| CLIN | Description | Type | Qty | U/I | Total |
| BASIC | | | | | |
| 0001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 0002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 0003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 0004 | Travel | CRNF | 1 | Lot | |
| 0005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 0006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Basic Total | | | | | $ - 0 |
| OPTION I | | | | | |
| 1001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 1002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 1003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 1004 | Travel | CRNF | 1 | Lot | |
| 1005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 1006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option I Total | | | | | $ - 0 |
| OPTION II | | | | | |
| 2001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 2002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 2003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 2004 | Travel | CRNF | 1 | Lot | |
| 2005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 2006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option II Total | | | | | $ - 0 |
| OPTION III | | | | | |
| 3001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 3002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 3003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 3004 | Travel | CRNF | 1 | Lot | |
| 3005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 3006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option III Total | | | | | $ - 0 |
| OPTION IV | | | | | |
| 4001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 4002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 4003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 4004 | Travel | CRNF | 1 | Lot | |
| 4005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 4006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option IV Total | | | | | $ - 0 |
| OPTION V | | | | | |
| 5001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 5002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 5003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 5004 | Travel | CRNF | 1 | Lot | |
| 5005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 5006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option V Total | | | | | $ - 0 |
| OPTION VI | | | | | |
| 6001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 6002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 6003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 6004 | Travel | CRNF | 1 | Lot | |
| 6005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 6006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option VI Total | | | | | $ - 0 |
| OPTION VII | | | | | |
| 7001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 7002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 7003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 7004 | Travel | CRNF | 1 | Lot | |
| 7005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 7006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option VII Total | | | | | $ - 0 |
| OPTION VIII | | | | | |
| 8001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 8002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 8003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 8004 | Travel | CRNF | 1 | Lot | |
| 8005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 8006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option VIII Total | | | | | $ - 0 |
| OPTION IX | | | | | |
| 9001 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 9002 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 9003 | Materials | CRNF | 1 | Lot | $ - 0 |
| 9004 | Travel | CRNF | 1 | Lot | |
| 9005 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 9006 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option IX Total | | | | | $ - 0 |
| OPTION X | | | | | |
| 9101 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 9102 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 9103 | Materials | CRNF | 1 | Lot | $ - 0 |
| 9104 | Travel | CRNF | 1 | Lot | |
| 9105 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 9106 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option X Total | | | | | $ - 0 |
| OPTION XI | | | | | |
| 9201 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 9202 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 9203 | Materials | CRNF | 1 | Lot | $ - 0 |
| 9204 | Travel | CRNF | 1 | Lot | |
| 9205 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 9206 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | |
| Option XI Total | | | | | $ - 0 |
| OPTION XII (Option to Extend Services) | | | | | |
| 9301 | F-15C Labor | FFP | 1 | Lot | $ - 0 |
| 9302 | F-15D Labor | FFP | 1 | Lot | $ - 0 |
| 9303 | Materials | CRNF | 1 | Lot | $ - 0 |
| 9304 | Travel | CRNF | 1 | Lot | |
| 9305 | DATA IAW FORM 1423 | NSP | 1 | Lot | |
| 9306 OPTION | DATA IAW FORM 1423- REPORTING ACTUALS | FFP | 1 | Lot | $ - 0 |
| Option XII Total | | | | | $ - 0 |
Basic - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | | | | |
| | | Total: | | | | $ - 0 |
| | | F-15D MODELS | | | | |
| | 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| | 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| | 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| | 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| | 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 0 | EA | |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 0 | EA | |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 0 | EA | |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 0001 F-15C Model Labor. |
