This is a Questions and Answers document for solicitation FA850125Q0009 for the LCMC EBUG Lab Wall and Flooring Renovation project at Robins AFB. The document clarifies that the project involves installing 18 linear feet of DIRTT moveable walls in an L-shape configuration, with one sliding door large enough to accommodate lab equipment movement. The walls will extend from floor to ceiling (approximately 11'4" height) and will be solid walls without glass. The project also includes electrical connections and luxury vinyl tile (LVT) flooring installation.

The document indicates that site visits are required and must be coordinated through Captain Calvin Garcia. While no specific cost estimate or definitive start date is provided, the Air Force hopes to award the contract by mid-February, with the period of performance beginning upon award. The Air Force Materiel Command Air Force Sustainment Center is the contracting agency for this commercial, competitive procurement.

View the file

Other files for this federal contract opportunity

Other files attached to Robins AFB LCMC/EBUG Lab Wall and Flooring Renovation, newest first.
File Type Posted
FA850125Q0009 Questions and Answers v2.docx DOCX document
Lab Floorplan.pdf PDF
FA850125Q0009 Questions and Answers v2.docx DOCX document
FA850125Q0009 Questions and Answers v2.docx DOCX document
FA850125Q0009 Questions and Answers.docx DOCX document
A003 ESOH Plan_Signed.pdf PDF
EBUG Lab Wall SOW.pdf PDF
LCMC EBUG single source justification-redacted_Redacted.pdf PDF
A001 Product Engineering Design and Assocaiated Lists_Signed.pdf PDF
A002 Preparation of Final Inspection_Signed.pdf PDF
Solicitation - FA850125Q0009.pdf PDF
A004 Accident_Incident Report_Signed.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA850125Q0009 Questions and Answers

1. Could you please provide photos of the existing walls and floors that need to be removed and replaced?

a) Please reference SOW paragraph 2.0. This paragraph discusses site-visits and the timeframe within which they must be scheduled. Please find the Government POC’s information below:

Captain Calvin Garcia, Email (preferred): calvin.garcia.1@us.af.mil, Phone: 478-222-7518

2. Could you also provide images of any electrical outlets on the existing walls that are part of the renovation scope?

a) Please reference SOW paragraph 2.0. This paragraph discusses site-visits and the timeframe within which they must be scheduled. Please find the Government POC’s information below:

Captain Calvin Garcia, Email (preferred): calvin.garcia.1@us.af.mil, Phone: 478-222-7518

3. Is there a cost estimate , budget or ballpark figure for the project listed? Is there an actual start date for the project?

a) The Government does not provide a cost estimate. There is no definitive start date. The contract start date will depend on the date of award. We hope to award sometime around the middle of February, and the period of performance will begin upon receipt of award.

4. After speaking with multiple contractors and reviewing the SOW, they have all requested the Layout of the walls that is wanted (L shape,Straight,U shape) and position of door and a floor plan and dimensions of the room in which the walls and floors are to be installed. I am unable to find these details in the documents provided on Sam. I apologize if I missed them. If not could you please send me the information so I may quote the contract as accurate as possible.

a) In total it’s 18 linear feet, in an L shape, with most of it being one long straight shot, and then a small portion to connect with an existing wall.

1. We have added an additional attachment for the layout for your reference, but please keep in mind that the goal was to plan site visits with the requirement owner to clarify such information.

5. The DIRTT spec calls out an 8’H horizontal reveal with a solidstory. Does the wall height stop at 8’H or does it go all the way to the ceiling?

a) All the way to the ceiling.

6. Are all walls to be solid/ no glass?

a) Solid walls.

7. The floorplan shows double doors. Pleas confirm that only 1 sliding door is needed.

a) Correct, 1 sliding door it needs to be a large size that will accommodate moving lab equipment in and out without issue.

8. Should we assume the overall ceiling height is 11’-4” as listed on the floorplan then?

a) +/- 1”