This is a Submittal Register for a construction project titled "Repair Arnold Ave Between H Ave and M Ave" located on Arnold Avenue (Project No. WWYK190230).

The register identifies 58 required contractor submissions organized across preconstruction submittals, certificates, product data, design data, testing and field reports, operation and maintenance data, and closeout submittals. Preconstruction submittals include health and safety plans, construction phasing plans, restoration plans, storm water pollution prevention plans, spray painting plans, construction debris analysis plans, baseline construction schedules (due within 10 days of Notice to Proceed), quality control plans, and submittal registers. Certificates required include welding permits, safety meetings documentation, FOD awareness training, fire ant compliance agreements, monthly debris management reports (due first week of each month), and monthly schedule updates. Product data submissions include lighting cut sheets, 12" RCP, precast inlet boxes, cast iron inlets, asphalt mix design, concrete mix design, prime coat, tack coat, lime, geo-grid, thermoplastic, traffic paint, and beads. Testing and field reports are required for aggregate, concrete, asphalt, and subgrade. Operation and maintenance deliverables include manuals (due 30 days prior to scheduled training), training plans, training content, training outlines, and training videos. Closeout submittals include working as-built drawings, record drawings, EPA and USDA designation certifications, DD Form 1354, and training completion validation. Weekly contract progress reports are required throughout the contract life using AF Form 3065 or equivalent. All submissions require Government/Architect-Engineer review and approval, with specific documentation requirements noted in the remarks column for certain items.

View the file

Other files

File Type Posted
Solicitation Amendment - FA813726R00270002.pdf PDF
Solicitation Amendment FA813726R00270002 SF 30.pdf PDF
WWYK109230 Repair Arnold Ave Between H Ave and M Ave RFI_s_Gov Response.pdf PDF
RFI_s_Gov Response Updated Drawings_WWYK190230_21JULY2026_REV1.pdf PDF
Att10_190230_SOW (REVISED).pdf PDF
Solicitation Amendment FA813726R00270001 SF 30.pdf PDF
WWYK150185 Repair Roadways Parking at Munitions Area_RFI_s_Gov Response.pdf PDF
Solicitation Amendment - FA813726R00270001.pdf PDF
RFI Gov Response Updated Drawings_WWYK150185.pdf PDF
WWYK150185 - 190230 Site Visit Sign in Sheet.pdf PDF
Tinker AFB Visitor Map_.pdf PDF
2020 TAFB Facility Standard.pdf PDF
LightingFixtureSchedule.xlsx XLSX spreadsheet
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
2 EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att12_150185_Drawings.pdf PDF
Att11_150185_Submittal Register.pdf PDF
Att10_150185_SOW.pdf PDF
Att10_190230_SOW.pdf PDF
Solicitation - FA813726R0027.pdf PDF
Wage Determination OK200260049.pdf PDF
WOSB Sec LM 22May26 Update (v3)_.pdf PDF
WWYK190230_Drawings.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Transm ittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

1 00 70 00 06 Test Reports Pre-Construction Testing Record 1.3.11 G

2 00 70 00 07 Certificates Welding, Cutting and Brazing Permit 1.4 G

3 00 71 00 01 Preconstruction Submittals Health and Safety Plan 1.3 G

4 00 71 00 01 Preconstruction Submittals Construction Phasing Plan 1.5 G

5 00 71 00 07 Certificates Safety Meetings 1.3

6 00 71 00 07 Certificates FOD Awareness and Prevention Training 1.4

7 00 72 00 01 Preconstruction Submittals Restoration Plan 1.3.2 G

8 00 72 00 01 Preconstruction Submittals Storm Water Pollution Prevention Plan 1.3.3.2 G

9 00 72 00 01 Preconstruction Submittals Spray Painting Plan 1.9 G

10 00 72 00 01 Preconstruction Submittals Environmental Management System Awareness Training 1.1

11 00 72 00 03 Product Data Affirmative Procurement Documentation 1.3.10 G Provide only one. Reference specification for additional information

12 00 72 00 07 Cerificates Fire Ant Federal Compliance Agreement or state phyto-sanitary certificate 1.3.4.1

13 00 72 00 08 Manufacturer's Instructions Safety Data Sheets/Material Safety Data Sheets 1.4

14 00 72 00 11 Closeout Submittals Notice of Termination (ODEQ Form 640-572) 1.3.3.2 G

15 00 72 00 - Attch 5 01 Preconstruction Submittals Construction Debris Analysis Plan 1.2.3 G

16 00 72 00 - Attch 5 07 Certificates Monthly Debris Management Report 2 G Provide 1st week of each month during construction

17 01 32 16.00 20 01 Preconstruction Submittals Baseline Construction Schedule 1.2 G Provide within 10 days of NTP.

