About this file

This document consists of construction drawings for a federal repair project at Tinker Air Force Base, Oklahoma, specifically addressing roadway and parking area repairs at the munitions area. The project, designated WWYK150185, is a 35% design prepared by the Air Force Materiel Command's 72nd Air Base Wing Civil Engineer Directorate, with a design date of 07 April 2026.

The project encompasses three distinct work areas involving demolition and reconstruction of driveways and parking lots. Area #1 (Building B41808, 26,458 square feet) and Area #2 (Building B34804, 27,426 square feet) require new 6-inch asphalt pavement profiles with 2-inch wearing course overlays following demolition and surface milling. Area #3 (Building B41508, 11,934 square feet for the POV lot and related driveway) requires removal of loose aggregate, cleaning of existing asphalt surfaces, and installation of eight new parking spaces with painted markings and parking stop bars. All work includes application of seal coats over areas not receiving new asphalt. Construction materials and methods must conform to Oklahoma Department of Transportation standard specifications for highway construction, including lime-modified subgrade compacted to 98% Modified Proctor density with minimum CBR values greater than 8. The specifications also detail temporary silt fence installation per ODOT standards and 6-inch perforated underdrain placement with geotextile membrane in Area #1 to address documented water drainage issues. Construction fencing, barricade installation, and site protection from unauthorized personnel access are contractor responsibilities, as is repair of any damage to existing grounds or facilities resulting from construction operations.

View the file

Other files

File Type Posted
Solicitation Amendment - FA813726R00270002.pdf PDF
Solicitation Amendment FA813726R00270002 SF 30.pdf PDF
RFI_s_Gov Response Updated Drawings_WWYK190230_21JULY2026_REV1.pdf PDF
Att10_190230_SOW (REVISED).pdf PDF
WWYK109230 Repair Arnold Ave Between H Ave and M Ave RFI_s_Gov Response.pdf PDF
Solicitation Amendment - FA813726R00270001.pdf PDF
RFI Gov Response Updated Drawings_WWYK150185.pdf PDF
Solicitation Amendment FA813726R00270001 SF 30.pdf PDF
WWYK150185 Repair Roadways Parking at Munitions Area_RFI_s_Gov Response.pdf PDF
WWYK150185 - 190230 Site Visit Sign in Sheet.pdf PDF
Tinker AFB Visitor Map_.pdf PDF
LightingFixtureSchedule.xlsx XLSX spreadsheet
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2 EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att11_190230_Submittal Register_v4.pdf PDF
Att10_150185_SOW.pdf PDF
Att10_190230_SOW.pdf PDF
Solicitation - FA813726R0027.pdf PDF
Wage Determination OK200260049.pdf PDF
WOSB Sec LM 22May26 Update (v3)_.pdf PDF
WWYK190230_Drawings.pdf PDF
Att11_150185_Submittal Register.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

WWYK150185

REPAIR ROADWAYS,

PARKING AT MUNITIONS AREA

KEY PLAN:

GENERAL NOTES:

DISCIPLINE

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

NK

ER

A

IR

F

OR

CE

B

AS

E, O

KL

AH

OM

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, PA

RK

IN

G

AT

M

UN

IT

IO

NS

A

RE

A

7A

PR

T

EP

A-

SR

M

XX

X

G-101

S S

TA

R

R

C E

BE

R

T

En gr

\D es ig n\

\2

5\

\0

_S up po rt\

0_ 3_

D ra w in gs

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 08

B34804

(7451 SQ FT)

B41508, POV LOT

(11934 SQ FT)

LEGEND

NEW GOVERNMENT PARKING AREA

CONTRACTOR HAUL ROUTE

3 CD-102

7 C-103 AREA #1 B41808- DRIVEWAY AND PARKING LAYOUT - NEW

AREA # 2 B34804 - DRIVEWAY AND PARKING LAYOUT - DEMOLITION

B41808

(26458 SQ FT)

