03-1249-TSUM (Month Day, 2009)
MTS-8 TEST STATION USER’S MANUAL
For The
AIR LAUNCHED CRUISE MISSILE (ALCM)
In Support of the
AGING & SURVEILLANCE PROGRAM
(AGM-86)
Prepared for:
498th MSUG
7339 Sentry Blvd
Tinker AFB, OK 73145
Revision History
Revision Date Summary of Changes
Basic TBD
Table of Contents Section Page
1 SAFETY SUMMARY
1.1 General WARNINGS
1.2 High Potential Test WARNINGS
2 ANCILLARY TEST AND HANDLING EQUIPMENT
2.1 Ancillary Test Equipment
2.2 Ancillary Handling Fixtures and Test Fixtures
2.3 Consumables
3 MAJOR EQUIPMENT ITEMS
4 TEST STATION DESCRIPTION
4.1 Hardware
4.2 Interface Test Adapters
4.3 Instrumentation Rack
4.3.1 Digital Multi-Meter
4.3.2 Oscilloscope
4.3.3 Milliohmmeter
4.3.4 Impact Sensor Accelerometer Signal Conditioner
4.3.5 HYPOT
4.3.6 AC Power Distribution Box
4.3.7 Power Supplies
4.4 Software
4.4.1 A&S Test Executive
4.4.2 Warhead Arming Device Routines
4.4.3 Impact Sensor Routines
4.4.4 Rotary Switch Routines
5 CALIBRATION & ALIGNMENT
5.1 MTS-8 Test Station
5.2 Ancillary Equipment
5.3 A&S Complex Calibrated Component Replacement Procedures
5.3.1 Model 979 HE Mass Spectrometer Leak Detector
5.3.2 Tension Compression Stand
5.3.2.1 Advanced Force Gauge AFG 500N
5.3.2.1.1 Removal
5.3.2.1.2 Installation
5.3.2.2 TC2 Height Scale (Not Used)
5.3.2.2.1 Removal
5.3.2.2.2 Installation
5.3.3 Accelerometers and Simulator
5.3.4 Electronic Test Equipment
5.3.4.1 HP 3458A Digital Multimeter
5.3.4.1.1 Removal
5.3.4.1.2 Installation
5.3.4.2 TDS 420 Oscilloscope
5.3.4.2.1 Removal
5.3.4.2.2 Installation
5.3.4.2.3 Verify Internal Diagnostics Pass
5.3.4.3 7550DT Dielectric Analyzer (Hypot Tester)
5.3.4.3.1 Removal
5.3.4.3.2 Installation
6 ALCM A&S TEST PROCEDURES
6.1 MTS-8 Test Station & Station Controller Power Up Procedure
6.2 MTS-8 Test Station & Station Controller Self Test Procedure
6.3 ALCM A&S Test Selection
6.3.1 Warhead Arming Device
6.3.1.1 WAD ITA #1 Self Test Procedure
6.3.1.2 WAD ITA #2 Self-Test Procedure
6.3.1.3 WAD A&S Unique Test Procedure
6.3.1.4 WAD Helium Leak Check Procedure
6.3.1.4.1 WAD Helium Leak Test Stand Setup
6.3.1.4.2 WAD Helium Leak Test
6.3.1.4.3 WAD Helium (He) Leak Sniff Test
6.3.1.4.4 WAD Helium Leak Post-Test
6.3.1.4.5 WAD Helium Leak Test Stand Shutdown
6.3.1.5 WAD Basic Functional Test Procedure
6.3.1.6 WAD Environmental Test Procedure
6.3.1.7 WAD Extended Functional Test Procedure
6.3.2 Impact Sensor
6.3.2.1 Impact Sensor Static Test ITA #1 Self-Test Procedure
6.3.2.2 Impact Sensor Static Test Procedure
6.3.2.3 Impact Test Alignment Check
6.3.2.4 Impact Sensor Dynamic Test ITA #2 Self-Test Procedure
6.3.2.5 Impact Sensor Dynamic Test Procedure
6.3.2.6 Shock Machine Shutdown Procedure
6.3.3 Rotary Switch
6.3.3.1 RS ITA #1 Self-Test Procedure
6.3.3.2 RS ITA #2 Self-Test Procedure
6.3.3.3 Rotary Switch ITA #3 Self-Test Procedure
6.3.3.4 RS A&S Unique Test Procedure
6.3.3.5 RS Helium Leak Check Procedure
6.3.3.5.1 RS Helium Leak Test Stand Setup
6.3.3.5.2 RS Helium Leak Test
6.3.3.5.3 RS Helium (He) Leak Sniff Test
6.3.3.5.4 RS Helium Leak Post-Test
6.3.3.5.5 RS Helium Leak Test Stand Shutdown
6.3.3.6 RS Basic Functional Test Procedure
6.3.3.7 RS Environmental Test Procedure
6.3.3.8 RS Extended Functional Test Procedure
7 FAILURE REPORTING PROCEDURE
8 MTS-8 DATA ARCHIVES (STATIC TEST EXAMPLE)
9 TEST DATA ARCHIVES
10 A&S TEST FLOWS
11 ALCM A&S TEST COMPLEX DRAWING TREE
12 SHOCK MACHINE OPTICAL READER ALIGNMENT PROCEDURE
13 TROUBLESHOOTING
13.1 Controller
13.1.1 Monitor
13.2 MTS-8 Test Station
List of Tables Table Page
Table 2-1. Handling Equipment
Table 2-2. Consumables
Table 4-1. Test Program Support Files
Table 5-1. Test Station Calibration Information
Table 5-2. 3458A Calibration Information
Table 5-3. 4338B Calibration Information
Table 5-4. 4263B Calibration Information
Table 5-5. Ancillary Equipment Calibration and PMI Requirements
Table 6-1. Test Environments for WAD Orientations 1, 2 and 3
Table 6-2. Test Environments for Rotary Switch Orientations 1, 2 and 3
List of Figures Figure Page
Figure 2-1. Warhead Arming Device Vibration Fixture
Figure 2-2. Rotary Switch Vibration Fixture
Figure 2-3. Rotary Switch Timing Test Fixture
Figure 2-4. Rotary Switch Force Displacement Test Fixture
Figure 2-5. Shock Test Machine Holding Fixture
Figure 2-6. Furnace
Figure 4-1. MTS-8 Test Station and Station Control PC
Figure 4-2. Controller (Rear View) and ALCM A&S Test Complex I/O
Figure 4-3. MTS8 Self-Test ITA
Figure 4-4. Impact Sensor ITA #1, 03-1039-0200 (Static Test)
Figure 4-5. Impact Sensor ITA #2, 03-1162-0900 (Dynamic Test)