18 01 32 16.00 20 07 Certificates Monthly Updates 1.4 Provide 1st week of each month during construction, or as directed by CO

19 01 32 16.00 20 07 Certificates 3-Week Look Ahead Schedule 1.6 Provide weekly with the Contract Progress Report

20 01 33 00 01 Preconstruction Submittals Submittal Register 1.8 G

21 01 45 00.00 10 01 Preconstruction Submittals Quality Control (QC) Plan 3.2 G

22 01 45 00.00 10 06 Test Reports QC Documentation 3.9 Provide weekly with the Contract Progress Report

23 01 50 00 01 Preconstruction Submittals Request for Contractor Staging Area 1.1 G

24 01 50 00 01 Preconstruction Submittals Photographic Record 1.3

25 01 78 00 03 Product Data Warranty Letter 1.7.1

26 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.4 G Provide (2) electronic sets (optical media) and

(1) hard copy

27 01 78 00 11 Closeout Submittals Working As-Built Drawings 3.1 G Provide (2) electronic sets (optical media) and

(2) hard copies

28 01 78 00 11 Closeout Submittals Record Drawings 3.3 G Provide (2) electronic sets (optical media) and

(1) hard copy

29 01 78 00 11 Closeout Submittals Certification of EPA Designated Items 2.3 G

30 01 78 00 11 Closeout Submittals Certification Of USDA Designated Items 2.4 G

31 01 78 00 11 Closeout Submittals DD FORM 1354 3.6 G

32 01 78 00 11 Closeout Submittals Checklist for DD FORM 1354 3.6 G

33 01 78 23 10 Operation and Maintenance Data Operation and Maintenance Data 1.2 G Provide 30 days prior to scheduled Training

34 01 78 23 10 Operation and Maintenance Data O&M Database 1.3 G

35 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G Provide 30 days prior to scheduled Final Inspection

TITLE: WWYK190230

SUBMITTAL REGISTER

JOB NAME: REPAIR ARNOLD AVE BETWEEN H AVE AND M AVE

LOCATION: Arnold Avenue

CONTRACT NO:

CONTRACTOR:

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

Submittal Register_v3_03/07/22

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Transm ittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

36 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G Provide 14 days prior to scheduled Training

37 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G Provide 14 days prior to scheduled Training

38 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4 G

39 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6 G

40 SOW 07 Certificates Contract Progress Report(s) 2.4 G Provide weekly throughout life of contract.

Utilize AF Form 3065, Contract Progress Report (or equal)

41 SOW Product Data Lighting Cut Sheet 3.9.2 f G

42 SOW Product Data 12" RCP 3.2 G

43 SOW Product Data Iprecast inlet box and cast iron inlets 3.2 G

44 SOW Design Data Csphalt Mix Design 3.2 G

45 SOW Design Data Concrete Mix Design 3.2 G

46 SOW Testing and field reports Aggregate 3.2 G

47 SOW Testing and field reports Concrete 3.2 G

48 SOW Testing and fField Reports Asphalt 3.2 G

49 SOW Product Data Prime Coat 3.2 G

50 SOW Product Data Tack Coat 3.2 G

51 SOW Product Data Lime 3.2 G

52 SOW Testing and Field Reports Subgrade 3.2 G

53 SOW Certificates Sod 3.2 G

54 SOW Product Data Geo- Grid (each type used) 3.2 G

55 SOW Product Data Thermoplastic 3.2 G

56 SOW Product Data Traffic Paint 3.2 G

57 SOW Product Data Beads 3.2 G

58 SOW Preconstruction Submittals Reinforcing Shop drawings 3.2 G