AIR FIELD

FENCE

GATE

B3804

(27426 SQ FT)

B3812

(11323 SQ FT)

/06 /24

RE

VI

SE

D

SH

EE

TS

/LE

GE

ND

AP

R2

RE

VI

SE

D

SH

EE

TS

/LE

GE

ND

CD-101 AREA #3 B41508 - DRIVEWAY AND PARKING LAYOUT - DEMOLITION

CD-103

C-101 AREA #3 B41508 - DRIVEWAY AND PARKING LAYOUT - NEW

C-102

AREA #1 B41808- DRIVEWAY AND PARKING LAYOUT - DEMOLITION

AREA #2 B34804 - DRIVEWAY AND PARKING LAYOUT - NEW

AREA #1

AREA #2

AREA #3

8 C-201 DETAILS

Elm C reek

Elm Creek

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

Arnold St.

Ea st

D r.

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St af f D r.

Reserve Rd.

5th Ave

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

7th St.

"H " A ve

M cN ar ne y Av e.

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To w er R d.

Vanaman Rd.

In du st ria l B lv d.

So ut h St

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Mercury Rd.

1st St.

Br ow n Dr

Po nd

R d.

O ld

A ir

De po t

Airey Dr.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Vandenberg Dr.

Hi llt op R d.

Do rm ito ry

R d.

Dormitory Rd.

"M " A ve

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

Co m m od ity D r.

Doolittle Ave

W hi te D r.

3rd Ave.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Ai r D ep ot

B lv d

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falco n Dr.

Blackb ird

Dr.

W ey la nd

L oo p

Pegasus Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Ph an to m

D r.

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

La w re nc e

M un de ll

Nabors Dr.

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ta il

Fe at he r D r.

Holden Dr.

Ai re y C ir.

Smith Ct.

Ra ve n Ct

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

TAXIWAY F

Ra w li ng s A ve

Mitc he ll A ve

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

Pr op ul sio n Dr

Stratofortress Dr.

96021

Arnold St.

TINKER AFB, OK

VICINITY MAP

BASE

OPERATIONS

B240

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

HRUSKOCY

GATE

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT

LOCATION

(FUTURE

HAUL ROUTE)

(F

UT

UR

E

HA

UL

R

OU

TE

FUTURE

TRUCK GATE

FUTURE

HAUL ROUTE

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. COORDINATE WITH USER FOR THIS REPLACEMENT.

CD-101

AREA #3 B41508 - DRIVEWAY AND PARKING - DEMOLITION

SCALE: 1/32" = 1'-0"

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, P

AR

KI

NG

AT

M

UN

IT

IO

NS

A

RE

AS

B3

2, B4

, B

4, B4

7A

PR

TE

PA

-S R

M

M N

AB

YW

AN

IE

C

CD-101

S S

TA

R

R

C E

BE

R

T

En gr

\D es ig n\ s\

\2

5\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

AR

EA

#3 B

8 -

DR

IV

EW

AY

A

ND

P

AR

KI

NG

LA

YO

UT

DE

MO

LIT

IO

N

02 08

/06 /24

UP

DA

TE

D

KE

YE

D

NO

TE

S

AREA #3

AP

R2

RE

VI

SE

D

SH

EE

TS

KEYED NOTES

POV PARKING LOT: REMOVE ALL LOOSE AGGREGATE AND GRAVEL OF THE

BASE MATERIAL THAT ARE EXPOSED AT THE SOUTH END OF THE PARKING

LOT. EXISTING ASPHALT PAVEMENT TO REMAIN IN PLACE AND MUST BE

PROTECTED.

CLEAN EXISTING ASPHALT ROADWAY SURFACE OF LOOSE GRAVEL.

REMOVE ALL (8) PARKING STOP BARS AND REPLACE AFTER PAVING THE

PARKING LOT. STRIP ALL PARKING SPACES.