Figure 4-6. Rotary Switch ITA #1 (Loadbox and Interface Chassis), 03-1249-0500
Figure 4-7. Rotary Switch ITA #1 Loadbox (Internal View)
Figure 4-8. Rotary Switch ITA #2, 03-1249-0700
Figure 4-9. Rotary Switch ITA #3, PN 03-1162-0800
Figure 4-10. Warhead Arming Device ITA #1 (Loadbox and Chassis), 03-1039-0300
Figure 4-11. Warhead Arming Device ITA #1 Loadbox (Internal Views)
Figure 4-12. Warhead Arming Device ITA #2, 03-1162-0400
Figure 4-13. HP 3458A DMM
Figure 4-14. Tektronix TDS 420A Oscilloscope
Figure 4-15. HP 4338B Milliohmmeter
Figure 4-16. Endevco 2775B Signal Conditioner
Figure 4-17. HYPOT 7550DT
Figure 4-18. AC Distribution Box Rear View
Figure 4-19. AC Distribution Box Internal View
Figure 4-20. AC Box Enable and Emergency Stop Switch
Figure 4-21. 66103A and 66104A DC Power Supplies
Figure 4-22. ALCM A&S Tests
Figure 4-23. Warhead Arming Device A&S Test
Figure 4-24. A&S Test Monitor Screen
Figure 4-25. Impact Sensor A&S Test
Figure 4-26. Impact Sensor Dynamic Test
Figure 4-27. Rotary Switch A&S Test
Figure 5-1. HP 3458A Digital Multimeter IO Connection
Figure 5-2. TDS 420 Oscilloscope IO Connections
Figure 5-3. 7550DT Dielectric Analyzer (Hypot Tester) IO Connections
Figure 6-1. Facility Air Supply Connection
Figure 6-2. Air Isolation and Armature Support Controls
Figure 6-3. Orientation 1 - WAD Adapter Mounted to L Fixture
Figure 6-4. Safe Link
Figure 6-5. WAD Orientation 1
Figure 6-6. Chamber Access Hole
Figure 6-7. Orientation 1 - Cable Connections
Figure 6-8. Orientation 1 - Accelerometer Placement
Figure 6-9. Accelerometer Cable Routing
Figure 6-10. Close Chamber Door
Figure 6-11. Accelerometer Breakout Box
Figure 6-12. Chamber Touch Screen
Figure 6-13. Shaker Controller Main Power Switch
Figure 6-14. Controller Desktop
Figure 6-15. Mode Key Switch
Figure 6-16. WAD Orientation 2
Figure 6-17. Orientation 2 - Cable Connections
Figure 6-18. Orientation 2 - Accelerometer Placement
Figure 6-19. WAD Orientation 3
Figure 6-20. Orientation 3 - Cable Connections
Figure 6-21. Orientation 3 - Accelerometer Placement
Figure 6-22. Mechanical Safing Link
Figure 6-23. Calibration Certificate
Figure 6-24. Accelerometer Simulator On/Off Switch
Figure 6-25. Accelerometer Simulator Output Connection
Figure 6-26. Pump Fluid Level
Figure 6-27. He Leak Tester Power Switch
Figure 6-28. Extension Cable P4 connected to He Leak Test Stand J4
Figure 6-29. Pressure Gauge LED
Figure 6-30. He Regulator
Figure 6-31. Facility Air Supply
Figure 6-32. Removing Excess Paint from Leak Test Port
Figure 6-33. Removing Leak Test Port Screw
Figure 6-34. Clean Sealing Area
Figure 6-35. Clean Tester Base Plate
Figure 6-36. Remove Protective End Cap
Figure 6-37. Install Test Port Washer
Figure 6-38. Install Leak Test Adapter
Figure 6-39. Place Rubber Pad on Base Plate
Figure 6-40. Place Rotary Switch on Rubber Pad
Figure 6-41. Connect Vacuum Line
Figure 6-42. Clean Bell Jar Base
Figure 6-43. Place Bell Jar Over Rotary Switch
Figure 6-44. Apply Thin Bead of Vacuum Grease
Figure 6-45. Install Bell Jar Guard
Figure 6-46. Facility Air Supply
Figure 6-47. Air Isolation and Armature Support Controls
Figure 6-48. RS Adapter Mounted to L Fixture
Figure 6-49. Rotary Switch Orientation 1
Figure 6-50. Chamber Access Hole
Figure 6-51. Rotary Switch Orientation 1 Cable Connections
Figure 6-52. Accelerometer Placement
Figure 6-53. Accelerometer Cable Routing
Figure 6-54. Close Chamber Door
Figure 6-55. Accelerometer Breakout Box
Figure 6-56. Shaker Controller Main Power Switch
Figure 6-57. Controller Desktop
Figure 6-58. Mode Key Switch
Figure 6-59. Chamber Touch Screen Activated
Figure 6-60. Rotary Switch Orientation 2
Figure 6-61. Accelerometer Placement
Figure 6-62. Close Chamber Door
Figure 6-63. RS Orientation 3 Cable Connections
Figure 6-64. Accelerometer Placement
Figure 6-65. Close Chamber Door
Figure 10-1. WAD A&S Unique Test Flow (Less He Leak Test)
Figure 10-2. WAD He Leak Test Flow
Figure 10-3. WAD Basic Functional Test Flow
Figure 10-4. WAD Environmental Test Flow
Figure 10-5. WAD A&S Extended Functional Test Flow
Figure 10-6. Impact Sensor A&S Static Test Flow
Figure 10-7. Impact Sensor A&S Dynamic Test Flow
Figure 10-8. Rotary Switch A&S Test Flow
Figure 10-9. A&S Test Top Level Flow Diagram
Figure 12-1. Power Switch
Figure 12-2. Optical Reader
Figure 12-3. Optical Reader I/O Cable
Figure 12-4. Card Cage BNC (Optical Reader Output Signal)
Figure 12-5. Test Set Up
1 Safety Summary
1.1 General WARNINGS
DO NOT operate the MTS-8 in an explosive atmosphere or in the presence of flammable gases or fumes.