Basic - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 84,717.54 | $ 762,457.86 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 1,958,672.37 | $ 17,628,051.33 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 118,346.16 | $ 1,065,115.44 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 76,699.46 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $141,471.00 | $ - 0 |
| | | F-15D MODELS | | | | | |
| | 0009 | In/Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 85,631.68 | $ 85,631.68 |
| | 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,128,514.45 | $ 2,128,514.45 |
| | 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 118,346.16 | $ 118,346.16 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $243,775.60 | $ 243,775.60 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $10,586.68 | $ 10,586.68 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 22,042,479.20 |
| *Add-On Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option I - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F15-D Models | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 0 | EA | |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 0 | EA | |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 0 | EA | |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 1001 F-15C Model Labor. |
Option I - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 87,004.91 | $ 783,044.22 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,011,556.52 | $ 18,104,008.72 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 121,541.51 | $ 1,093,873.56 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 78,770.35 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 145,290.72 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 87,943.74 | $ 87,943.74 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,185,984.34 | $ 2,185,984.34 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 121,541.51 | $ 121,541.51 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $250,357.54 | $ 250,357.54 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $10,872.52 | $ 10,872.52 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 22,637,626.14 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option II - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 9 | EA | $ - 0 |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 0 | EA | |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 0 | EA | |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 2001 F-15C Model Labor. |
Option II - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 89,354.05 | $ 804,186.42 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,065,868.55 | $ 18,592,816.95 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 124,823.13 | $ 1,123,408.14 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 80,897.14 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 149,213.57 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 90,318.22 | $ 90,318.22 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,245,005.92 | $ 2,245,005.92 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 124,823.13 | $ 124,823.13 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $257,117.19 | $ 257,117.19 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $11,166.08 | $ 11,166.08 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 23,248,842.04 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option III - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | | | | |
| | | Total: | | | | $ - 0 |
| | | F-15D MODELS | | | | |
| | 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| | 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| | 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| | 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| | 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 9 | EA | $ - 0 |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 0 | EA | |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 0 | EA | |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 3001 F-15C Model Labor. | | | | | |
Option III - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 91,677.25 | $ 825,095.26 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,119,581.13 | $ 19,076,230.19 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 128,068.53 | $ 1,152,616.75 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 1 | LOT | $ 83,000.47 | $ 83,000.47 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 1 | LOT | $ 153,093.12 | $ 153,093.12 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 92,666.49 | $ 92,666.49 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,303,376.07 | $ 2,303,376.07 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 128,068.53 | $ 128,068.53 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $263,802.24 | $ 263,802.24 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $11,456.40 | $ 11,456.40 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 24,089,405.53 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option IV - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 1 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 1 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | | | | |
| | | Total: | | | | $ - 0 |
| | | F-15D MODELS | | | | |
| | 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| | 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| | 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| | 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| | 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 9 | EA | $ - 0 |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 0 | EA | |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 9 | EA | $ - 0 |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 4001 F-15C Model Labor. | | | | | |
