000_TABLE OF CONTENTS.pdf

PDF 70 KB Posted

Attached to
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation number
FA813727R0001
Issued by

About this file

This document is a Table of Contents for Tinker Air Force Base General Requirements, effective January 2022, which establishes construction and contracting standards for projects at Tinker AFB.

The document outlines general requirements organized into two primary divisions. Division 00 covers procurement and contracting requirements, including general construction requirements (00 70 00), general safety requirements (00 71 00), general environmental requirements (00 72 00), and special provisions for working on Tinker AFB (00 80 00 and 00 80 05), with the latter specifically addressing work on or near the airfield. Division 01 addresses general requirements including small project construction progress schedules (01 32 16.00 20), submittal procedures (01 33 00), design data for design-after-award projects (01 33 16.00 10), sources for reference publications (01 42 00), quality control (01 45 00.00 10), contractor facilities (01 50 00), closeout submittals (01 78 00), and operation and maintenance data (01 78 23). This table of contents serves as a navigational guide to the complete set of requirements that contractors must follow when performing construction work at Tinker Air Force Base.

View the file

Other files

File Type Posted
07 42 13.pdf PDF
32 01 16.pdf PDF
10 44 16.pdf PDF
32 01 17.pdf PDF
10 14 00.10.pdf PDF
07 41 13.pdf PDF
31 23 15.pdf PDF
31 00 00.pdf PDF
03 30 00.pdf PDF
06 10 00.pdf PDF
09 90 00.pdf PDF
02 41 00.pdf PDF
32 13 14.pdf PDF
32 01 14.pdf PDF
COPY of Site Visit Sign-in Sheet_10.22.2026.pdf PDF
00 70 00.pdf PDF
00 80 05.pdf PDF
00 80 00.pdf PDF
01 42 00.pdf PDF
00 72 00.pdf PDF
01 33 16.00 10.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
01 45 00.00 10.pdf PDF
01 32 16.00 20.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
RFI QA RESPONSES - WWYK260004 - REPAIR STRUCTURAL INTEGRITY B1134 POST 34 NORTH WALL_COR.pdf PDF
Solicitation - FA813727R0001.pdf PDF
Wage Determinations.pdf PDF
Att.10_260004_Drawings.pdf PDF
Att.9_260004_Submittal Register.pdf PDF
Att.8_260004_MACB_SOW.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

January 2022 Page 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 70 00

00 71 00

00 72 00

00 80 00 00 80 05

GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE

BASE

GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR

FORCE BASE

GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON

TINKER AIR FORCE BASE

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON

TINKER AFB

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 50 00 CONTRACTOR FACILITIES

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

-- End of Table of Contents –-

File details come from the government source that posted it. Updated .