DO NOT remove covers and/or shields with power applied.
DO NOT operate damaged equipment.
DO NOT attempt internal service or adjustments alone.
DO NOT substitute parts or modify equipment without cognizant engineering and safety office approval.
1.2 High Potential Test WARNINGS
The HYPOT generates voltages and currents that can cause harmful or fatal electric shock and must be operated by a skilled worker, trained in its use.
Operators should not wear jewelry that could complete a circuit path.
Personnel with heart ailments or devices such as pacemakers should not operate this test station.
Safety devices on the MTS-8 and the associated A&S environmental test chambers and equipment include both software and hardware interlocks to prevent operators from contacting high voltage. The safety interlocks MUST NOT be defeated. Any deviation to this requirement could cause harmful or fatal shock.
2 Ancillary Test and Handling Equipment
2.1 Ancillary Test Equipment
In order to develop the ALCM A&S tests various test components were either developed or acquired. Those components are identified in the following paragraphs.
ALCM Impact Sensors
Part number 76965-3, serial numbers 347, 523, 661, and 1369
These four impact sensors were set aside for use as part of an age sensitivity item analysis (ASIA). They are not A&S test assets.
ALCM Warhead Arming Device (WAD)
Part number 76560-5, serial numbers 265, 348, 368, and 786.
WADs 265, 348, 368, and 786 were set aside for use as part of an age sensitivity item analysis
ALCM Rotary Switch
Part number 76410-4, serial numbers 90, 413, 1025, and 1276
These four rotary switches were set aside for use as part of an age sensitivity item analysis
Accelerometer Simulator, Endevco Model 4830A
The accelerometer simulator is a battery-operated instrument that is used to electronically simulate a variety of outputs from various types of transducers. It has a menu driven LCD display to establish the appropriate settings.
Accelerometer, Endevco Model 2221D
This accelerometer is used during impact sensor testing to monitor impact switch impact and is designed specifically for vibration measurement on small structures and objects.
Accelerometer, Endevco Model 6251-10
This accelerometer is used during Warhead Arming Device and Rotary Switch testing to control and monitor vibration and is designed specifically for vibration measurement on small structures and objects. The accelerometer has a temperature operating range of –67 F0 to 257 F0.
Programmable Filter, Endevco Model 35771
This is a plug-in filter designed for use in the Endevco Model 2775B signal conditioner.
Accelerometer Cable, Endevco Model 3090C-240
This cable is a high reliability, low-noise softline coaxial cable. It is a premium general purpose cable designed specifically for use with piezoelectric accelerometers in severe environments.
10-32 Female to BNC Male Adapter
This adapter is used during the impact test alignment check to adapt the 3090C-240 cable, which has a 10-32 coax male plug, to one of the female BNC connectors on the Model 4830A Accelerometer Simulator.
Accelerometer Simulator Model 4830A
The ENDEVCO® Model 4830A is a battery operated instrument that is used to electronically simulate a variety of outputs from various types of transducers. A tachometer output signal is also provided, making the Model 4830A a convenient and portable means of calibrating and servicing instrumentation.
The Model 4830A uses a menu-driven 80-character LCD display to establish the appropriate settings. The key panel contains only four sealed switches (per IP65) marked with arrows for cursor control. In addition to the manual on/off switch, the unit can be set for automatic power shutdown. The last setup is automatically stored in nonvolatile memory. Power is supplied by internally mounted NiCad rechargeable batteries, which can be recharged with a regulated 9 Vdc source.
Output signals available include single-ended and differential charge (pC), single-ended voltage (mV), current-sinking ISOTRON® and a tachometer (TTL) output signal. The frequency range is 1 to 10 000 Hz and the output amplitude is adjustable up to 10 000 pC or mV pk. Outputs can be provided in acceleration, velocity or displacement.
