FA820219R1007.pdf

PDF 509 KB Posted

Attached to
A-10 PACAF DEPOT MAINTENANCE Federal contract opportunity
Solicitation number
FA8202-19-R-1007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to A-10 PACAF DEPOT MAINTENANCE, newest first.
File Type Posted
Question_Answer.docx DOCX document
Attac_5_Past_Performance_Information_Sheet.docx DOCX document
Question_Answer.docx DOCX document
Attch_2_PastPerformanceQuestionnaire.docx DOCX document
CY_PACAF_CLIN_Structure_10_YR_Extended.xlsx XLSX spreadsheet
Question_Answer.docx DOCX document
Performance_Work_Statement_(PWS).pdf PDF
CY_PACAF_CLIN_Structure_10_YR_Extended.xlsx XLSX spreadsheet
Attac_5_Past_Performance_Information_Sheet.docx DOCX document
Delivery_Schedule-Flow_Days.docx DOCX document
Attach_3_SubKtr_and_Joint_Venture_Partner_Consent.docx DOCX document
Contract_Data_Requirement_List_(CDRL).pdf PDF
Attch_2_PastPerformanceQuestionnaire.docx DOCX document
Section_L.pdf PDF
Attch_1_Past_Perf_Info_Sheet.docx DOCX document
Attach_4_Client_Authorization.docx DOCX document
Section_M.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8202-19-R-1007

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 488190

8(A) SIZE STANDARD: $32.5

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 90 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *90

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8202

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Other Support Activities for Air Transportation

9.

Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein.

All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*

20-MAY-2019 12:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFLCMC WWAK

6072 FIR AVENUE BLDG 1233

HILL AIR FORCE BASE UT 84056-5820

BUYER: Cale S. Barnard/AFLCMC cale.barnard@us.af.mil Phone: (801) 777- 8414 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA820219R1007

DUE: 20 MAY 2019 12:00 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Cale S Barnard/AFLCMC

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFLCMC WWAK

6072 FIR AVENUE BLDG 1233

HILL AIR FORCE BASE UT 84056-5820

FA8202-19-R-1007

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

NOTE TO CONTRACTOR: The minimum order guarantee is; 1 set - Pylon Re-wire.

Note that delivery schedule descriptions provided hereunder are dependent on orders placed against the Basic contract.

All places of performance are plant unless otherwise noted in the individual order.

The DODAAC and RIC codes for this contract are as follows:

DODAAC:

RIC:

Induction of Aircraft (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Equipment/Aircraft Structural Components Induction of Aircraft (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.8 - Receipt of Aircraft at Contractor Facility

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

AS9100 9100

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

5 EA TBC

Proposed Delivery

5 EA

Final Processing of Aircraft (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Equipment/Aircraft Structural Components Final Processing of Aircraft (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.11 - Final Processing of Aircraft

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

5 EA TBC

Proposed

5 EA

Scuff Sand / Paint Stand Alone (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Modification of Equipment/Aircraft Structural Components

Scuff Sand / Paint Stand Alone (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 4 - A-10C Paint Specifications

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Paint and Plastic Media Blast (PMB) Stand Alone (CY20)

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Paint and Plastic Media Blast (PMB) Stand Alone (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 4 - A-10C Paint Specifications

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Paint and Plastic Media Blast (PMB) with SSI/8YC (CY20)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 4 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Paint and Plastic Media Blast (PMB) with SSI/8YC (CY20)(CLIN pricing will not include SSI/8YC work) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 4 A-10C Paint Specifications

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

4 EA TBC

Proposed Period of

4 EA

Phase 1 Inspection Stand Alone (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Phase 1 Inspection Stand Alone (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.10.4.4. TO 1A-10C-6

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Phase 2 Inspection Stand Alone (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Phase 2 Inspection Stand Alone (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.10.4.4, TO 1A-10C-6

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

8YC Stand Alone (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components 8YC Stand Alone (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 7 - Eight Year Corrosion (8YC)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of

1 EA TBC

Proposed Period of Performance

1 EA

EWA Install Stand Alone (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

4 EA Price per Aircraft

K015 Modification of Equipment/Aircraft Structural Components EWA Install Stand Alone (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 6 - Enhanced Wing Assembly (EWS)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

4 EA TBC

Proposed Period of Performance

4 EA

8YC/EWA (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

8YC/EWA (CY20)

1 EA Price per Aircraft

K015 Maint & Repair of Equipment/Aircraft Structural Components

8YC/EWA (CY20)

In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 6 & 7 - Enhanced Wing Assembly (EWA) & Eight Year Corrosion (8YC)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Drop in Maintenance (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Hourly Rate

