This document is a Technical Specification for crack sealing work in asphalt concrete pavements at Tinker Air Force Base, Oklahoma, dated April 2019.
The specification covers furnishing and installation of materials for crack sealing of asphalt concrete pavements, with products required to match existing materials or be directed by the Contracting Officer. Installation procedures must follow product manufacturer recommendations, and demolition and removal of materials shall be performed as necessary to support the work. Required products include Liquid Asphalt complying with ASTM D 2027, Grade MC-250; Emulsified Asphalt complying with ASTM D 977, Grade MS-2; Sealing Compound complying with Federal Specification SS-S-1401; and Fine Aggregate consisting of natural sand or crusher dust with a maximum size of 1/8 inch, free of clay and organic matter.
Execution requirements specify that all cracks must be cleaned of dirt and debris using portable air compressor equipment with hose and nozzles, followed by stiff bristle brooms. Heating equipment for liquid asphalt must be mobile with agitating devices, thermometers, regulating equipment for heat control, and gravity-type draw-off valves. Heating equipment for sealing compound shall consist of mobile, double boiler agitator-type kettles with oil medium for heat transfer and circulation capability. Installation procedures require sealing all cracks 1/8 inch wide and wider, with cracks 1/2 inch wide and wider first filled with a fine sand slurry and emulsified or liquid asphalt before final sealing. Temperature control is critical to ensure proper flow and complete crack filling without air entrapment. The contractor is responsible for all traffic control barricades and flagmen to prevent vehicle access to sealed cracks until sealer has cooled sufficiently.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 07 42 13.pdf | ||
| 32 01 16.pdf | ||
| 10 44 16.pdf | ||
| 10 14 00.10.pdf | ||
| 07 41 13.pdf | ||
| 31 23 15.pdf | ||
| 31 00 00.pdf | ||
| 03 30 00.pdf | ||
| 06 10 00.pdf | ||
| 09 90 00.pdf | ||
| 02 41 00.pdf | ||
| 32 13 14.pdf | ||
| 32 01 14.pdf | ||
| COPY of Site Visit Sign-in Sheet_10.22.2026.pdf | ||
| 00 70 00.pdf | ||
| 00 80 05.pdf | ||
| 00 80 00.pdf | ||
| 01 42 00.pdf | ||
| 00 72 00.pdf | ||
| 01 33 16.00 10.pdf | ||
| 00 71 00.pdf | ||
| 01 78 23.pdf | ||
| 01 45 00.00 10.pdf | ||
| 000_TABLE OF CONTENTS.pdf | ||
| 01 32 16.00 20.pdf | ||
| 01 78 00.pdf | ||
| 01 33 00.pdf | ||
| 01 50 00.pdf | ||
| RFI QA RESPONSES - WWYK260004 - REPAIR STRUCTURAL INTEGRITY B1134 POST 34 NORTH WALL_COR.pdf | ||
| Solicitation - FA813727R0001.pdf | ||
| Wage Determinations.pdf | ||
| Att.10_260004_Drawings.pdf | ||
| Att.9_260004_Submittal Register.pdf | ||
| Att.8_260004_MACB_SOW.pdf |
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB, OK TAFB Technical Specifications 2019
April 2019 Page 1 Section 32 01 17
SECTION 32 01 17
CRACK SEALING IN ASPHALT CONCRETE PAVEMENTS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
This specification covers the furnishing and installation of materials for crack sealing of asphalt concrete pavements. Products shall match existing materials and/or shall be as directed by the Contracting Officer. Installation procedures shall be in accordance with the product manufacturer's recommendations. Demolition and removal of materials shall be as required to support the work.
PART 2 PRODUCTS
2.1 LIQUID ASPHALT
Liquid Asphalt shall comply with ASTM D 2027, Grade MC-250.
2.2 EMULSIFIED ASPHALT
Emulsified Asphalt shall comply with ASTM D 977, Grade MS-2.
2.3 SEALING COMPOUND
Sealing Compound shall comply with Fed. Spec. SS-S-1401.
2.4 FINE AGGREGATE
Fine Aggregate shall be natural sand or crusher dust and have a maximum size of not more than 1/8 inch and be free of clay and organic matter.
PART 3 EXECUTION
3.1 PREPARATION:
3.1.1 All Cracks to be sealed shall be cleaned of dirt and
debris.
3.1.2 Crack Cleaning Equipment shall consist of a portable air compressor with hose and nozzles for directing air directly into cracks and stiff bristle brooms.
3.1.3 Heating Equipment for Liquid Asphalt shall be mobile and shall be equipped with an agitating device for stirring material during heating, a thermometer, regulating
Tinker AFB, OK TAFB Technical Specifications 2019
April 2019 Page 2 Section 32 01 17 equipment for heat control, and a gravity type, draw off valve.
3.1.4 Heating Equipment for Sealing Compound: Unless otherwise required by the manufacturer's recommendations, the equipment shall be mobile and shall consist of double boiler, agitator type kettles with oil medium in the outer space for heat transfer. The applicator unit shall be so designed that the sealant will circulate through the delivery hose and return to the inner kettle when not sealing cracks.
3.1.5 Application Equipment shall have a spout or nozzle of such size that the sealing material will be placed in the cracks without entrapping air in cracks or spreading material on adjacent pavement surface.
3.2 INSTALLATION
3.2.1 Sealing Compound
All cracks one eighth of an inch wide and wider shall be sealed.
The application temperature for sealing compound shall comply with Fed. Spec. SS-S-1401. Cracks one half of an inch wide and wider shall be filled with a slurry of fine sand and an emulsified asphalt or liquid asphalt. After the slurry has cured, cracks shall be sealed with liquid asphalt or emulsified asphalt and lightly sanded.
3.2.2 Liquid and Emulsified Asphalt Sealer
The temperature shall be varied so that it flows freely into cracks and completely fills cracks without entrapping air. Cracks shall be free of moisture before filling and shall be filled slightly above the pavement surface. When excess sealer has been removed, the sealer shall be covered with fine sand.
3.2.3 Traffic Control
Traffic will not be permitted over sealed cracks until the sealer has cooled so that vehicle tires do not pick it up. The Contractor will be responsible for all barricades and flagmen necessary to control traffic.
- End of Section -
| PART 1 GENERAL |
| PART 2 PRODUCTS |
| 2.1 Liquid Asphalt |
| 2.2 Emulsified Asphalt |
| 2.3 Sealing Compound |
| 2.4 Fine Aggregate |
| part 3 EXECUTION |
| 3.1 Preparation: |
| 3.1.1 All Cracks to be sealed shall be cleaned of dirt and debris. |
| 3.1.2 Crack Cleaning Equipment shall consist of a portable air compressor with hose and nozzles for directing air directly into cracks and stiff bristle brooms. |
| 3.1.3 Heating Equipment for Liquid Asphalt shall be mobile and shall be equipped with an agitating device for stirring material during heating, a thermometer, regulating equipment for heat control, and a gravity type, draw off valve. |
| 3.1.4 Heating Equipment for Sealing Compound: Unless otherwise required by the manufacturer's recommendations, the equipment shall be mobile and shall consist of double boiler, agitator type kettles with oil medium in the outer space for heat transfer... |
| 3.1.5 Application Equipment shall have a spout or nozzle of such size that the sealing material will be placed in the cracks without entrapping air in cracks or spreading material on adjacent pavement surface. |
| 3.2 Installation |
| 3.2.1 Sealing Compound |
| 3.2.2 Liquid and Emulsified Asphalt Sealer |
| 3.2.3 Traffic Control |