This memorandum is a Pre-Bid Request for Information (RFI) response for Project WWYK180061, a repair of the HVAC system at Building 3707 on Tinker Air Force Base. The document addresses three specific contractor inquiries: confirmation of the facility's fire sprinkler system coverage (fully sprinklered), clarification on the timeline for Price Proposal submission (to be included in the Letter to Acceptable Offerors), and requirements for screen walls around roof-mounted equipment (all roof equipment must be behind screen walls).

The document provides contact information for key project personnel, including Glen A. Kay (Project Manager), Adam Gibson (Construction Inspector), Joshua Wheeler (CSAG Program Manager), and Billy Deal (Contracting Officer Representative). The project is part of an 8(a) competitive two-step solicitation specifically targeting construction contractors with NAICS 236220 located in Oklahoma, with an initial site visit scheduled for 24 April 2025 and a placeholder proposal due date of 02 June 2025. The solicitation is being managed by the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other files

File Type Posted
WWYK180061 Repair HVAC B3707 RFI 004 Clarification Request GK.pdf PDF
180061 - Pre-Bid RFIs - 15 Sep 25 - GK.pdf PDF
180061 - Pre-Bid RFIs - 28 Aug 25 - User response - Combined.pdf PDF
180061 - Pre-Bid RFIs - 28 Aug 25 signed.pdf PDF
Solicitation - FA813725R0029.pdf PDF
Wage Determination.txt TXT text file
Section M - Evaluation Factors for Award.pdf PDF
WWYK180061 - Pre-Bid RFI ResponseCOR GK.pdf PDF
Section L - Instructions to Bidders (2-Step).pdf PDF
B3707 High Bay East Wall.jpg JPG image
site visit sign in.pdf PDF
00 80 05.pdf PDF
32 01 17.62.docx DOCX document
23 08 00.pdf PDF
10 22 13.pdf PDF
32 17 23.pdf PDF
tinkerafb_INRMP.pdf PDF
USB-010874_TAFB TO3 B3707_HW_RevC_Redlines_04302018.pdf PDF
23 05 48.00 40.pdf PDF
07 53 23.pdf PDF
28 31 33.00 10.pdf PDF
23 05 15.pdf PDF
dafi21-101.pdf PDF
06 41 16.00 10.pdf PDF
23 65 00.docx DOCX document
07 52 00.pdf PDF
32 12 15.docx DOCX document
08 51 23.pdf PDF
32 13 73.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
32 01 22.pdf PDF
TABLE OF CONTENTS_no Anno.docx DOCX document
32 16 13.pdf PDF
23 57 10.pdf PDF
05 12 00.pdf PDF
afman40-201.pdf PDF
10 14 00.10.pdf PDF
2023 TAFB FIRE PROTECTION STANDARD.pdf PDF
32 17 23.docx DOCX document
UMRL.pdf PDF
07 51 13.pdf PDF
07 42 13.pdf PDF
GEOWEB.pdf PDF
07 31 13.pdf PDF
07 24 00.pdf PDF
08 11 16.pdf PDF
afi91-202_afmcsup.pdf PDF
32 16 13.docx DOCX document
180061_Submittal Register_v4.pdf PDF
afman32-7003.pdf PDF
Show 40 more

Latest 50 of 309 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 72 AIR BASE WING (AFMC)

TINKER AIR FORCE BASE OKLAHOMA

04 Jun 25

MEMORANDUM FOR AFSC/PZIOC (ATTN: Stephen Palmer)

THROUGH: 72 ABW/CENM

FROM: 72 ABW/CEED

Tepa Companies

SUBJECT: Pre-Bid RFI Responses Project: WWYK180061 – Repair HVAC System – B3707

Reference: Memo, 22 May 2025, Pre-Bid RFI 002, WWYK180061 – Repair HVAC System –

B3707

1. This office reviewed the referenced RFIs for the subject project and provided answers below. Please forward to the contractor(s) for their use in preparing proposals

(1) Request for information. Please confirm whether the entire existing facility is fully protected by an automatic fire sprinkler system, including all occupied areas and support spaces such as mechanical rooms, storage areas, and similar spaces.

Government Response: The building is fully sprinklered.

(2) Request for information. Following submission of the Technical Proposal, please clarify the timeline or number of days the Government allows before the Price Proposal will be due.

Government Response: The due date for Price Proposals will be included on the Letter to Acceptable Offerors.

(3) Request for information. New roof mounted equipment on drawings do not indicate providing screen walls. Are screen walls required around additional roof equipment?

Government Response: All roof mounted equipment shall be behind screen walls. If the design relocates roof mounted equipment, the equipment shall be behind screen walls.

2. The points of contact for this project are:

a. Glen A. Kay, Project Manager. PH: 734-6917

b. Adam Gibson, Construction Inspector. PH: 736-5028

c. Joshua Wheeler, CSAG Program Manager. PH: 582-4826

d. Billy Deal, Contracting Officer Representative (COR). PH: 405-739-4975

Glen A. Kay Billy Deal Project Manager Mechanical Engineer/COR 72d Civil Engineering Directorate (Tepa) 72d Civil Engineering Directorate

No Attachment(s):

cc:

Project folder

2025-06-04T14:08:52-0500
KAY.GLEN.AMOS.1612399464
2025-06-06T10:24:04-0500
DEAL.BILLY.LEE.III.1164437694

File details come from the government source that posted it. Updated .