32 01 14.pdf

PDF 15 KB Posted

Attached to
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation number
FA813727R0001
Issued by

About this file

This is a Technical Specification document from Tinker Air Force Base for asphalt pavement sealer application work, issued in April 2019. The specification covers the application of seal coat to repair and protect new and existing bituminous airfield pavements, roads, streets, parking areas, and general applications at the facility.

The required seal coat products are ProtecTar Coal Tar Sealer, Star Seal Supreme, or an approved equal. Products must meet ASTM D 490, ASTM D 2939, and ASTM D 3320 standards and be composed of a coal tar base product designed to protect underlying asphalt pavement from water, chemicals, de-icing, and petroleum products. The specification requires a two-coat application system with a minimum application rate of 0.1 gallons per square yard, finished in dark charcoal color. Application is restricted to ambient air and surface temperatures of at least 50°F and rising, and cannot occur on rainy or extremely humid days or when rain is forecasted within 24 hours. The first coat must dry to the touch before the second coat is applied. Sealed areas must cure a minimum of 12 hours before striping or opening for use. The contractor must submit equipment lists, inspection reports, bituminous material data, MSDS sheets, test reports, and application rates for government approval prior to work commencement. If the actual application rate is determined to be more than 20 percent below the approved rate, the contractor must apply additional material at no additional cost to the government within 24 hours.

View the file

Other files

File Type Posted
07 42 13.pdf PDF
32 01 16.pdf PDF
10 44 16.pdf PDF
32 01 17.pdf PDF
10 14 00.10.pdf PDF
07 41 13.pdf PDF
31 23 15.pdf PDF
31 00 00.pdf PDF
03 30 00.pdf PDF
06 10 00.pdf PDF
09 90 00.pdf PDF
02 41 00.pdf PDF
32 13 14.pdf PDF
COPY of Site Visit Sign-in Sheet_10.22.2026.pdf PDF
00 70 00.pdf PDF
00 80 05.pdf PDF
00 80 00.pdf PDF
01 42 00.pdf PDF
00 72 00.pdf PDF
01 33 16.00 10.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
01 45 00.00 10.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
RFI QA RESPONSES - WWYK260004 - REPAIR STRUCTURAL INTEGRITY B1134 POST 34 NORTH WALL_COR.pdf PDF
Solicitation - FA813727R0001.pdf PDF
Wage Determinations.pdf PDF
Att.10_260004_Drawings.pdf PDF
Att.9_260004_Submittal Register.pdf PDF
Att.8_260004_MACB_SOW.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB, OK TAFB Technical Specifications 2019

April 2019 Page 1 Section 32 01 14

SECTION 32 01 14

ASPHALT PAVEMENT SEALER

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

This specification covers the application of asphalt pavement sealer (seal coat) for the repair/protection of new and existing bituminous airfield pavements, roads, streets, parking areas and other general applications by the application of a chemical seal coat.

1.2 REFERENCES

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM D 490 Standard Specification for Road Tar

ASTM D 2939 Standard Tests Methods for Emulsified Bitumens Used as Protective Coatings

ASTM D 3320 Standard Specification for Emulsified Coal-Tar Pitch (Mineral Colloid Type)

1.3 SUBMITTALS

Government approval is required of all materials, designs, and procedures prior to use. The following are to be submitted in accordance with Section 01 33 00; SUBMITTAL PROCEDURES.

1.3.1 SD-03 Product Data

Equipment List Inspection Reports Bituminous Materials MSDS Sheets

1.3.2 SD-06 Test Reports

Bituminous Materials Field Test

April 2019 Page 2 Section 32 01 14

1.4 QUALITY ASSURANCE

1.4.1 Contractor quality control shall meet the requirements of Section 01 45 10; CONTRACTOR QUALITY CONTROL.

PART 2 PRODUCTS

2.1 SEAL COAT

2.1.1 Seal coat products shall be ProtecTar Coal Tar Sealer, Star Seal Supreme, or an approved equal.

2.2 PRODUCT COMPOSITION

2.2.1 The asphalt seal coat agent shall be composed of a coal tar base product designed and manufactured to protect underlying asphalt pavement from water, chemicals, de-icing and petroleum products.

2.2.2 Products shall, at a minimum, meet the requirements set forth in ASTM D 490, ASTM D 2939, and ASTM D 3320.

PART 3 EXECUTION

3.1 MANUFACTURER’S RECOMMENDATIONS

3.1.1 The Seal Coat shall be applied in accordance with the

manufacturer’s written recommendations and instructions.

3.2 PREPARATION OF THE SURFACE

3.2.1 The pavement shall be free of dirt, dust, clay, sand, vegetation and all other loose materials prior to the application of the seal coat.

April 2019 Page 3 Section 32 01 14

3.3 APPLICATION OF THE SEAL COAT

3.3.1 Weather Conditions

3.3.1.1 The seal coat shall be applied only when the ambient air and surface temperatures are at least 50o F. and rising.

3.3.1.2 The seal coat shall not be applied on rainy and extremely humid days, or when rain is forecasted within the next 24 hours.

3.3.2 Number of Applications

3.3.2.1 The seal coat shall be applied as a two (2) coat system.

3.3.2.2 Allow the first coat to dry to the touch before applying the second coat.

3.3.3 Application Rate

3.3.3.1 The application rate shall be included in the submittal and shall be consistent with the manufacturer’s instructions.

3.3.3.2 The minimum application rate shall be 0.1 gallons per square yard.

3.3.4 Color

3.3.4.1 The finished color shall be a dark charcoal.

3.4 PLACING SEAL COAT AREAS INTO SERVICE

3.4.1 Areas which are seal coated shall be allowed to cure a

minimum of 12 hours before applying striping and/or opening the area for use.

3.5 INSUFFICIENT SEAL COAT MATERIAL

3.5.1 When it is determined by the Contracting Officer that the actual application rate of the seal coat is more than twenty percent (20%) below the approved application rate, additional material shall be applied, at no additional cost

April 2019 Page 4 Section 32 01 14 to the government, within 24 hours to insure adequate sealing of the pavement.

- End of Section -