DEMO AREA FOR NEW 6" PAVEMENT PROFILE, REF. 4/C-201. M

MILL THE SURFACE ONLY ABOUT 30FT OF THE DRIVEWAY PAVEMENT FROM

MUNITIONS ROAD.

2 4

100'

15'

AREA #3

30'

35'-0"±

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CD-102

AREA #2 B34804 - DRIVEWAY AND PARKING - DEMOLITION

SCALE: 1/64" = 1'-0"

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, P

AR

KI

NG

AT

M

UN

IT

IO

NS

A

RE

AS

B3

2, B4

, B

4, B4

7A

PR

TE

PA

-S R

M

M N

AB

YW

AN

IE

C

CD-102

S

ST

AR

R

C E

BE

R

T

En gr

\D es ig n\ s\

\2

5\

0_ Su pp or t\0 _3

_D ra w in gs

AR

EA

#2 B

4 -

DR

IV

EW

AY

A

ND

P

AR

KI

NG

LA

YO

UT

DE

MO

LIT

IO

N

03 08

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. COORDINATE WITH USER FOR THIS REPLACEMENT.

3. ANY DAMAGE TO FENCE OR BUILDING SHALL BE REPAIRED AT CONTRACTOR'S

COST.

KEYED NOTES

DEMO AREA FOR NEW 6" PAVEMENT PROFILE, REF. 4/C-201.

MILL 2" OFF EXISTING PAVEMENT

LEGEND

EXCAVATE FOR NEW PAVEMENT PROFILE

/06 /24

UP

DA

TE

D

KE

YE

D

NO

TE

S/

SH

AD

ED

A

RE

A

AP

R2

RE

VI

SE

D

SH

EE

T

10'-51 2" 5'-

91 2"

18'-5"

1'-

6"88 '-8

1 2"

44'-6"

135'-10 12 "

'-1

2"

96' -7"

30' -6

2"

16'-10 12 "

12'

123'-2"65 '-0

1 2"

28'-101 2"

36'-5"

'-0"

65' -0"

25'-0" ±

AREA #2 34804

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CD-103

AREA #1 B41808- DRIVEWAY AND PARKING - DEMOLITION

SCALE: 1/32" = 1'-0"

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, P

AR

KI

NG

AT

M

UN

IT

IO

NS

A

RE

AS

B3

2, B4

, B

4, B4

7A

PR

TE

PA

-S R

M

M N

AB

YW

AN

IE

C

CD-103

S S

TA

R

R

C E

BE

R

T

En gr

\D es ig n\ s\

\2

5\

0_ Su pp or t\0 _3

_D ra w in gs

AR

EA

#1 B

8 -

DR

IV

EW

AY

A

ND

P

AR

KI

NG

LA

YO

UT

DE

MO

LIT

IO

N

04 08

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. COORDINATE WITH USER FOR THIS WORK.

3. THIS WORK IS ON THE AIRFIELD.

4. ANY DAMAGE TO FENCE OR RAMP SHALL BE REPAIRED AT CONTRACTOR'S COST.

KEYED NOTES

DO NOT DAMAGE REMAINING PAVEMENT.

DEMO AREA FOR NEW 6" PAVEMENT PROFILE, REF. 4/C-201.

/06 /24

UP

DA

TE

D

KE

YE

D

NO

TE

S

AP

R2

RE

VI

SE

D

SH

EE

T

'-6

2'-

1"

202'-3"

'-4

3'-3"153'-91 2"

'-8

1 2"

25'-41 2"

11'-01 2"

66'-10" 53'-51 2"

'-2

1 2" 16'-81

2"

'-6

26'-10"

72'-31 2"

15'-41 2"

'-3

SAW CUT

THE 6" PERFORATED

PIPE TO BE INSTALLED

ALONG THIS EDGE.