Option IV - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 93,969.18 | $ 845,722.64 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,172,570.66 | $ 19,553,135.95 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 131,270.24 | $ 1,181,432.17 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 1 | LOT | $ 85,075.48 | $ 85,075.48 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 1 | LOT | $ 156,920.45 | $ 156,920.45 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 94,983.15 | $ 94,983.15 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,360,960.47 | $ 2,360,960.47 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 131,270.24 | $ 131,270.24 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $270,397.30 | $ 270,397.30 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $11,742.81 | $ 11,742.81 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 24,691,640.67 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option V - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 9 | EA | $ - 0 |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 9 | EA | $ - 0 |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 9 | EA | $ - 0 |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor. | | | | | |
Option V - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 96,318.41 | $ 866,865.71 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,226,884.93 | $ 20,041,964.35 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 134,552.00 | $ 1,210,967.98 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 87,202.37 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 160,843.46 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 97,357.73 | $ 97,357.73 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,419,984.48 | $ 2,419,984.48 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 134,552.00 | $ 134,552.00 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $277,157.23 | $ 277,157.23 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $12,036.38 | $ 12,036.38 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 25,060,885.85 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option VI - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 9 | EA | $ - 0 |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 9 | EA | $ - 0 |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 9 | EA | $ - 0 |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor. | | | | | |
Option VI - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 98,726.37 | $ 888,537.35 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,282,557.05 | $ 20,543,013.45 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 137,915.80 | $ 1,241,242.18 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 89,382.43 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 164,864.54 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 99,791.67 | $ 99,791.67 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,480,484.10 | $ 2,480,484.10 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 137,915.80 | $ 137,915.80 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $284,086.16 | $ 284,086.16 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $12,337.29 | $ 12,337.29 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 25,687,408.00 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option VII - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 9 | EA | $ - 0 |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 9 | EA | $ - 0 |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 0 | EA | |
| 0021 | INSTALLATION OF EPAWSS | FFP | 9 | EA | $ - 0 |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor. | | | | | |
Option VII - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 101,194.53 | $ 910,750.79 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,339,620.98 | $ 21,056,588.79 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 141,363.69 | $ 1,272,273.23 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 91,616.99 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 168,986.16 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 102,286.47 | $ 102,286.47 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,542,496.20 | $ 2,542,496.20 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 141,363.69 | $ 141,363.69 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $291,188.32 | $ 291,188.32 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $12,645.72 | $ 12,645.72 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 26,329,593.20 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option VIII - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 0 | EA | |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 9 | EA | $ - 0 |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 9 | EA | $ - 0 |
| 0021 | INSTALLATION OF EPAWSS | FFP | 9 | EA | $ - 0 |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor. | | | | | |
Option VIII - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 103,724.40 | $ 933,519.56 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,398,111.50 | $ 21,583,003.51 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 144,897.78 | $ 1,304,080.06 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 93,907.41 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 173,210.81 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 104,843.63 | $ 104,843.63 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,606,058.60 | $ 2,606,058.60 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 144,897.78 | $ 144,897.78 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $298,468.02 | $ 298,468.02 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $12,961.86 | $ 12,961.86 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 26,987,833.03 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option IX - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 0 | EA | |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 9 | EA | $ - 0 |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 9 | EA | $ - 0 |