J015 Modification of Equipment/Aircraft Structural Components Drop in Maintenance (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 & 6 - A-10C Scheduled Structural Inspection (SSI) & Enhanced Wing Assembly (EWA)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Over and Above Labor (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Hourly Rate

K015 Modification of Equipment/Aircraft Structural Components Over and Above Labor (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.12 - Over and Above Work Procedures & DFARS Clause 252.217-7028 - Over and Above Work

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed

1 EA

Over and Above Materials (CY20)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Amount 1 EA Price per Aircraft

K015 Modification of Equipment/Aircraft Structural Components Over and Above Materials (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.12 - Over and Above Work Procedures

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required Period of Performance

1 EA TBD

Proposed Period of Performance

1 EA

Contract Field Team (CFT) Work (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA LO

J015 Modification of Equipment/Aircraft Structural Components Contract Field Team Work (CFT) (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.10.5.3 - Contract Field Team (CFT)

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Contract Field Team (CFT) Travel (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

100 LO To be Determined

K015 Modification of Equipment/Aircraft Structural Components Contract Field Team (CFT) Travel (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): 2.10.5.3.3 - Travel Requests Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Period of Performance

100 LO TBD

Proposed

Contract Field Team (CFT) Travel (CY20)

100 LO

Manufacture / Purchase of GFE/STE/ST (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA To be Determined

K015 Modification of Equipment/Aircraft Structural Components Manufacture/Purchase of GFE/STE/ST (CY20) As authorized by ACO Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Period of Performance

1 EA TBD

Proposed Period of Performance

1 EA

SURGE Requirement (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO To be Determined To be Determined

K015 Maint & Repair of Equipment/Aircraft Structural Components SURGE Requirement (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.10.5.2 - Surge Requirements

SURGE Requirement (CY20)

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Additional TCTO FFP (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA To be Determined

K015 Maint & Repair of Equipment/Aircraft Structural Components Additional TCTO FFP (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 2.10.3.1 - TCTO Accomplishments Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required

Additional TCTO FFP (CY20)

1 EA TBC

Proposed Period of Performance

1 EA

Data (CY20)

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

K015 Maint & Repair of Equipment/Aircraft Structural Components Data (CY20) In Accordance With (IAW): Attached DD form 1423 "EXHIBIT A" - Priority: R ROUTINE

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

TEMS Rewire (CY20)

Item No.

Firm Fixed Price Best Estimated

TEMS Rewire (CY20)

1 LO To be Determined Price per Aircraft

K015 Modification of Equipment/Aircraft Structural Components TEMS Rewire (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Scheduled Structural Inspection (SSI) Legacy Wing (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO To be Negotiated Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Scheduled Structural Inspection (SSI) Legacy Wing (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Priority: R ROUTINE

Inspection: Origin

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Scheduled Structural Inspection (SSI) Fuselage (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO To be Negotiated Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Scheduled Structural Inspection (SSI) Fuselage (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed

1 LO

Scheduled Structural Inspection (SSI) EWA (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO Price per Aircraft

J015 Modification of Equipment/Aircraft Structural Components Scheduled Structural Inspection (SSI) EWA (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 & 6 - A-10C Scheduled Structural Inspection (SSI) & Enhanced Wing Assembly (EWA)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

TCTO 1A-10C-544 - Replacement of Upper Longeron Plates, Crown Skin, (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components TCTO 1A-10C-544 - Replacement of Upper Longeron Plates, Crown Skin, and Fuselage Repairs (CY20)

TCTO 1A-10C-544 - Replacement of Upper Longeron Plates, Crown Skin, (CY20)

In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

TCTO 1A-10C-553 - Installation of Repair Straps at FS 405 (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components TCTO 1A-10C-553 - Installation of Repair Straps at FS 405 (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

TCTO 1A-10C-554 - Installation of Fuselage Fuel Cavity Drain Tube (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Equipment/Aircraft Structural Components TCTO 1A-10C-554 - Installation of Fuselage Fuel Cavity Drain Tube Assemblies (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of

TCTO 1A-10C-555 - Installation of Upper Longeron Repair Straps at FS 268 (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components TCTO 1A-10C-555 - Installation of Upper Longeron Repair Straps at FS 268 (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

TCTO 1A-10C-604 - Replacement of Left Hand Lower Longeron, Hydraulic (CY20)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components TCTO 1A-10C-604 - Replacement of Left Hand Lower Longeron, Hydraulic Drive Fittings, and Associated Brackets (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appendix 5 - A-10C Scheduled Structural Inspection (SSI)

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

Plyon Rewire Stand Alone (Drop Off) (CY20)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 5 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Pylon Rewire Stand Alone (Drop Off) (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appentix 9 - Pylon Rewire

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required

5 EA TBC

Proposed Period of Performance

5 EA

Pylon Rewire in conjunction with SSI (CY20)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 EA Price per Aircraft

J015 Maint & Repair of Equipment/Aircraft Structural Components Pylon Rewire in conjunction with SSI (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Appentix 9 - Pylon Rewire

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Contractor Travel for USG Directed Training (CY20)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA To be Determined

J015 Maint & Repair of Equipment/Aircraft Structural Components Contractor Travel for USG Directed Training (CY20) In Accordance With (IAW) the Performance Work Statement (PWS): Section 7.8.4 - Employee Training

Contractor Travel for USG Directed Training (CY20)

Required Period of Performance

EA TBD

Proposed Period of Performance

EA

Note that delivery schedule descriptions provided hereunder are dependent on orders placed against the Basic contract.