2.2 Ancillary Handling Fixtures and Test Fixtures
Table 2-1. Handling Fixtures and Test Fixtures
Item Nomenclature Part Number Manufacturer Quantity
1 Warhead Arming Device Vibration Fixture 03-1249-0250 E-Spectrum 1 2 Rotary Switch Vibration Fixture 03-1249-0550 E-Spectrum 1 3 Rotary Switch Timing Test Fixture 03-1249-0710 E-Spectrum 1 4 Rotary Switch Force Displacement Test Fixture 03-1249-0800 E-Spectrum 1 5 Shock Test Machine Holding Fixture 03-1162-0950 E-Spectrum 1 6 Furnace Mag 20 Layman 1
Figure 2-1. Warhead Arming Device Vibration Fixture
Figure 2-2. Rotary Switch Vibration Fixture
Figure 2-3. Rotary Switch Timing Test Fixture
Figure 2-4. Rotary Switch Force Displacement Test Fixture
Figure 2-5. Shock Test Machine Holding Fixture
Figure 2-6. Furnace
2.3 Consumables
Table 2-2. Consumables
Item Nomenclature Purpose Source Part Number
1 Potting Compound Securing WAD & RS vacuum port screws Elsworth Adhesive EE-4215 Base
HD-3561 Catalyst
2 Insulating Washer for Endevco Accelerometer (Top)
Isolate accelerometer from metal surface Thermotron 1239911
3 Insulating Washer for Endevco Accelerometer (Bottom)
Isolate accelerometer from metal surface Thermotron 1239929
4 High Vacuum Grease Used on bell jar vacuum seal / test port washer seal DOW Corning #976V
5 Nitrogen Used during leak test Local Supply 95% Ni / 5% He
6 Vacuum Pump Oil Vacuum pump lubricant Varian 695409005
7 Epoxy, Polyamide Primer Priming metal surfaces 81349 MIL-P-24441/28 Type I, Class 2
8 Aliphatic Polyurethane Color No. 16187 or 16251 Painting metal surfaces 81349 MIL-C-85285
9 Wash Primer Paint touchup 81349 MIL-C-8514
10 Isopropyl Alcohol To clean leak port washer Local Purchase NA
11 Vacuum Port Washer Seal WAD leak test adapter McMaster Carr 93783A009
3 Major Equipment Items Various test and storage chambers have been acquired to meet the environmental requirements of both the test configurations and the storage configurations. These major equipment items are identified in the following paragraphs. All of this equipment is maintained as Government Furnished Equipment under an asset storage contract.
Thermotron Temperature/Humidity Controlled Chamber. The Thermotron temperature/humidity chamber (Model Number SM-8C) is integral to the overall A&S program. Dedicated Impact Sensor and Warhead Arming Device test assets are stored in the chamber under temperature and humidity conditions representative of “field conditions” as directed by the Program Management Plan. This chamber was purchased in early CY 2000.
Cincinnati Sub-Zero MicroClimate Series Temperature/Humidity Controlled Chamber. The Cincinnati Sub-Zero MicroClimate temperature/humidity chamber (Model Number MCBHS- 1.2-.33-.33-H/AC) is integral to the overall A&S program. Dedicated test assets are stored in the chamber under temperature and humidity conditions representative of “field conditions” as directed by the Program Management Plan.
Cincinnati Sub-Zero ZP-Series Temperature/Humidity Controlled Chamber. The Cincinnati Sub-Zero ZP temperature/humidity chamber (Model Number ZPHS-32-2-2-H/AC) is integral to the overall A&S program. Dedicated test assets are stored in the chamber under temperature and humidity conditions representative of “field conditions” as directed by the Program Management Plan. This chamber was purchased in late CY 2004.
Thermotron AGREE style Temperature Chamber/Vibration Table. This combination system (Chamber Model Number F-12-CHV-5-5 and Shaker Model Number DS-2000-911-12M) allows simultaneous application of vibration and thermal environments while the Warhead Arming Device (WAD) or Rotary Switch is subjected to tests. The MTS-8 is used for signal stimulus application and data acquisition and analysis for both the warhead arming device and rotary switch tests.
Varian Model 979 Series Helium Mass Spectrometer Leak Detector. The Model 979 Helium Leak Detector is the heart of this test system. Other components include a Varian Vacuum Pump (DS 302VAC, Model 949-9325), a custom automated pneumatic control system, and a specially designed and precision-machined stainless steel work platform that allows for adequate vacuum sealing between the work surface and a bell jar. The leak detector system is used to conduct the o-ring seal tests on the WAD. The MTS-8 has been configured with an Interface Test Adapter (ITA) to allow automated control of the leak detector system and to conduct data acquisition and analysis.
Dillon Quantrol TC2 (Tension-Compression-Cyclic) Force Measurement System (TC2-FMS).
The TC2-FMS includes a Mecmesin Advance Force Gauge (AFG 500N) that provides accurate measurements of force and displacement. The system is ideal for use in gathering displacement data specified in the ALCM A&S Rotary Switch Test Requirements Document. The TC2-FMS has been augmented with a Rotary Switch Force Displacement Test Fixture to satisfy positioning and alignment requirements for the device under test. The MTS-8 utilizes the ACM Separation Switch Interface Test Adapter (ITA) to allow automated control of the TC2-FMS and to conduct data acquisition and analysis.
Avex Shock Machine. This shock machine (Model 105-MP) provides a means of applying G forces to Impact Sensors to validate switch opening versus G-level applied. An adapter plate with attached storage containers is mounted on the machine to accommodate testing of one of the three sensors at any one time. The MTS-8 has been configured with an Interface Test Adapter (ITA) to allow automated control of the shock machine and to conduct data acquisition and analysis.