AREA #1

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

C-101

AREA # 3 B41508 - DRIVEWAY AND PARKING - NEW

SCALE: 1/32" = 1'-0"

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, P

AR

KI

NG

AT

M

UN

IT

IO

NS

A

RE

AS

B3

2, B4

, B

4, B4

7A

PR

TE

PA

-S R

M

M N

AB

YW

AN

IE

C

C-101

S S

TA

R

R

C E

BE

R

T

En gr

\D es ig n\ s\

\2

5\

0_ Su pp or t\0 _3

_D ra w in gs

AR

EA

#3 B

8 -

DR

IV

EW

AY

A

ND

P

AR

KI

NG

LA

YO

UT

NE

W

05 08

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. COORDINATE WITH USER FOR THIS PAVEMENT.

/06 /24

UP

DA

TE

D

KE

YE

D

NO

TE

S

AP

R2

RE

VI

SE

D

SH

EE

T

KEYED NOTES

ATTACH PARKING BLOCKS WITH REBAR PLACED AT A MINIMUM OF 2FT FROM

EDGE OF PAVEMENT.

LAYOUT PARKING SPACES AND PAINT PER UFC 3-201-01. MINIMUN LENGTH

FOR EACH INTERIOR STALL IS 22FT AND 9FT WIDE.

PLACE NEW 2" ASPHALT WEARING COARSE LAYER AFTER APPLYING A TACK

COAT OVER THE EXISTING CLEANED ASPHALT PAVEMENT AS PER DETAIL

3/C-201. MATCH THE EXISTING PAVEMENT SURFACE OF MUNITION RD. TOTAL

1200SY.

NEW 6" PAVEMENT PROFILE, REF. 4/C-201. SURFACE LAYER TO MATCH WITH

THE SURFACE OF THE ENTIRE DRIVEWAY AND PARKING LOT.ISTING ASPHALT

ROADWAY SURFACE OF LOOSE GRAVEL.

PROVIDE (8) NEW

PARKING SPACES

100'

15'

AREA #3

35'-0"±

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

C-102

AREA #2 B34804 - DRIVEWAY AND PARKING - NEW

SCALE: 1/64" = 1'-0"

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, P

AR

KI

NG

AT

M

UN

IT

IO

NS

A

RE

AS

B3

2, B4

, B

4, B4

7A

PR

TE

PA

-S R

M

M N

AB

YW

AN

IE

C

C-102

S S

TA

R

R

C E

BE

R

T

En gr

\D es ig n\ s\

\2

5\

0_ Su pp or t\0 _3

_D ra w in gs

AR

EA

#2 B

4 -

DR

IV

EW

AY

A

ND

P

AR

KI

NG

LA

YO

UT

NE

W

06 08

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. COORDINATE WITH USER FOR THIS PAVEMENT.

3. ANY DAMAGE TO FENCE OR BUILDING SHALL BE REPAIRED AT CONTRACTOR'S

COST.

KEYED NOTES

NEW 6" ASPHALT PAVEMENT PROFILE AS PER DETAIL 4/C-201. TOTAL 740 SY

APPLY SEAL COAT OVER ALL AREAS THAT WILL NOT BE RESURFACED.

NEW 2" ASPHALT WEARING COARSE LAYER AS PER DETAIL 3/C-201:

80FT X 40FT TO MATCH THE EXISTING PROFILE.

/06 /24

UP

DA

TE

D

KE

YE

D

NO

TE

S

AP

R2

RE

VI

SE

D

SH

EE

T

10'-51 2" 5'-

91 2"

18'-5"

'-1

2"

1'-

6"88 '-8

1 2"

44'-6"

135'-10 12 "

96' -7"2

36'-51 4"

16'-10 12 "

12'

123'-2"65 '-0

1 2"

28'-101 2"

30' -6

2" 15'

12'

65' -0"

25'-0" ±

'-0"

AREA #2

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

C-103

AREA #1 B41808 - DRIVEWAY AND PARKING - NEW

SCALE: 1/32" = 1'-0"

