FA813226Q0029 - ATT 4 Quote Sheet (Amd 06) 2026 07 30.pdf

PDF 241 KB Posted

Attached to
Next Gen High Pressure Cold Spray System
Solicitation number
FA813226Q0029
Issued by

About this file

This is Amendment 06 to a Quote Sheet for solicitation FA813226Q0029, issued by Tinker Air Force Base for a Next Generation High Pressure Cold Spray System. Offerors must complete and return the quote sheet with authorized signatures and are required to be registered in the System for Award Management (SAM).

The solicitation includes two Contract Line Item Numbers (CLINs). CLIN 0001 requires a complete Next Generation High Pressure Cold Spray System as a single lot purchase, comprising an Impact Innovation EvoCSII Cold Spray Machine configured for helium and nitrogen carrier gas with multi-gas spray capability, nozzle cooling, powder feeder station with two feeders, a Fanuc M-710iC/50 Industrial Robot, a Nitrogen Supply System with 3600 psig compressor capacity at 99.999% purity, an Argon Fire Suppression System meeting NFPA 484 and 2001 standards, a HiWatch HR2 Particle Measurement System, a ReliaCoat In-Situ Coating Property Sensor, a Dust Handler/Collector with spark arrester, high-pressure gas plumbing, ancillary equipment, system integration, installation, and training as detailed in the Statement of Work. CLIN 0002 covers optional storage costs for up to ten months during the initial Civil Engineering coordination period, available only for months three through twelve after award and only with proof of receipt at the contractor's facility. Offerors must provide warranty information for all items, specify payment terms with NET 30 standard, delivery time in days after receipt of order, and note that installation may be delayed up to 18 months pending Tinker AFB Civil Engineering approvals for installation methods affecting real property and infrastructure. By signing Section 3, offerors certify agreement to furnish all items per solicitation terms and conditions and may be required to provide commercial product literature.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 06 – 2026 Jul 30

QUOTE SHEET

Solicitation # FA813226Q0029 – Next Gen High Pressure Cold Spray System

Tinker AFB, OK

Offerors are REQUIRED to return the portion of this CSS below with the completed information and authorized signature. Offerors may also provide their company’s quotation sheet in addition to this response page.

SECTION 1 – OFFEROR INFORMATION

Company Name Address

CAGE Code and SAM UEI

The Government cannot enter into contracts or agreements with Offerors not registered in SAM. For registration information, visit the SAM website (https://www.sam.gov/) and follow the instructions in the Quick Start Guide For SAM Registration, which can be found under the Help Tab and User Guides submenu.

Business Size Web Page URL Point of Contact POC Phone # and email address

SECTION 2 – SUPPLIES AND PRICE

CLIN

Description/Product

Qty

Unit

Unit Price

Total Price

0001 NEXT GEN HIGH PRESSURE COLD SPRAY

SYSTEM: consisting of the following equipment --

- Impact Innovation EvoCSII Cold Spray Machine – [BRAND NAME] configured for Helium & Nitrogen Carrier Gas and Mutli-Gas Sprays; equipped with nozzle cooling, powder feeder station configured for 2 powder feeders, and 2 powder feeders; EvoCSII 6/11 AH Cold Spray Gun; includes all additional tools listed in Appendix A of the Statement of Work (SOW). See SOW for machine details.

- Fanuc M-710iC/50 Industrial Robot – [BRAND NAME] delivered with all options listed in the SOW.

- Nitrogen Supply System – capacity sufficient to meet gas consumption on 4-6 week refill schedule;

compressor sized to produce 3600psig; gas provided at 99.999% purity; configured for outdoor service;

configured with capacity telemetry to schedule delivery;

foundation assessment (new foundation, if required); see SOW for details.

- Argon Fire Suppression System – meets requirements set in NFPA 484 and NFPA 2001. See SOW for details.

- HiWatch HR2 Particle Measurement System – [BRAND NAME] with sensor. See SOW for details.

- ReliaCoat In-Situ Coating Property (ICP-8) Sensor

– [BRAND NAME] see SOW for details.

- Dust Handler/Collector – with spark arrester and blast venting. See SOW for details.

1 LOT $ $

*** Please provide us with warranty information for any and all items in this RFQ ***

Payment Terms / Discount Terms

NET 30 / _______% In _______ Days After Invoice Submission in WAWF

An example of a payment discount would be 2.5% in 7 days, which means that although we have 30 days to pay you after submission of invoices, we would receive a 2.5% discount if we paid you within 7 days.

Delivery Time

___________ Days after Receipt of Order

NOTE: Installation may be delayed for up to 18 months due to coordination with and approvals from Tinker AFB Civil Engineering regarding your suggested installation methods as they apply to altering real property/infrastructure.

SECTION 3 – CERTIFICATION OF RESPONSE

The Offeror is required to sign this document and return a copy to issuing office. By signing and returning this, the Offeror agrees to furnish and deliver all items set forth or otherwise identified above and on any additional sheets subject to the terms, conditions, provisions, clauses, and specifications of the solicitation

- High-Pressure Gas Plumbing – see SOW for details.

- Ancillary Equipment – all additional items and components included as listed in SOW

- System Integration – as outlined in SOW.

- Installation – see SOW for details.

- Training – see SOW for details.

All details are listed in the Statement of Work (SOW).

0002 STORAGE: for standby/storage costs due to initial CE coordination delays.

- This will ONLY be used during the initial CE coordination period prior to the work start date, which will be determined by the Contracting Officer (CO).

- The CO must have proof of receipt of items at the Contractor’s facility in order to agree to activate this

CLIN.

- This CLIN cannot be used for the first two months after date of award; it is only for the 3rd–12th months after date of award IF REQUIRED.

- This CLIN will be discontinued at the end of the storage month that the CO informs the vendor to start work. If CO informs vendor to start work and there is 10 or less days left in the current storage month, 15 days of additional storage will be authorized starting the next storage month at the price of half a month.

10 MO $ $

TOTAL OFFER AMOUNT $

and award (if received). The Offeror may be required to provide commercial product literature for any or all items quoted above as required/requested by the Contracting Officer.

NAME OF OFFEROR’S REPRESENTATIVE TITLE

SIGNATURE DATE

Solicitation # FA813226Q0029 – Next Gen High Pressure Cold Spray System

File details come from the government source that posted it. Updated .