4 Test Station Description
4.1 Hardware
MTS-8 Test Station. The MTS-8 is an analog/digital automatic test station that provides a wide range of test capability. The original specifications for the MTS-8 included sufficient capacity to meet the Aging & Surveillance electrical stimulus application and data acquisition test requirements for the ALCM Impact Sensor Assembly, Warhead Arming Device, and Rotary Switch. Further, all electrical production/acceptance test requirements for the WAD can be met with the MTS-8.
A complete set of engineering drawings has been created to provide long-term supportability.
Section 10 of this document includes a drawing tree for the ALCM A&S Test Complex. The following figure depicts the MTS-8 and in its current configuration.
Figure 4-1. MTS-8 Test Station and Station Control PC
Station Control PC. The control PC is external to the instrumentation rack. It includes a 3 GHz Intel processor, 1 GB DDR memory operating at 400MHZ, a 17-inch LCD monitor, a Sony IDE DVD/CDRW, a 3½-inch floppy drive, an 80 GB internal hard drive, a 250 MB zip drive, and 80 GB external USB drive, 5 serial ports, and a standard keyboard and mouse. Figure 4-2 shows the
I/O connections between the controller, the MTS8 main frame test set, and other various other ALCM A&S Test Complex components.
Figure 4-2. Controller (Rear View) and ALCM A&S Test Complex I/O
4.2 Interface Test Adapters.
Various interface test adapters (ITAs) have been designed and developed in support of the ALCM A&S Program (see Table 4-1). The ITAs are described in the following paragraphs.
MTS8 Self-Test ITA. A self-test ITA is provided to allow for a comprehensive internal test of the MTS-8. During the self-test, each instrument with a built-in-test (BIT) is commanded to perform that BIT. The results are displayed on the PC controller. The switching matrix in the test station is functioned to verify that all relays and circuit paths are intact and operational.
Nomenclature # PN Figure Remarks
MTS8 Self Test ITA None 03-1039-0100 4-3
Impact Sensor ITA 1 03-1039-0200 4-4 Static Test
Impact Sensor ITA 2 03-1162-0900 4-5 Dynamic Test
Rotary Switch Assembly ITA 1 03-1249-0500 4-6 & 4-7 Interface Chassis & Load Box
Rotary Switch ITA 2 03-1249-0700 5-8
Rotary Switch ITA 3 03-1249-0800 4-9
Warhead Arming Device Assembly ITA 1 03-1039-0300 4-10 & 4-11 Interface Chassis & Load Box
Warhead Arming Device ITA 2 03-1162-0400 4-12
Table 4-1. Interface Test Adapters
(Not Used)
Front and back views of the MTS8 self-test ITA are shown in figure 4-3.
Front Rear
Figure 4-3. MTS8 Self-Test ITA, 03-1039-0100 Air Launched Cruise Missile Impact Sensor Static Test ITA#1. The ALCM Impact Sensor Static Test ITA #1, PN 03-1039-0200, includes a Virginia panel interface mounted at the rear of the ITA along with a hinged door on the front that provides access to mount the Impact Sensors internally to protect the operators from high voltages and currents that are present during the test sequence. Two safety features have been designed into the ITA to ensure operator safety during High Potential testing. First, the ITA lid must be closed to satisfy a switch activated interlock.
And secondly, the hardware interlock pins are monitored at the Virginia Panel interface in the test software to verify the lid is closed prior to continuation of the test. The following figures depict the rear and front views of the ITA respectively.
Figure 4-4. Impact Sensor ITA #1, 03-1039-0200 (Static Test) Air Launched Cruise Missile Impact Sensor Dynamic Test ITA#2. The ALCM Impact Sensor Dynamic Test ITA #2, PN 03-1162-0900, includes a Virginia panel interface mounted at the rear of the ITA along with a hinged door on the front panel where shorting connectors are mounted for use in loop back testing of the ITA to Impact Sensor interface cable. The interface cable mates at J1 on the ITA and is then routed to the Avex Shock Machine for automated control of the machine and to the Impact Sensor to monitor switch activation circuitry and measure circuit path resistances. The following figure depicts the ITA.
Figure 4-5. Impact Sensor ITA #2, 03-1162-0900 (Dynamic Test)
Air Launched Cruise Missile Rotary Switch ITA Assembly #1. ALCM Rotary Switch ITA Assembly #1, PN 03-1249-0500, includes a Virginia panel interface mounted at the rear of the ITA. The interface chassis mounts to the MTS-8 and includes interface cables and surface mount loop-back connectors for the ITA self-test function. Figure 4-6 depicts the load box with the lid closed and a front view of the ITA. Figure 4-7 shows the load box with the lid open.
Load Box Interface Chassis
Figure 4-6. Rotary Switch ITA Assembly #1, 03-1249-0500 (Loadbox / Interface Chassis)
Figure 4-7. Rotary Switch ITA Assembly #1 Loadbox (Internal View)
Air Launched Cruise Missile Rotary Switch ITA #2. ALCM Rotary Switch ITA #2, PN 03- 1249-0700, includes a Virginia panel interface mounted at the rear of the ITA.
Figure 4-8. Rotary Switch ITA #2, 03-1249-0700
Air Launch Cruise Missile Rotary Switch ITA #3. ALCM Rotary Switch ITA #3, PN 03-1249- 0800, includes a Virginia panel interface mounted at the rear of the ITA along with a hinged door on the front that use to provides access to internal wiring. The following figure depicts the front view of the ITA. ITA cables enable the MTS8 Test Set to communicate with the Dillon Quantrol TC2 (Tension-Compression-Cyclic) Force Measurement System during Rotary Switch detent pin insertion/extraction testing.