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, P

AR

KI

NG

AT

M

UN

IT

IO

NS

A

RE

AS

B3

2, B4

, B

4, B4

7A

PR

TE

PA

-S R

M

M N

AB

YW

AN

IE

C

C-103

S S

TA

R

R

C E

BE

R

T

En gr

\D es ig n\ s\

\2

5\

0_ Su pp or t\0 _3

_D ra w in gs

AR

EA

#1 B

8 -

DR

IV

EW

AY

A

ND

P

AR

KI

NG

LA

YO

UT

NE

W

07 08

GENERAL NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

2. COORDINATE WITH USER FOR THIS WORK.

3. THIS WORK IS ON THE AIRFIELD.

4. ANY DAMAGE TO FENCE OR RAMP SHALL BE REPAIRED AT CONTRACTOR'S COST.

KEYED NOTES

EXISTING PAVEMENT REMAINS.

APPLY SEAL COAT OVER ALL AREAS EXCEPT AREA #3.

PAVEMENT RECONSTRUCTION IN THIS SPECIFIC 60FT X 15FT; PAVEMENT

WAS NOTICED CRACKED AND WATER WAS BLEEDING OUTWARDS, DUE TO

APPARENTLY HIGH-WATER TABLE LEVEL ESPECIALLY AFTER RECENT RAIN.

RECOMMEND FD REPAIR TO THE AREA ONLY. DEWATERING WILL BE NEEDED

PRIOR TO THE FD REPAIR. RECOMMEND GEOTEXTILE MEMBRANE TO INHIBIT

MOISTURE. PLACE 6" PERFORATED UNDERDRAIN AROUND THE EAST EDGE

OF THE PAVEMENT TO BE REPLACED.

REFER TO DETAIL 4/C-201 AND DETAIL 1 / C-201.2

MA

R2

RE

VI

SE

D

SH

EE

TS

/LE

GE

ND

AP

R2

RE

VI

SE

D

SH

EE

T

153'-91 2"

'-8

1 2"

25'-41 2"

66'-10" 53'-51 2" 16'-81

2"

26'-10"

72'-31 2"

'-6

3 THE 6" PERFORATED

PIPE TO BE INSTALLED

ALONG THIS EDGE.

2'-

1"

202'-3"

15'-41 2"

'-3

'-4

3'-3"

'-2

1 2" 40 '-6

"11'-01 2"

AREA #1

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

PA

IR

R

OA

DW

AY

S, P

AR

KI

NG

AT

M

UN

IT

IO

NS

A

RE

AS

B3

2, B4

, B

4, B4

7A

PR

TE

PA

-S R

M

M N

AB

YW

AN

IE

C

C-201

S S

TA

R

R

C E

BE

R

T

En gr

\D es ig n\ s\

\2

5\

0_ Su pp or t\0 _3

_D ra w in gs

DE

TA

ILS

08 08

C-201

6" AC PAVEMENT - ATC

SCALE: NTS

C-201

2" ASPHALT WEARING COARSE OVERLAY

SCALE: NTS

C-201

SILT FENCE DETAIL

SCALE: NTS

C-201

6" PIPE UNDERDRAIN DETAIL

SCALE: NTS

AP

R2

RE

VI

SE

D

SH

EE

T

2" TYPE C AC

6" Modified Subgrade

4" TYPE A AC

Tack Coat

Prime Coat

1. ALL MATERIALS, EQUIPMENT AND CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE OKLAHOMA

DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

2. THE MODIFIED SUBGRADE SHALL BE COMPACTED TO 95% STANDARD DENSITY. HAVE A CBR > 8, AND A PI < 14.

3. ALL FILL AND LOOSE MATERIAL BELOW THE 6" MODIFIED SUBGRADE LAYER SHALL BE COMPACTED TO 90% MODIFIED

PROCTOR DENSITY IN LIFTS NO GREATER THAN 6".

