This document is a Pre-Bid Request for Information (RFI) Response memorandum for Project WWYK180061, involving the repair of HVAC systems at Building 3707, Tinker Air Force Base, Oklahoma. The memorandum provides detailed government responses to 13 specific technical inquiries from potential contractors, covering aspects such as preheat coils, roof screen walls, humidification systems, equipment controls, refrigerant types, sustainability requirements, and project-specific technical details.

Key technical requirements include converting MAU-1 and exhaust fans to automatic control, ensuring mechanical room detection systems are code-compliant, performing an arc flash analysis, and adhering to UFC 1-200-02 High Performance and Sustainable Building Requirements. The project contacts include Glen A. Kay (Project Manager), Adam Gibson (Construction Inspector), Joshua Wheeler (CSAG Program Manager), and Billy Deal (Contracting Officer Representative), with the document dated 08 May 2025. The opportunity is specifically targeted at 8(a) construction contractors with NAICS 236220 located in Oklahoma, with an initial site visit scheduled for 24 April 2025 and a placeholder proposal due date of 02 June 2025.

View the file

Other files

File Type Posted
WWYK180061 Repair HVAC B3707 RFI 004 Clarification Request GK.pdf PDF
180061 - Pre-Bid RFIs - 15 Sep 25 - GK.pdf PDF
180061 - Pre-Bid RFIs - 28 Aug 25 - User response - Combined.pdf PDF
180061 - Pre-Bid RFIs - 28 Aug 25 signed.pdf PDF
WWYK180061 - Pre-Bid RFI 2nd Response COR.pdf PDF
Solicitation - FA813725R0029.pdf PDF
Wage Determination.txt TXT text file
Section M - Evaluation Factors for Award.pdf PDF
Section L - Instructions to Bidders (2-Step).pdf PDF
B3707 High Bay East Wall.jpg JPG image
site visit sign in.pdf PDF
00 80 05.pdf PDF
32 01 17.62.docx DOCX document
23 08 00.pdf PDF
10 22 13.pdf PDF
32 17 23.pdf PDF
tinkerafb_INRMP.pdf PDF
USB-010874_TAFB TO3 B3707_HW_RevC_Redlines_04302018.pdf PDF
23 05 48.00 40.pdf PDF
07 53 23.pdf PDF
28 31 33.00 10.pdf PDF
23 05 15.pdf PDF
dafi21-101.pdf PDF
06 41 16.00 10.pdf PDF
23 65 00.docx DOCX document
07 52 00.pdf PDF
32 12 15.docx DOCX document
08 51 23.pdf PDF
32 13 73.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
32 01 22.pdf PDF
TABLE OF CONTENTS_no Anno.docx DOCX document
32 16 13.pdf PDF
23 57 10.pdf PDF
05 12 00.pdf PDF
afman40-201.pdf PDF
10 14 00.10.pdf PDF
2023 TAFB FIRE PROTECTION STANDARD.pdf PDF
32 17 23.docx DOCX document
UMRL.pdf PDF
07 51 13.pdf PDF
07 42 13.pdf PDF
GEOWEB.pdf PDF
07 31 13.pdf PDF
07 24 00.pdf PDF
08 11 16.pdf PDF
afi91-202_afmcsup.pdf PDF
32 16 13.docx DOCX document
180061_Submittal Register_v4.pdf PDF
afman32-7003.pdf PDF
Show 40 more

Latest 50 of 309 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 72 AIR BASE WING (AFMC)

TINKER AIR FORCE BASE OKLAHOMA

08 May 25

MEMORANDUM FOR AFSC/PZIOC (ATTN: Stephen Palmer)

THROUGH: 72 ABW/CENM

FROM: 72 ABW/CEED

Tepa Companies

SUBJECT: Pre-Bid RFI Responses Project: WWYK180061 – Repair HVAC System – B3707

Reference: Memo, 02 May 2025, Pre-Bid RFIs, WWYK180061 – Repair HVAC System –

B3707

1. This office reviewed the referenced RFIs for the subject project and provided answers below. Please forward to the contractor(s) for their use in preparing proposals

(1) Request for information. There are no Preheat coils scheduled for AHU-1, 2 and 3. Will any heating be required in mixed air plenum for freeze protection when building is unoccupied?

Government Response: Existing AHU’s have hot water preheat coils and should be included in the new AHU’s design.

(2) Request for information. Will roof screen walls be required to be provided if Mechanical

Equipment is moved out from behind existing screen walls?

Government Response: Yes. Roof penetrations must be coordinated to maintain the current roof warranty.

(3) Request for information. Existing Steam Humidifier System was “Locked Out” during the site investigation. Will the government put the Steam Humidification System back in service to allow for system testing and commissioning?

Government Response: Yes. Humidification system was Locked Out due to seasonal requirements.

(4) Request for information. Are there any controls system requirement for the existing heating water boilers?

Government Response: Additional points are required for operation. Verify requirements in HVAC controls Points List for proper operation.

(5) Request for information. MAU-1 Controls Sheet M-705: MAU-1 Serves area with Paint Booth and Hood. Is there an Exhaust Fan interlock requirement? What controls are required for existing Exhaust Fans?

Government Response: MAU-1 and exhaust fans are operated manually. This equipment is to be converted to automatic control with connection and GUI to the Honeywell EBI.

(6) Request for information. Are there any ATFP requirements for existing building exhaust fans?

Government Response: No

(7) Request for information. New Chiller is scheduled with R-134A and the refrigerants are moving to R-513A. IS R513A acceptable.

Government Response: Yes. This project will follow DOE requirements for refrigerants.

(8) Request for information. Will the existing Mechanical Room Detection system be required to be CODE COMPLIANT with new chillers?

Government Response: Yes. UFC 3-410-01 shall govern with ASHRAE 15 compliance.

(9) Request for information. Rm 102 and 103 on Sheet AC-103 indicates replacement of

Sheetrock Ceiling will existing equipment and hoods be removed to replace the ceiling?

Government Response: The contractor will be responsible for removing and reinstalling all equipment and hoods as necessary to full fill the requirements of the project scope.

(10) Request for information. If the proposed HVAC Systems are similar to system presented in the reference drawings will Life Cycle Cost or Energy analysis be required?

Government Response: Yes

(11) Request for information. Are there requirements for Sustainability in the project?

Government Response: Yes, IAW UFC 1-200-02 High Performance and Sustainable Building Requirements as stated in the SOW para. 3.5.2.1.

(12) Request for information. Is the Short Circuit Analysis available from the original design?

Government Response: No. An arc flash analysis must be performed.

(13) Request for information. Was a Life Safety Analysis and Plan provided with the previous design and is it available?

Government Response: Yes. Refer to the Reference Design drawings sheet G-101.

2. The points of contact for this project are:

a. Glen A. Kay, Project Manager. PH: 734-6917

b. Adam Gibson, Construction Inspector. PH: 736-5028

c. Joshua Wheeler, CSAG Program Manager. PH: 582-4826

d. Billy Deal, Contracting Officer Representative (COR). PH: 405-739-4975

Glen A. Kay Billy Deal Project Manager Mechanical Engineer/COR 72d Civil Engineering Directorate (Tepa) 72d Civil Engineering Directorate

No Attachment(s):

cc:

Project folder

2025-05-09T12:26:13-0500
DEAL.BILLY.LEE.III.1164437694
2025-05-09T13:07:23-0500
KAY.GLEN.AMOS.1612399464

File details come from the government source that posted it. Updated .