Lab Floorplan.pdf

PDF 17 KB Posted

Attached to
Robins AFB LCMC/EBUG Lab Wall and Flooring Renovation
Solicitation number
FA850125Q0009
Issued by

About this file

This file is a floor plan drawing showing the layout of a lab space renovation project at Robins AFB. The drawing depicts a lab space with an 11'4" ceiling height, a TA Office, and a Conference Room. A key feature is a DIRTT wall section that includes a sliding door. The floor plan appears to be part of the specifications for installing moveable DIRTT walls as part of the LCMC/EBUG Lab renovation project.

The floor plan represents a portion of the scope for solicitation FA850125Q0009, which requires installation of DIRTT brand moveable walls with electrical connections and luxury vinyl tile flooring. The drawing provides spatial context and specifications needed for contractors to understand the wall system installation requirements for this Air Force Sustainment Center project.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sliding Door

|-------------DIRTT Wall Section----------------|

1506366280A Highlight

File details come from the government source that posted it. Updated .