6" Stabilized Aggregate Base Geotexile Membrane Sheet

2" VIRGIN TYPE C AC

EXISTING ASPHALT BINDER

Tack Coat

Sealant

Joint Detail

1/4"

NewExisting

1/2"

1. ALL MATERIALS, EQUIPMENT AND CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE OKLAHOMA DEPARTMENT

OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

2. AGGREGATE BASE SHALL CONFORM TO ODOT SPECIFICATION 703.1, TYPE C, AND BE COMPACTED TO 98% MODIFIED PROCTOR

DENSITY.

3. SUBGRADE SHALL BE LIME MODIFIED AT 6% AND SHALL BE COMPACTED TO 98% MODIFIED PROCTOR DENSITY, HAVE A CBR > 8, AND A PI < 14.

4. DISTURBED MATERIAL OR FILL BELOW THE MODIFIED SUBGRADE SHALL BE COMPACTED TO 95% MODIFIED PROCTOR DENSITY.

1. PERFORATED PIPE SHALL MEET THE REQUIREMENTS OF THE ODOT STANDARD SPECIFICATIONS, SECTION 726.

2. FILTER FABRIC SHALL MEET THE REQUIREMENTS OF THE ODOT STANDARD SPECIFICATIONS, SECTION 712.03.

3. FILTER STONE SHALL MEET THE REQUIREMENTS OF THE ODOT STANDARD SPECIFICATIONS,

SECTION 703.06.

1. SILT FENCE MATERIALS AND INSTALLATION SHALL MEET THE REQUIREMENTS OF THE ODOT

STANDARD SPECIFICATIONS, SECTION 221.

TEMPORARY SILT FENCE

RECOMMENDED TOE-IN METHOD

TEMPORARY SILT FENCE

SECTION

AutoCAD SHX Text

FILTER STONE

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

PERFORATED PVC PIPE

AutoCAD SHX Text

SUBGRADE

AutoCAD SHX Text

BASE

AutoCAD SHX Text

CONTINUE FABRIC

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 3"

AutoCAD SHX Text

12" MIN.

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

FLOW

AutoCAD SHX Text 12''

AutoCAD SHX Text

ROADWAY

AutoCAD SHX Text

FILL SLOPE

AutoCAD SHX Text

TYPICAL SILT FENCE PLACEMENT

AutoCAD SHX Text

FABRIC IN TRENCH

AutoCAD SHX Text

W/ BACKFILL

AutoCAD SHX Text

OR WOOD POSTS

AutoCAD SHX Text

(MIN.)

AutoCAD SHX Text 6''

AutoCAD SHX Text

FILTER

AutoCAD SHX Text

FABRIC

AutoCAD SHX Text

TEMPORARY

AutoCAD SHX Text

SEDIMENT BUILD UP

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

POST

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

6'' (MIN.)

AutoCAD SHX Text

42'' (MIN.) STEEL

AutoCAD SHX Text

60'' (MAX.) SPACING

AutoCAD SHX Text 90°

AutoCAD SHX Text 90°

AutoCAD SHX Text 2°

AutoCAD SHX Text 2°

01-150185-G101-G101
Sheets and Views
G101
02-150185-CD101-CD101
Sheets and Views
CD101
03-150185-CD102-CD102
Sheets and Views
CD102
04-150185-CD103-CD103
Sheets and Views
CD103
05-150185-C101-C101
Sheets and Views
C101
06-150185-C102-C102
Sheets and Views
C102
07-150185-C103-C103
Sheets and Views
C103
08-150185-C201-C201
Sheets and Views
C201
06-150185-C102-C102.pdf
Sheets and Views
C102
05-150185-C101-C101.pdf
Sheets and Views
C101
02-150185-CD101-CD101.pdf
Sheets and Views
CD101

File details come from the government source that posted it. Updated .