QA_15_NOV_16_2ND_SITE_VISITcsr1_(002).docx

DOCX document 13 KB Posted

Attached to
Bldg. 503 Repair/Minor Const/Equipment
Solicitation number
FA8201-16-B-0009
Issued by

About this file

Bldg. 503 Q A from second site visit.

View the file

Other files

File Type Posted
TECHNICAL_NOTESa.docx DOCX document
B503KRSM092001-E4.0BLD_503_REPAIRS-E4.0.pdf PDF
2ndSiteVistSigninSheets.pdf PDF
Bldg-503PB_WO53153.xlsx XLSX spreadsheet
IFB_B503_Amend_04.docx DOCX document
Bldg503_asbestos_WO53153_Repair_Exterior.xlsx XLSX spreadsheet
503 Individual Pictures 54.pdf PDF
Manufdata1s.pdf PDF
503 Individual Pictures 84.pdf PDF
ICS_Quote_1609-160836.pdf PDF
503 Individual Pictures 93.pdf PDF
503 Individual Pictures 62.pdf PDF
503 Individual Pictures 83.pdf PDF
503 Individual Pictures 64.pdf PDF
503 Individual Pictures 102.pdf PDF
INDsupplyQuote.pdf PDF
503 Individual Pictures 69.pdf PDF
Contractor_Questions_ _Answers_-_26_Oct_2016.pdf PDF
503 Individual Pictures 66.pdf PDF
503 Individual Pictures 70.pdf PDF
503 Individual Pictures 76.pdf PDF
503 Individual Pictures 106.pdf PDF
5600_System_CS23_GHD582_0516 —
503 Individual Pictures 98.pdf PDF
503 Individual Pictures 51.pdf PDF
503 Individual Pictures 79.pdf PDF
503 Individual Pictures 53.pdf PDF
Manufdata1.pdf PDF
503 Individual Pictures 104.pdf PDF
503 Individual Pictures 73.pdf PDF
7400_System_450_VOC_Primers_RO11_GDH1090.pdf PDF
503 Individual Pictures 107.pdf PDF
503 Individual Pictures 103.pdf PDF
503 Individual Pictures 78.pdf PDF
Manufdata2.pdf PDF
503 Individual Pictures 85.pdf PDF
503 Individual Pictures 95.pdf PDF
503 Individual Pictures 68.pdf PDF
503 Individual Pictures 87.pdf PDF
503 Individual Pictures 58.pdf PDF
503 Individual Pictures 82.pdf PDF
503 Individual Pictures 94.pdf PDF
503 Individual Pictures 105.pdf PDF
503 Individual Pictures 88.pdf PDF
503 Individual Pictures 75.pdf PDF
ASPHALT_DETAIL.pdf PDF
503_Quantities.docx DOCX document
UT104.txt TXT text file
503 Individual Pictures 74.pdf PDF
503 Individual Pictures 65.pdf PDF
Show 40 more

Latest 50 of 107 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8201-16-B-0009

BLDG. 503 UPGRADES

KRSM 092001A, B, C

SECOND SITE VISIT 15 Nov 2016 Contractor Questions and Answers

1. This job appears to be fully engineered and so we have some questions that we believe should be answered by the engineer of record:

A. Where do we get power for the new roll up door for 503 H? There is a 120 volt/208 volt panel in the building but it is completely full. There also is a 277/480 volt panel but the door was locked to be able to see if any space is available.

RESPONSE: Please utilize spare circuit number 2 in the 277/480 V panel.

B. Where do we get power for the ultrasonic bird repeller?

RESPONSE: 503 north wall, panel 4, circuit 26.

C. Where do we get power for the light in the new booth at gate 36?

RESPONSE: From panel P5 within the guard shack. Utilize available space and provide breaker. Cover unused openings.

D. Where is the 277 /480 volt panel located for power to the heat tape?

RESPONSE: 503A room 129 (northeast corner of facility on main level), panel LM circuit 9. Provide breaker. Observe that drawing shows trace in valley and entire gutter area.

2. The fixture schedule on page EO-1 [22 of 26] it shows a fixture type PK-4, ceiling mount, where does this install?

RESPONSE: See sheet 24, upper left of the drawing. (Per note 4)

3. On page EO-4 [24 of 26] Some important information on the vindicator system on the gates is blacked out. Can you please provide these details without blackout?

RESPONSE: See revison

File details come from the government source that posted it. Updated .