Figure 4-9. Rotary Switch ITA #3, PN 03-1249-0800
Air Launched Cruise Missile Warhead Arming Device ITA #1. ALCM WAD ITA #1, PN 03- 1039-0300, includes a loadbox along with a typical Virginia panel interface chassis and interconnect cables. WAD ITA #1 is used in conjunction with the MTS-8 to perform the WAD Basic Functional Test, Environmental Tests and the WAD Extended Functional Test. The interface chassis mounts to the MTS-8 and is interconnected with the loadbox during self-test of the ITA or the WAD during testing. Similarly the loadbox includes an external cable leg that mates to the interface chassis for self-test and is connected and disconnected from the chassis during WAD testing as directed during the test sequence. The following figure shows external views of the two WAD ITA #1 assemblies.
Load Box Interface Chassis
Figure 4-10. Warhead Arming Device ITA Assembly #1 (Loadbox / Chassis), 03-1039-0300 The following figure shows internal views of the Load Box.
Figure 4-11. Warhead Arming Device ITA #1 Loadbox (Internal Views)
Air Launched Cruise Missile Warhead Arming Device ITA #2. ALCM WAD ITA #2, PN 03- 1162-0400, is a typical Virginia panel interface chassis and interconnect cables. WAD ITA #2 is used in conjunction with the MTS-8 to perform the WAD and Rotary Switch A&S Unique Tests as well as the WAD and Rotary Switch Helium Leak Test. The interface chassis mounts to the MTS-8 and includes WAD interface cables and surface mount loop-back connectors for the ITA self-test function. The following figure shows an external view of WAD ITA #2.
Figure 4-12. Warhead Arming Device ITA #2, 03-1162-0400
4.3 Instrumentation Rack.
The rack contains common COTS instrumentation as well as some custom hardware. Two National Instrument PXI-1000B Chassis’s are daisy chained within the MTS-8 to provide sufficient capacity to meet the test requirements and data acquisition needs. The following paragraphs describe the various Tester Replaceable Units.
4.3.1 Digital Multi-Meter
As shown in the following figure, this is a standard commercial off the shelf HP 3458A Digital Multi-Meter.
Figure 4-13. HP 3458A DMM
4.3.2 Oscilloscope
The scope is a standard commercial off the shelf TEK TDS 420A Oscilloscope. Option bundle TDS420AXL was also included to allow data sampling at a higher resolution. The bundle includes the 120K extended record length that is necessary to obtain the high resolution.
Combined the standard scope and option bundle are advertised as model number TDS
420A_00XL.
Figure 4-14. Tektronix TDS 420A Oscilloscope
4.3.3 Milliohmmeter
This is a standard commercial off the shelf HP 4338B Milliohmmeter.
Figure 4-15. HP 4338B Milliohmmeter
4.3.4 Impact Sensor Accelerometer Signal Conditioner
This is a standard off the shelf Endevco 2775B Signal Conditioner. An optional Endevco Model 35771 Programmable Filter is included. This is a plug-in filter designed for use in the Endevco Model 2775B signal conditioner as a high pass, low pass or band pass filter. The plug-in filter is configured in a low pass mode for use in the MTS-8. Selectable jumpers are set as follows:
CARRIER JUMPER SETTING
a. LP/BP/HP LP
b. 1 kHz/2 kHz/5 kHz/10 kHz 2 kHz
c. CUST/10 Hz/2 Hz/SP 2 Hz
d. CUST/100 Hz/200 Hz/500 Hz No Jumper
Figure 4-16. Endevco 2775B Signal Conditioner
4.3.5 HYPOT
The HYPOT instrumentation includes the basic 7550DT Dielectric Analyzer along with the HS- 8A Matrix Scanner. The Scanner increases signal channel capability from the basic 8 channels to 16.
Figure 4-17. HYPOT 7550DT
4.3.6 AC Power Distribution Box
This is a custom designed power control box that implements a ground fault interrupt, provides emergency shut off capabilities for all AC power within the MTS-8, and filters the input power to the test station. The box also includes a 24-volt DC power supply. This DC supply powers the contactors in the box, the display lamps on the box, and the Green lamp indicator in the PUSH ON push button located on the MTS-8 front panel. The following figures show the rear view and internal view of the box along with a front panel view of the Enable and Emergency stop switches for the box.
Figure 4-18. AC Distribution Box Rear View
Figure 4-19. AC Distribution Box Internal View
Figure 4-20. AC Box Enable and Emergency Stop Switch
4.3.7 Power Supplies
Three power supplies have been incorporated to satisfy the various test requirements. Two are used in the WAD test, as the 0-35 Volt/0-4.5A DC Modular Supply is necessary to function the WAD relays and the 0-35Volt/15A DC Power Supply provides main bus power. The Agilent 66103A and 66104A dc power supplies are housed in a 66000A Modular Power Supply Mainframe while the 6653A dc power supply (0-35V/15A) is a typical rack mount unit. All three power supplies are controlled via the GPIB.
66103A 0-35 Volt/0-4.5A DC Power Module
66104A 0-60 Volt/0-2.5A DC Power Module
6653A 0-35 Volt, 15A DC Power Supply
Figure 4-21. DC Power Supplies
4.4 Software
The executable ALCM A&S Program software was developed using LabView. A single executable program contains all of the sub-routines required to self-test the test station, self-test the Rotary Switch and WAD ITAs, test the WAD, Rotary Switch and Impact Sensors (except G-testing), acquire the data and archive the results.
Version Description. The ALCM A&S Test Program (ALCM A&S.exe, dtd x/x/xx, x.x MB) was originally released on xx Month 2009. It currently consists of the support files listed in Table 4-1 that are required for the executable program to run properly.
