This document is a Pre-Bid Request for Information (RFI) memorandum from the Department of the Air Force, Headquarters 72 Air Base Wing at Tinker Air Force Base, Oklahoma, dated 12 Sep 2025. The RFI addresses Project WWYK180061 for Repair of HVAC System in Building B3707, and provides responses to specific technical questions from potential contractors. Key technical clarifications include requirements for arc flash studies and labels (which must follow Tinker Base Standards with specific label details), UL Lightning Protection System (LPS) inspection certification, and material specifications for modular channel components (which must be stainless steel).

The document outlines strict procedural guidelines, noting that RFIs are only permitted during Phase One Technical Proposal Process and prohibited during Phase Two Price Bid Process. Points of contact are provided, including Glen Kay (Project Manager), Adam Gibson (Construction Inspector), Joshua Wheeler (CSAG Program Manager), and Arnaud Koeumo (Contracting Officer Representative), with their respective phone numbers. The memorandum is signed by the Project Manager and Contracting Officer Representative, indicating official review and approval of the RFI responses to guide potential contractors in preparing their proposals.

View the file

Other files

File Type Posted
WWYK180061 Repair HVAC B3707 RFI 004 Clarification Request GK.pdf PDF
180061 - Pre-Bid RFIs - 28 Aug 25 - User response - Combined.pdf PDF
180061 - Pre-Bid RFIs - 28 Aug 25 signed.pdf PDF
WWYK180061 - Pre-Bid RFI 2nd Response COR.pdf PDF
Solicitation - FA813725R0029.pdf PDF
Wage Determination.txt TXT text file
Section M - Evaluation Factors for Award.pdf PDF
WWYK180061 - Pre-Bid RFI ResponseCOR GK.pdf PDF
Section L - Instructions to Bidders (2-Step).pdf PDF
B3707 High Bay East Wall.jpg JPG image
site visit sign in.pdf PDF
00 80 05.pdf PDF
32 01 17.62.docx DOCX document
23 08 00.pdf PDF
10 22 13.pdf PDF
32 17 23.pdf PDF
tinkerafb_INRMP.pdf PDF
USB-010874_TAFB TO3 B3707_HW_RevC_Redlines_04302018.pdf PDF
23 05 48.00 40.pdf PDF
07 53 23.pdf PDF
28 31 33.00 10.pdf PDF
23 05 15.pdf PDF
dafi21-101.pdf PDF
06 41 16.00 10.pdf PDF
23 65 00.docx DOCX document
07 52 00.pdf PDF
32 12 15.docx DOCX document
08 51 23.pdf PDF
32 13 73.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
32 01 22.pdf PDF
TABLE OF CONTENTS_no Anno.docx DOCX document
32 16 13.pdf PDF
23 57 10.pdf PDF
05 12 00.pdf PDF
afman40-201.pdf PDF
10 14 00.10.pdf PDF
2023 TAFB FIRE PROTECTION STANDARD.pdf PDF
32 17 23.docx DOCX document
UMRL.pdf PDF
07 51 13.pdf PDF
07 42 13.pdf PDF
GEOWEB.pdf PDF
07 31 13.pdf PDF
07 24 00.pdf PDF
08 11 16.pdf PDF
afi91-202_afmcsup.pdf PDF
32 16 13.docx DOCX document
180061_Submittal Register_v4.pdf PDF
afman32-7003.pdf PDF
Show 40 more

Latest 50 of 309 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 72 AIR BASE WING (AFMC)

TINKER AIR FORCE BASE OKLAHOMA

12 Sep 2025

MEMORANDUM FOR AFSC/PZIOC (ATTN: Stephen Palmer)

THROUGH: 72 ABW/CENM

FROM: 72 ABW/CEED

Tepa Companies

SUBJECT: Pre-Bid RFI Responses Project: WWYK180061 – Repair HVAC System – B3707

Reference: Memo, 10 Sep 2025, Pre-Bid RFIs, WWYK180061 – Repair HVAC System – B3707

1. This office reviewed the referenced RFIs for the subject project and provided answers below. Please forward to the contractor(s) for their use in preparing proposals

RFIs ARE ONLY PERMITTED DURING PHASE ONE TECHNICAL PROPOSAL PROCESS.

NO RFIs ARE TO BE SUBMITTED DURING PHASE TWO PRICE BID PROCESS.

34. Please clarify SOW paragraph 4.14.1.4(b) and reference design narrative paragraph 8.5.

Is it the intent to perform an arc flash study for any new electrical distribution equipment, but then install “generic” arc flash labels?

Government Response: Perform a flash study and install the “generic arc flash labels.

Flash study shall be turned over to Base Civil Engineering.

Per Tinker Base Standards section 1.2.7.a labels from studies are to have company name, date of analysis, equipment identification, required PPE, risk category, incident energy and shock protection. Please confirm we are to follow the base standard and NOT install generic labels on equipment.

Government Response: Follow Base Standards.

38. Since the SOW does not require a complete new LPS would a UL letter of findings be sufficient in lieu of a UL inspection certificate?

Government Response: Provide UL LPS inspection Certificate.

Per Tinker Base Standards section 1.2.7.a labels from studies are to have company name, date of analysis, equipment identification, required PPE, risk category, incident energy and shock protection. Please confirm we are to follow the base standard and NOT install generic labels on equipment.

Government Response: Follow Base Stand

43. Detail 1, sheet E-501 includes a note “all components shall be stainless steel.” This note implies that all modular channel is to be stainless steel. Would it be acceptable for modular channel and related hardware to be protected from corrosion in some other fashion?

Government Response: Provide details of proposed recommendations and provided benefits. If not available comply with note that all components shall be stainless steel.

Please confirm if channel materials constructed of galvanized steel would be accept

Government Response: Comply with Detail 1, sheet E-501: Modular Channel shall be Stainless Steel.

2. The points of contact for this project are:

a. Glen Kay, Project Manager. PH:734-6917

b. Adam Gibson, Construction Inspector. PH: 736-5028

c. Joshua Wheeler, CSAG Program Manager. PH: 582-4826

d. Arnaud Koeumo, Contracting Officer Representative (COR). PH: 734-3202

Glen Kay Arnaud Koeumo Project Manager Contracting Officer Representative 72d Civil Engineering Directorate (Tepa) 72d Civil Engineering Directorate

No Attachment(s):

cc:

Project folder

2025-09-15T10:45:27-0500
KAY.GLEN.AMOS.1612399464
2025-09-15T11:09:09-0500
KOUEMO.ARNAUD.NGASSEU.1269207600

File details come from the government source that posted it. Updated .