDMCRNF9LOT$ 2,065,868.55$ 18,592,816.95
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 124,823.13$ 1,123,408.14
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 80,897.14$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 149,213.57$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 90,318.22$ 90,318.22
0010F-15D PDMCRNF1LOT$ 2,245,005.92$ 2,245,005.92
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 124,823.13$ 124,823.13
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$257,117.19$ 257,117.19
0023GFP/GFE ExpensesCRNF1LOT$11,166.08$ 11,166.08
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 23,248,842.04
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option III - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP9EA$ - 0
0019INSTALLATION OF WING REPLACEMENTFFP0EA
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP0EA
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 3001 F-15C Model Labor.

Option III - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 91,677.25$ 825,095.26
0002F-15C PDMCRNF9LOT$ 2,119,581.13$ 19,076,230.19
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 128,068.53$ 1,152,616.75
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF1LOT$ 83,000.47$ 83,000.47
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF1LOT$ 153,093.12$ 153,093.12
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 92,666.49$ 92,666.49
0010F-15D PDMCRNF1LOT$ 2,303,376.07$ 2,303,376.07
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 128,068.53$ 128,068.53
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$263,802.24$ 263,802.24
0023GFP/GFE ExpensesCRNF1LOT$11,456.40$ 11,456.40
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 24,089,405.53
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option IV - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP1EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP1EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP9EA$ - 0
0019INSTALLATION OF WING REPLACEMENTFFP0EA
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP9EA$ - 0
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 4001 F-15C Model Labor.

Option IV - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 93,969.18$ 845,722.64
0002F-15C PDMCRNF9LOT$ 2,172,570.66$ 19,553,135.95
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 131,270.24$ 1,181,432.17
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF1LOT$ 85,075.48$ 85,075.48
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF1LOT$ 156,920.45$ 156,920.45
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 94,983.15$ 94,983.15
0010F-15D PDMCRNF1LOT$ 2,360,960.47$ 2,360,960.47
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 131,270.24$ 131,270.24
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$270,397.30$ 270,397.30
0023GFP/GFE ExpensesCRNF1LOT$11,742.81$ 11,742.81
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 24,691,640.67
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option V - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP9EA$ - 0
0019INSTALLATION OF WING REPLACEMENTFFP9EA$ - 0
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP9EA$ - 0
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor.

Option V - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 96,318.41$ 866,865.71
0002F-15C PDMCRNF9LOT$ 2,226,884.93$ 20,041,964.35
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 134,552.00$ 1,210,967.98
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 87,202.37$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 160,843.46$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 97,357.73$ 97,357.73
0010F-15D PDMCRNF1LOT$ 2,419,984.48$ 2,419,984.48
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 134,552.00$ 134,552.00
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$277,157.23$ 277,157.23
0023GFP/GFE ExpensesCRNF1LOT$12,036.38$ 12,036.38
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 25,060,885.85
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option VI - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP9EA$ - 0
0019INSTALLATION OF WING REPLACEMENTFFP9EA$ - 0
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP9EA$ - 0
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor.

Option VI - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 98,726.37$ 888,537.35
0002F-15C PDMCRNF9LOT$ 2,282,557.05$ 20,543,013.45
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 137,915.80$ 1,241,242.18
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 89,382.43$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 164,864.54$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 99,791.67$ 99,791.67
0010F-15D PDMCRNF1LOT$ 2,480,484.10$ 2,480,484.10
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 137,915.80$ 137,915.80
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$284,086.16$ 284,086.16
0023GFP/GFE ExpensesCRNF1LOT$12,337.29$ 12,337.29
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 25,687,408.00
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option VII - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP9EA$ - 0
0019INSTALLATION OF WING REPLACEMENTFFP9EA$ - 0
0020INSTALLATION OF 626 BULKHEADFFP0EA
0021INSTALLATION OF EPAWSSFFP9EA$ - 0
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor.

Option VII - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 101,194.53$ 910,750.79
0002F-15C PDMCRNF9LOT$ 2,339,620.98$ 21,056,588.79
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 141,363.69$ 1,272,273.23
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 91,616.99$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 168,986.16$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 102,286.47$ 102,286.47
0010F-15D PDMCRNF1LOT$ 2,542,496.20$ 2,542,496.20
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 141,363.69$ 141,363.69
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$291,188.32$ 291,188.32
0023GFP/GFE ExpensesCRNF1LOT$12,645.72$ 12,645.72
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 26,329,593.20
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option VIII - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP0EA
0019INSTALLATION OF WING REPLACEMENTFFP9EA$ - 0
0020INSTALLATION OF 626 BULKHEADFFP9EA$ - 0
0021INSTALLATION OF EPAWSSFFP9EA$ - 0
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor.

