TECHNICAL_NOTESa.docx

DOCX document 13 KB Posted

Attached to
Bldg. 503 Repair/Minor Const/Equipment Federal contract opportunity
Solicitation number
FA8201-16-B-0009
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Bldg. 503. TECHNICAL NOTES

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 503 Repair/Minor Const/Equipment, newest first.
File Type Posted
IFB_B503_Amend_04.docx DOCX document
2ndSiteVistSigninSheets.pdf PDF
Bldg503_asbestos_WO53153_Repair_Exterior.xlsx XLSX spreadsheet
QA_15_NOV_16_2ND_SITE_VISITcsr1_(002).docx DOCX document
5600_System_CS23_GHD582_0516 —
503 Individual Pictures 98.pdf PDF
503 Individual Pictures 68.pdf PDF
503 Individual Pictures 95.pdf PDF
503 Individual Pictures 58.pdf PDF
503 Individual Pictures 82.pdf PDF
503 Individual Pictures 94.pdf PDF
200_Anti_Skid_Additive_CS37_GDH82_715.pdf PDF
503 Individual Pictures 96.pdf PDF
LS-102.pdf PDF
503 Individual Pictures 92.pdf PDF
A_INTRODUCTION.docx DOCX document
MaterialsEstimate.docx DOCX document
Manufdata1s.pdf PDF
503 Individual Pictures 106.pdf PDF
503 Individual Pictures 64.pdf PDF
503 Individual Pictures 102.pdf PDF
503 Individual Pictures 73.pdf PDF
503 Individual Pictures 87.pdf PDF
503 Individual Pictures 65.pdf PDF
503 Individual Pictures 55.pdf PDF
Seed_Mix.pdf PDF
503 Individual Pictures 72.pdf PDF
503 Individual Pictures 57.pdf PDF
503 Individual Pictures 109.pdf PDF
RAMP_DETAIL.pdf PDF
Photo_Notes1.docx DOCX document
503 Individual Pictures 83.pdf PDF
503 Individual Pictures 69.pdf PDF
INDsupplyQuote.pdf PDF
503 Individual Pictures 66.pdf PDF
Contractor_Questions_ _Answers_-_26_Oct_2016.pdf PDF
AS5400_System_CS12_GDH1140 —
503 Individual Pictures 89.pdf PDF
503 Individual Pictures 91.pdf PDF
503 Individual Pictures 99.pdf PDF
503 Individual Pictures 100.pdf PDF
503 Individual Pictures 101.pdf PDF
B503_Amend_02.docx DOCX document
BLDG._503_EXTERIOR_UPGRADE_SET_sow.pdf PDF
K092001-B503_Specifications_Rev_7.25.16.docx DOCX document
Storm_Water_Pollution_Prevention_Plan_Building_680_KRSM_152043.pdf PDF
CEN-CEIE_PLAN_REVIEW_CHECKLIST.docx DOCX document
BASE_FACILITY_DESIGN_STANDARD.docx DOCX document
APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_March_2015.docx DOCX document
Bldg._503_Solicitation.docx DOCX document
Show all 50

Bldg. 503 Repair/Minor Const/Equipment has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL NOTES “A”

(subsequent revisions will have a higher order alpha character)

Steel bollards and columns shall use Loctite Extend as a rust neutralizer. This may be applied via brush or spray and may act as a primer.

Steel bollards on the north loading dock shall be painted safety yellow.

When painting stairs the front 4 inches of the tread or subsequent width of nose tread shall be painted safety yellow.

Apply Loctite Bigfoot with ¼ inch nap roller to create higher profiling.

Edges of concrete that are vertically misaligned greater than 3/8 of an inch that present a trip hazard shall be ground down to alignment. An example of this is at the top of the 503 west side handicap ramp.

Exterior concrete stairs: remove nose tread, remove degraded substrate down to solid material, prep surface per technical datasheet, form and repair with Loctite Magna-Crete, and install new nose tread utilizing Loctite Crack Filler SL as a sealant underneath it and its fasteners.

Caulking application technique shall ensure proper preparation, utilization of backer rod and utilization of interior diameter raised edges to target water away from embeds, columns etc.

Drawing C101A will be updated to reflect motorcycle parking moved to the southwest corner of the lot as compared to the southeast corner. Five new parking curbs will be added to the northeast corner to protect the fence that is being repaired as part of this project.

Per C103 note 25 the project requires leak repair on the entryway awning on the west side of 503A. A known leak is present at the gutter/drainpipe junction at EFIS interface. Contractor will have to find other leak sources and repair.

File details come from the government source that posted it. Updated .