Table 4-2. Test Program Support Files (Sheet 1 of 5)
Name Directory Size Date daqdrv E:\ALCM A&S\Executable 5 KB 8/26/1998
A&S impact sensor selftest E:\ALCM A&S\Impact Sensor\Scripts 86 KB 11/7/2005
ALCMresistancea&s.dss E:\ALCM A&S\Impact Sensor\Scripts 2 KB 4/1/2005
ALCMselftestg110a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 7 KB 11/4/2005
ALCMselftestg220a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 6 KB 11/4/2005
ALCMsw1g110a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 7 KB 11/4/2005
ALCMsw1g220a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 19 KB 11/4/2005
ALCMsw2g110a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 7 KB 11/4/2005
ALCMsw2g220a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 19 KB 11/4/2005
ALCMsw3g110a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 7 KB 11/4/2005
ALCMsw3g220a&s.dss E:\ALCM A&S\Impact Sensor\Scripts 19 KB 11/4/2005
Cycle Test.dss E:\ALCM A&S\Impact Sensor\Scripts 8 KB 11/4/05
Impact Sensor A&S.dss E:\ALCM A&S\Impact Sensor\Scripts 21 KB 11/22/2002
Impact Sensor ITA.dss E:\ALCM A&S\Impact Sensor\Scripts 18 KB 11/20/2001
Impact Sensor ITA2.dss E:\ALCM A&S\Impact Sensor\Scripts 6 KB 3/30/2005
Scalign.dss E:\ALCM A&S\Impact Sensor\Scripts 3 KB 11/8/2005
Figure 1.jpg E:\ALCM A&S\Impact Sensor\Images 16 KB 11/15/2001
Figure 2.jpg E:\ALCM A&S\Impact Sensor\Images 17 KB 11/15/2001
Figure 3.jpg E:\ALCM A&S\Impact Sensor\Images 17 KB 11/15/2001
Figure 4.jpg E:\ALCM A&S\Impact Sensor\Images 16 KB 11/15/2001
Figure 5.jpg E:\ALCM A&S\Impact Sensor\Images 17 KB 11/15/2001
Figure 6.jpg E:\ALCM A&S\Impact Sensor\Images 18 KB 11/15/2001
Figure 7.jpg E:\ALCM A&S\Impact Sensor\Images 15 KB 11/15/2001
Figure 8.jpg E:\ALCM A&S\Impact Sensor\Images 14 KB 11/15/2001
Figure 9.jpg E:\ALCM A&S\Impact Sensor\Images 16 KB 11/20/2001
Figure 10.jpg E:\ALCM A&S\Impact Sensor\Images 15 KB 11/20/2001
Figure 11.jpg E:\ALCM A&S\Impact Sensor\Images 15 KB 11/20/2001
Figure15.jpg E:\ALCM A&S\Impact Sensor\Images 11 KB 3/30/2005
Figure16.jpg E:\ALCM A&S\Impact Sensor\Images 11 KB 3/30/2005
Figure17.jpg E:\ALCM A&S\Impact Sensor\Images 12 KB 3/30/2005
Figure18.jpg E:\ALCM A&S\Impact Sensor\Images 11 KB 3/30/2005
Figure19.jpg E:\ALCM A&S\Impact Sensor\Images 11 KB 3/30/2005
Figure20.jpg E:\ALCM A&S\Impact Sensor\Images 8 KB 3/30/2005
Figure21.jpg E:\ALCM A&S\Impact Sensor\Images 12 KB 3/30/2005
Figure22.jpg E:\ALCM A&S\Impact Sensor\Images 7 KB 3/30/2005
Figure23.jpg E:\ALCM A&S\Impact Sensor\Images 9 KB 3/30/2005
Figure24.jpg E:\ALCM A&S\Impact Sensor\Images 12 KB 3/30/2005
Figure25.jpg E:\ALCM A&S\Impact Sensor\Images 9 KB 3/30/2005
Figure26.jpg E:\ALCM A&S\Impact Sensor\Images 10 KB 3/30/2005
Figure27.jpg E:\ALCM A&S\Impact Sensor\Images 12 KB 3/30/2005
Figure28.jpg E:\ALCM A&S\Impact Sensor\Images 12 KB 3/30/2005
Figure29.jpg E:\ALCM A&S\Impact Sensor\Images 12 KB 3/30/2005
Table 4-2. Test Program Support Files
(Sheet 2 of 5) Name Directory Size Date
Figure30.jpg E:\ALCM A&S\Impact Sensor\Images 12 KB 3/30/2005
Figure31.jpg E:\ALCM A&S\Impact Sensor\Images 9 KB 3/30/2005
Figure32.jpg E:\ALCM A&S\Impact Sensor\Images 10 KB 3/30/2005
Figure33.jpg E:\ALCM A&S\Impact Sensor\Images 10 KB 3/30/2005
Figure34.jpg E:\ALCM A&S\Impact Sensor\Images 9 KB 7/12/2005
Figure35.jpg E:\ALCM A&S\Impact Sensor\Images 17 KB 10/24/2005
Figure36.jpg E:\ALCM A&S\Impact Sensor\Images 20 KB 10/24/2005
Figure37.jpg E:\ALCM A&S\Impact Sensor\Images 25 KB 10/24/2005