Option VIII - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 103,724.40$ 933,519.56
0002F-15C PDMCRNF9LOT$ 2,398,111.50$ 21,583,003.51
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 144,897.78$ 1,304,080.06
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 93,907.41$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 173,210.81$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 104,843.63$ 104,843.63
0010F-15D PDMCRNF1LOT$ 2,606,058.60$ 2,606,058.60
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 144,897.78$ 144,897.78
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$298,468.02$ 298,468.02
0023GFP/GFE ExpensesCRNF1LOT$12,961.86$ 12,961.86
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 26,987,833.03
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option IX - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP0EA
0019INSTALLATION OF WING REPLACEMENTFFP9EA$ - 0
0020INSTALLATION OF 626 BULKHEADFFP9EA$ - 0
0021INSTALLATION OF EPAWSSFFP9EA$ - 0
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor.

Option IX - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 106,317.51$ 956,857.55
0002F-15C PDMCRNF9LOT$ 2,458,064.29$ 22,122,578.60
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 148,520.23$ 1,336,682.06
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 96,255.10$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 177,541.08$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 107,464.72$ 107,464.72
0010F-15D PDMCRNF1LOT$ 2,671,210.07$ 2,671,210.07
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 148,520.23$ 148,520.23
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$305,929.72$ 305,929.72
0023GFP/GFE ExpensesCRNF1LOT$13,285.91$ 13,285.91
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 27,662,528.86
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option X - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP0EA
0019INSTALLATION OF WING REPLACEMENTFFP9EA$ - 0
0020INSTALLATION OF 626 BULKHEADFFP9EA$ - 0
0021INSTALLATION OF EPAWSSFFP0EA
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor.

Option X - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 108,975.44$ 980,778.98
0002F-15C PDMCRNF9LOT$ 2,519,515.90$ 22,675,643.06
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 152,233.24$ 1,370,099.12
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 98,661.48$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 181,979.61$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 110,151.34$ 110,151.34
0010F-15D PDMCRNF1LOT$ 2,737,990.32$ 2,737,990.32
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 152,233.24$ 152,233.24
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$313,577.97$ 313,577.97
0023GFP/GFE ExpensesCRNF1LOT$13,618.06$ 13,618.06
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 28,354,092.08
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

Option XI - Labor

Item No.Description: LaborTYPEQTY of ACFTU/IUnit PriceHourly RateExtended Price
F-15C MODELS
0001In and Out Processing F-15C AircraftFFP9EA$ - 0
0002F-15C PDMFFP9EA$ - 0
0003Analytical Condition InpsectionFFP2EA$ - 0
0004F-15C Wing Work IAW Appendix AFFP9EA$ - 0
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentFFP0EA$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationFFP0EA$ - 0
0007F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0008F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftFFP1EA$ - 0
0010F-15D PDMFFP1EA$ - 0
0011F-15D Wing Work IAW Appendix AFFP0EA
0012F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6FFP Hourly Rate1LOT
0013F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS

OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY

THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18FFP Hourly Rate1LOT
Total:$ - 0
*F-15C/F-15D Models
0014Over and Above IAW PWS Para 5.8FFP Hourly Rate1LOT
0015Over and Above IAW PWS Para 5.9FFP Hourly Rate1LOT
0016UNSCHEDULED DEPOT LEVEL MAINTENANCEFFP Hourly Rate1LOT
0017Dispatch Field TeamFFP Hourly Rate1LOT
0018INSTALLATION OF LONGERONFFP0EA
0019INSTALLATION OF WING REPLACEMENTFFP0EA
0020INSTALLATION OF 626 BULKHEADFFP9EA$ - 0
0021INSTALLATION OF EPAWSSFFP0EA
Total:$ - 0
NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items.
*For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor.

Option XI - Material

Item No.Description: MaterialTYPEQTY of ACFTU/IUnit CostExtended Cost
F-15C MODELS
0001In and Out Processing F-15C AircraftCRNF9LOT$ 111,699.83$ 1,005,298.46
0002F-15C PDMCRNF9LOT$ 2,582,503.79$ 23,242,534.14
0003Reserved
0004F-15C Wing Repair IAW Appendix ACRNF9LOT$ 156,039.07$ 1,404,351.59
0005F-15C Installation of TCTO 1F-15-1571 Flight Control RefurbishmentCRNF0LOT$ 101,128.01$ - 0
0006F-15C Installation of TCTO 1F-15-1581 Nozzel ReconfigurationCRNF0LOT$ 186,529.10$ - 0
F-15D MODELS
0009In and Out Processing F-15D AircraftCRNF1LOT$ 112,905.12$ 112,905.12
0010F-15D PDMCRNF1LOT$ 2,806,440.08$ 2,806,440.08
0011F-15D Wing Repair IAW Appendix ACRNF1LOT$ 156,039.07$ 156,039.07
F-15C/F-15D Models
0022Contractor Furnished Materials in Support
of Labor Item No. 0007-0008, 0012-0017CRNF1LOT$321,417.42$ 321,417.42
0023GFP/GFE ExpensesCRNF1LOT$13,958.51$ 13,958.51
0024Local Manufacture of Support EquipmentCRNF1LOTTBDTBD
Sub-Total$ 29,062,944.38
*Add-on Factor
Total$ - 0
*Add-on Factors shall be expressed as 1.xxxx, not percentages.

File details come from the government source that posted it. Updated .