All places of performance are plant unless otherwise noted in the individual order.

The DODAAC and RIC codes for this contract are as follows:

DODAAC:

RIC:

Induction of Aircraft (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps Induction of Aircraft (CY21)

IAW PWS 2.8

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

5 EA TBC

Proposed

Final Processing of Aircraft (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps Final Processing of Aircraft (CY21)

IAW PWS 2.11

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

5 EA TBC

Proposed

Scuff Sand Paint Stand Alone (CY21)

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Modification of Eq/Aircraft Structural Comps Scuff Sand Paint Stand Alone (CY21) IAW Appendix 4 PWS

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of

Paint and Plastic Media Blast (PMB) Stand Alone (CY21)

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Paint and Plastic Media Blast (PMB) Stand Alone (CY21) IAW Appendix 4 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Paint and Plastic Media Blast (PMB) with SSI/8YC (CY21)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 4 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Paint and Plastic Media Blast (PMB) with SSI/8YC (CY21)(CLIN pricing will not include SSI/8YC work) IAW Appendix 4 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

4 EA TBC

Proposed Period of Performance

4 EA

Phase 1 Inspection Stand Alone (CY21)

Item No.

Firm Fixed Price

Phase 1 Inspection Stand Alone (CY21)

Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Phase 1 Inspection Stand Alone (CY21)

IAW PWS 2.10.4.4. TO 1A-10C-6

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Phase 2 Inspection Stand Alone (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Phase 2 Inspection Stand Alone (CY21)

IAW PWS 2.10.4.4, TO 1A-10C-6

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

8YC Stand Alone (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps 8YC Stand Alone (CY21) IAW Appendix 7 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required

1 EA TBC

Proposed Period of Performance

1 EA

EWA Install Stand Alone (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

4 EA Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps EWA Install Stand Alone (CY21) IAW Appendix 6 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

4 EA TBC

Proposed Period of Performance

4 EA

8YC/EWA (CY21)

Item No.

Firm Fixed Price Best Estimated

8YC/EWA (CY21)

1 EA Price per Aircraft

K015 Maint & Repair of Eq/Aircraft Structural Comps

8YC/EWA (CY21)

IAW Appendix 6 & 7 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Drop in Maintenance (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Hourly Rate

J015 Modification of Eq/Aircraft Structural Comps Drop in Maintenance (CY21) IAW Appendix 5 & 6 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Over and Above Labor (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Hourly Rate

K015 Modification of Eq/Aircraft Structural Comps Over and Above Labor (CY21) IAW 252.217-7028 and PWS 2.12

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of

EWA Stand Alone (CY21)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Amount 1 EA Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps Over and Above Materials (CY21)

IAW PWS 2.12

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Period of Performance

1 EA TBD

Proposed Period of Performance

1 EA

8YC/EWA (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA LO

J015 Modification of Eq/Aircraft Structural Comps Contract Field Team Work (CFT) (CY21)

IAW PWS 2.10.5.3

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Contract Field Team (CFT) Travel (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

100 LO To be Determined

K015 Modification of Eq/Aircraft Structural Comps Contract Field Team (CFT) Travel (CY21)

IAW PWS 2.10.5.3.3

Priority: R ROUTINE

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Period of Performance

100 LO TBD

Proposed

Contract Field Team (CFT) Travel (CY21)

100 LO

Over and Above Labor (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA To be Determined

K015 Modification of Eq/Aircraft Structural Comps Manufacture/Purchase of GFE/STE/ST (CY21) As authorized by ACO Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Period of Performance

1 EA TBD

Proposed Period of Performance

1 EA

SURGE Requirement (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO To be Determined To be Determined

K015 Maint & Repair of Eq/Aircraft Structural Comps SURGE Requirement (CY21)

IAW PWS 2.10.5.2

SURGE Requirement (CY21)

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Additional TCTO FFP (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA To be Determined

K015 Maint & Repair of Eq/Aircraft Structural Comps Additional TCTO FFP (CY21)

IAW PWS 2.10.3.1

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required

Additional TCTO FFP (CY21)

1 EA TBC

Proposed Period of Performance

1 EA

Data (CY21)

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

K015 Maint & Repair of Eq/Aircraft Structural Comps Data (CY21) IAW Attached DD form 1423 "EXHIBIT B"

Priority: R ROUTINE

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

TEMS Rewire (CY21)

Item No.