| 0021 | INSTALLATION OF EPAWSS | FFP | 9 | EA | $ - 0 |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor. | | | | | |
Option IX - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 106,317.51 | $ 956,857.55 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,458,064.29 | $ 22,122,578.60 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 148,520.23 | $ 1,336,682.06 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 96,255.10 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 177,541.08 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 107,464.72 | $ 107,464.72 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,671,210.07 | $ 2,671,210.07 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 148,520.23 | $ 148,520.23 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $305,929.72 | $ 305,929.72 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $13,285.91 | $ 13,285.91 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 27,662,528.86 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option X - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 0 | EA | |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 9 | EA | $ - 0 |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 9 | EA | $ - 0 |
| 0021 | INSTALLATION OF EPAWSS | FFP | 0 | EA | |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor. | | | | | |
Option X - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 108,975.44 | $ 980,778.98 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,519,515.90 | $ 22,675,643.06 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 152,233.24 | $ 1,370,099.12 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 98,661.48 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 181,979.61 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 110,151.34 | $ 110,151.34 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,737,990.32 | $ 2,737,990.32 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 152,233.24 | $ 152,233.24 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $313,577.97 | $ 313,577.97 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $13,618.06 | $ 13,618.06 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 28,354,092.08 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |
Option XI - Labor
| Item No. | Description: Labor | TYPE | QTY of ACFT | U/I | Unit Price | Hourly Rate | Extended Price |
| F-15C MODELS | | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | FFP | 9 | EA | | | $ - 0 |
| 0002 | F-15C PDM | FFP | 9 | EA | | | $ - 0 |
| 0003 | Analytical Condition Inpsection | FFP | 2 | EA | | | $ - 0 |
| 0004 | F-15C Wing Work IAW Appendix A | FFP | 9 | EA | | | $ - 0 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | FFP | 0 | EA | | | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | FFP | 0 | EA | | | $ - 0 |
| 0007 | F-15C ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | | | |
| 0008 | F-15C CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| F-15D MODELS | | | | |
| 0009 | In and Out Processing F-15D Aircraft | FFP | 1 | EA | $ - 0 |
| 0010 | F-15D PDM | FFP | 1 | EA | $ - 0 |
| 0011 | F-15D Wing Work IAW Appendix A | FFP | 0 | EA | |
| 0012 | F-15D ACCOMPLISH URGENT AND IMMEDIATE ACTION TECHNICAL ORDERS IAW APPENDIX A, PARA 1.9.2.6 | FFP Hourly Rate | 1 | LOT | |
| 0013 | F-15D CORRECT O&I LEVEL DISCREPANCIES OF SYSTEMS LISTED ON AIRCRAFT 781 FORMS | | | | |
OR SUBMITTED BY INCOMING FLIGHT CREWS THAT ARE NOT OTHERWISE DIRECTED BY
| THIS SPECIFICATION IAW APPENDIX A, ADDENDUM PARA 1.1.18 | FFP Hourly Rate | 1 | LOT | |
| | | Total: | $ - 0 |
| *F-15C/F-15D Models | | | | |
| 0014 | Over and Above IAW PWS Para 5.8 | FFP Hourly Rate | 1 | LOT | |
| 0015 | Over and Above IAW PWS Para 5.9 | FFP Hourly Rate | 1 | LOT | |
| 0016 | UNSCHEDULED DEPOT LEVEL MAINTENANCE | FFP Hourly Rate | 1 | LOT | |
| 0017 | Dispatch Field Team | FFP Hourly Rate | 1 | LOT | |
| 0018 | INSTALLATION OF LONGERON | FFP | 0 | EA | |
| 0019 | INSTALLATION OF WING REPLACEMENT | FFP | 0 | EA | |
| 0020 | INSTALLATION OF 626 BULKHEAD | FFP | 9 | EA | $ - 0 |
| 0021 | INSTALLATION OF EPAWSS | FFP | 0 | EA | |
| Total: | | | | $ - 0 |
| NOTE: IGE of 4,451 annual hours for FFP Hourly Rate Items. | | | | | |
| *For evaluation purposes only, the F-15C/F-15D Models prices will be added to CLIN 5001 F-15C Model Labor. | | | | | |
Option XI - Material
| Item No. | Description: Material | TYPE | QTY of ACFT | U/I | Unit Cost | Extended Cost |
| F-15C MODELS | | | | | |
| 0001 | In and Out Processing F-15C Aircraft | CRNF | 9 | LOT | $ 111,699.83 | $ 1,005,298.46 |
| 0002 | F-15C PDM | CRNF | 9 | LOT | $ 2,582,503.79 | $ 23,242,534.14 |
| 0003 | Reserved | | | | | |
| 0004 | F-15C Wing Repair IAW Appendix A | CRNF | 9 | LOT | $ 156,039.07 | $ 1,404,351.59 |
| 0005 | F-15C Installation of TCTO 1F-15-1571 Flight Control Refurbishment | CRNF | 0 | LOT | $ 101,128.01 | $ - 0 |
| 0006 | F-15C Installation of TCTO 1F-15-1581 Nozzel Reconfiguration | CRNF | 0 | LOT | $ 186,529.10 | $ - 0 |
| F-15D MODELS | | | | | |
| 0009 | In and Out Processing F-15D Aircraft | CRNF | 1 | LOT | $ 112,905.12 | $ 112,905.12 |
| 0010 | F-15D PDM | CRNF | 1 | LOT | $ 2,806,440.08 | $ 2,806,440.08 |
| 0011 | F-15D Wing Repair IAW Appendix A | CRNF | 1 | LOT | $ 156,039.07 | $ 156,039.07 |
| | | F-15C/F-15D Models | | | | | |
| | 0022 | Contractor Furnished Materials in Support | | | | | |
| of Labor Item No. 0007-0008, 0012-0017 | CRNF | 1 | LOT | $321,417.42 | $ 321,417.42 | | | |
| | 0023 | GFP/GFE Expenses | CRNF | 1 | LOT | $13,958.51 | $ 13,958.51 |
| | 0024 | Local Manufacture of Support Equipment | CRNF | 1 | LOT | TBD | TBD |
| Sub-Total | | $ 29,062,944.38 |
| *Add-on Factor | | |
| Total | | $ - 0 |
| *Add-on Factors shall be expressed as 1.xxxx, not percentages. | |