About this file

This is a Contract Data Requirements List (CDRL) form DD 1423 that specifies the requirements for a Final Inspection Report (CDRL item A002) related to the LCMC/EBUG Lab renovation project at Robins AFB. The document outlines the requirements for the contractor to develop an inspection/acceptance checklist to validate product installation according to manufacturer guidelines and customer specifications.

The CDRL requires the contractor to conduct a joint walkthrough with the Government Project Manager to document areas needing correction in a punch list, with no payment authorized while punch list items remain open. The final inspection report must include a cover page with contract information, manufacturer details, and specification references, along with data collection sheets documenting inspection characteristics and pass/fail dispositions. The document falls under Distribution Statement D (limited to DoD and DoD contractors) and must be submitted to carl.eddy@us.af.mil. The CDRL was approved by Capt. Calvin O. Garcia on January 22, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Robins AFB LCMC/EBUG Lab Wall and Flooring Renovation, newest first.
File Type Posted
FA850125Q0009 Questions and Answers v2.docx DOCX document
FA850125Q0009 Questions and Answers v2.docx DOCX document
Lab Floorplan.pdf PDF
FA850125Q0009 Questions and Answers v2.docx DOCX document
FA850125Q0009 Questions and Answers v2.docx DOCX document
FA850125Q0009 Questions and Answers.docx DOCX document
A001 Product Engineering Design and Assocaiated Lists_Signed.pdf PDF
A003 ESOH Plan_Signed.pdf PDF
EBUG Lab Wall SOW.pdf PDF
LCMC EBUG single source justification-redacted_Redacted.pdf PDF
Solicitation - FA850125Q0009.pdf PDF
A004 Accident_Incident Report_Signed.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"

CurrentPage:
PageCount:
Select Classification from drop-down list.: 1
CUI Indicator Information:
Click on this button to attach a file(s).:
A. CONTRACT LINE ITEM NUMBER: 0001
exhibit: A
C. CATEGORY: Select for "TDP.": 0
C. CATEGORY: Select for "TM.": 0
C. CATEGORY: Select for "OTHER.": 1
C. CATEGORY: Enter specification for "Other.":
System: EBU LAB RENOVATION
ContractNum: FD2060-25-30974
Contractor: TBD
1. DATA ITEM NUMBER: A002
titleDataItem: Preparation of Final Inspection
subtitle: Final Inspection Report
4. AUTHORITY (Data Acquisition Document Number): DI-SESS-81000F/T
contractRef: SOW Para 3.6
reqOffice: AFLCMC/EBU
7. DD 250 REQUIREMENT: DD
8. APPROVAL CODE : N/A
9. DISTRIBUTION STATEMENT REQUIRED: D
freq: ASREQ
asOfDate: N/A
dateFirstSub: ASREQ
dateSubseqSub: N/A
16. REMARKS: Blk 4: The Contractor shall develop an inspection/acceptance checklist to validate all product has been installed according to manufacturer guidelines and customer specifications.

Blk 4:

4.Content.

4.1. Cover page shall include:

4.1.1. Title.

4.1.2. Contract Number and corresponding CDRL Reference number.

4.1.3. Name of Manufacturer/Contractor Organization

4.1.5. Specification(s) Reference Number, Revision, and Date.

4.1.7. FIR document control ID reference number, Revision identifier, and Document effective Date.

4.2. Data Collection Sheets shall include:

4.2.1. Title: Name and Part Number/NSN of item being inspected and serial number.

4.2.2. Name of characteristic being inspected including reference number from Specification.

4.2.8. Data field to record Pass or Fail Disposition.

4.2.9. Data field to note corrections or corrective action activities for failures.

Blk 7 & 13: The Contractor shall complete a joint walk through with the Government Project Manager (GPM) designee and document all areas requiring correction in a punch list. No payment will be authorized while punch list items remain open. A final walk through will be performed with the contractor and the GPM to ensure all punch list items have been addressed to the satisfaction of the government.

Blk 9: Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only General Procurement and Acquisition 15 January 2025. Other requests for this document shall be referred to AFLCMC/EBU Air to Ground Branch.

Click to add continuation field for Remarks:
14. DISTRIBUTION - a. ADDRESSEE, new line: AFLCMC/EBU
14. DISTRIBUTION - a. ADDRESSEE, new line: 320 Richard Ray Blvd.
14. DISTRIBUTION - a. ADDRESSEE, new line: Robins AFB, GA 31098-
14. DISTRIBUTION - a. ADDRESSEE, new line: (P) GPM: Calvin Garcia
14. DISTRIBUTION - a. ADDRESSEE, new line: calvin.garcia.1@us.af.mi
14. DISTRIBUTION - a. ADDRESSEE, new line: (A) Carl Eddy
14. DISTRIBUTION - a. ADDRESSEE, new line: carl.eddy@us.af.mil
15.TOTAL - Total draft copies is automatically calculated.:
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final reproducible copies is automatically calculated.:
priceGrp:
estTotalPrice:
remarks:
preparedBy: Ellis Atkins
J. SIGNATURE: H. SIGNED ON 20250122
J. SIGNATURE: J. SIGNED ON 20250122
J. SIGNATURE:
approvedBy: Capt. Calvin O. Garcia
Click to add additional data items.:
Click to delete additional data items.:

File details come from the government source that posted it. Updated .