TEMS Rewire (CY21)

Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO To be Determined Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps TEMS Rewire (CY21) IAW Appendix 5 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Scheduled Structural Inspection (SSI) Thick Wing (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO To be Negotiated Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Scheduled Structural Inspection (SSI) Legacy Wing (CY21) IAW Appendix 5 PWS

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Scheduled Structural Inspection (SSI) Fusalage (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO To be Negotiated Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Scheduled Structural Inspection (SSI) Fusalage (CY21) IAW Appendix 5 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required

1 LO TBC

Proposed Period of Performance

1 LO

Scheduled Structural Inspection (SSI) EWA (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 LO Price per Aircraft

J015 Modification of Eq/Aircraft Structural Comps Scheduled Structural Inspection (SSI) EWA (CY21) IAW Appendix 5 & 6 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

TCTO 1A-10C-544 - Replacement of Upper Longeron Plates, Crown Skin, (CY21)

Item No.

Firm Fixed Price Best Estimated

TCTO 1A-10C-544 - Replacement of Upper Longeron Plates, Crown Skin, (CY21)

5 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps TCTO 1A-10C-544 - Replacement of Upper Longeron Plates, Crown Skin, and Fuselage Repairs (CY21) IAW Appendix 5 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

TCTO 1A-10C-553 - Installation of Repair Straps at FS 405 (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps TCTO 1A-10C-553 - Installation of Repair Straps at FS 405 (CY21) IAW Appendix 5 PWS

Priority: R ROUTINE

Inspection: Origin

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

TCTO 1A-10C-554 - Installation of Fuselage Fuel Cavity Drain Tube (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps TCTO 1A-10C-554 - Installation of Fuselage Fuel Cavity Drain Tube Assemblies (CY21) IAW Appendix 5 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed

5 EA

TCTO 1A-10C-555 - Installation of Upper Longeron Repair Straps at FS 268 (CY21)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps TCTO 1A-10C-555 - Installation of Upper Longeron Repair Straps at FS 268 (CY21) IAW Appendix 5 PWS

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

TCTO 1A-10C-604 - Replacement of Left Hand Lower Longeron, Hydraulic Drive(CY21)

YEAR 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps TCTO 1A-10C-604 - Replacement of Left Hand Lower Longeron, Hydraulic Drive Fittings, and Associated Brackets (CY21)

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

Plyon Rewire Stand Alone (Drop Off) (CY21)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 5 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Pylon Rewire Stand Alone (Drop Off) (CY21) IAW Appentix 9 PWS

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued

Required Period of Performance

5 EA TBC

Proposed Period of Performance

5 EA

Pylon Rewire in conjunction with SSI (CY21)

Item No.

Firm Fixed Price Quantity U/I Estimated Unit Price Estimated Total Price 1 EA Price per Aircraft

J015 Maint & Repair of Eq/Aircraft Structural Comps Pylon Rewire in conjunction with SSI (CY21) IAW Appentix 9 PWS

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 EA TBC

Proposed Period of Performance

1 EA

Contractor Travel for USG Directed Training (CY21)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA To be Determined

J015 Maint & Repair of Eq/Aircraft Structural Comps Contractor Travel for USG Directed Training (CY21)

IAW PWS 7.8.4

Contractor Travel for USG Directed Training (CY21)

Place of Perf Quantity (U/I) To be determined _ Req No / Pri Required Period of Performance

EA TBD

Proposed Period of Performance

EA

Note that delivery schedule descriptions provided hereunder are dependent on orders placed against the Basic contract.

All places of performance are plant unless otherwise noted in the individual order.

The DODAAC and RIC codes for this contract are as follows:

DODAAC:

RIC:

Induction of Aircraft (CY22)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps Induction of Aircraft (CY22)

IAW PWS 2.8

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

5 EA TBC

Proposed

Final Processing of Aircraft (CY22)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

5 EA Price per Aircraft

K015 Modification of Eq/Aircraft Structural Comps Final Processing of Aircraft (CY22)

IAW PWS 2.11

Priority: R ROUTINE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

5 EA TBC

Proposed

Scuff Sand Paint Stand Alone (CY22)

Firm Fixed Price Best Estimated Qty

U/I Estimated Unit Price Estimated Total Price

1 EA Price per Aircraft

J015 Modification of Eq/Aircraft Structural Comps Scuff Sand Paint Stand Alone (CY22) IAW Appendix 4 PWS

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below.