Figure38.jpg E:\ALCM A&S\Impact Sensor\Images 25 KB 10/24/2005 selfita1.jpg E:\ALCM A&S\Impact Sensor\Images 6 KB 11/8/2001 selfita2.jpg E:\ALCM A&S\Impact Sensor\Images 10 KB 11/8/2001 selfita3.jpg E:\ALCM A&S\Impact Sensor\Images 13 KB 11/8/2001 selfita4.jpg E:\ALCM A&S\Impact Sensor\Images 14 KB 11/8/2001 selfita5.jpg E:\ALCM A&S\Impact Sensor\Images 15 KB 11/8/2001
A&S Armdisarm selftest good.dss E:\ALCM A&S\Armdisarm\Scripts 86 KB 11/30/2005
A&S Armdisarm selftest E:\ALCM A&S\Armdisarm\Scripts 86 KB 11/30/2005
Armdisarm A&S Unique.dss E:\ALCM A&S\Armdisarm\Scripts 40 KB 11/15/2005
Armdisarm A&S.dss E:\ALCM A&S\Armdisarm\Scripts 91 KB 11/17/2005
Armdisarm Basic Env TEST VIB.dss E:\ALCM A&S\Armdisarm\Scripts 201 11/16/2005
Armdisarm Basic Env.dss E:\ALCM A&S\Armdisarm\Scripts 202 KB 11/28/2005
Armdisarm Basic Env2.dss E:\ALCM A&S\Armdisarm\Scripts 201 11/16/2005
Armdisarm Basic.dss E:\ALCM A&S\Armdisarm\Scripts 96 KB 11/7/2005
Armdisarm ITA #2.dss E:\ALCM A&S\Armdisarm\Scripts 6 KB 11/15/2005
Armdisarm ITA.dss E:\ALCM A&S\Armdisarm\Scripts 20 KB 11/15/2005
Helium Leak Test.dss E:\ALCM A&S\Armdisarm\Scripts 20 KB 11/23/2005
WAD Test.dss E:\ALCM A&S\Armdisarm\Scripts 91 KB 6/15/2004
ApplyVacGrease.jpg E:\ALCM A&S\Armdisarm\Images 13 KB 10/15/2004
BellJar.jpg E:\ALCM A&S\Armdisarm\Images 12 KB 10/15/2004
BellJarGasket.jpg E:\ALCM A&S\Armdisarm\Images 14 KB 10/13/2004
BellJarGuard.jpg E:\ALCM A&S\Armdisarm\Images 17 KB 10/13/2004
BellJarWithGuard.jpg E:\ALCM A&S\Armdisarm\Images 10 KB 10/20/2004
Cable_Connectors.jpg E:\ALCM A&S\Armdisarm\Images 20 KB 10/20/2004
CleanBasePlate.jpg E:\ALCM A&S\Armdisarm\Images 14 KB 10/15/2004
CleanBellJarBase.jpg E:\ALCM A&S\Armdisarm\Images 12 KB 10/18/2004
CleanPort.jpg E:\ALCM A&S\Armdisarm\Images 19 KB 10/18/2004
CleanScrew.jpg E:\ALCM A&S\Armdisarm\Images 18 KB 10/18/2004
ConnectJ4.jpg E:\ALCM A&S\Armdisarm\Images 8 KB 10/15/2004
Figure 8.jpg E:\ALCM A&S\Armdisarm\Images 14 KB 11/15/2001
Figure61.jpg E:\ALCM A&S\Armdisarm\Images 8 KB 5/13/2005
Figure62.jpg E:\ALCM A&S\Armdisarm\Images 5 KB 5/13/2005
Figure63.jpg E:\ALCM A&S\Armdisarm\Images 10 KB 5/13/2005
(Sheet 3 of 5)
Name Directory Size Date
Figure64.jpg E:\ALCM A&S\Armdisarm\Images 5 KB 5/13/2005
Figure65.jpg E:\ALCM A&S\Armdisarm\Images 10 KB 5/13/2005
Figure66.JPG E:\ALCM A&S\Armdisarm\Images 8 KB 5/13/2005
Figure80.jpg E:\ALCM A&S\Armdisarm\Images 28 KB 8/29/2005
Figure81.jpg E:\ALCM A&S\Armdisarm\Images 22 KB 8/29/2005
Figure82.jpg E:\ALCM A&S\Armdisarm\Images 14 KB 8/29/2005
Figure83.jpg E:\ALCM A&S\Armdisarm\Images 15 KB 8/29/2005
Figure84.jpg E:\ALCM A&S\Armdisarm\Images 17 KB 8/29/2005
Figure85.jpg E:\ALCM A&S\Armdisarm\Images 32 KB 8/29/2005
Figure86.jpg E:\ALCM A&S\Armdisarm\Images 20 KB 8/29/2005
Figure87.jpg E:\ALCM A&S\Armdisarm\Images 32 KB 8/29/2005
Figure88.jpg E:\ALCM A&S\Armdisarm\Images 18 KB 8/29/2005
Figure89.jpg E:\ALCM A&S\Armdisarm\Images 29 KB 8/29/2005
Figure90.jpg E:\ALCM A&S\Armdisarm\Images 28 KB 8/29/2005
Figure91.jpg E:\ALCM A&S\Armdisarm\Images 29 KB 8/29/2005
Figure92.jpg E:\ALCM A&S\Armdisarm\Images 32 KB 8/29/2005
Figure93.jpg E:\ALCM A&S\Armdisarm\Images 28 KB 8/29/2005
Figure94.jpg E:\ALCM A&S\Armdisarm\Images 25 KB 8/29/2005
Figure95.jpg E:\ALCM A&S\Armdisarm\Images 15 KB 8/29/2005
Figure96.jpg E:\ALCM A&S\Armdisarm\Images 24 KB 8/29/2005
Figure97.jpg E:\ALCM A&S\Armdisarm\Images 25 KB 8/29/2005
Figure98.jpg E:\ALCM A&S\Armdisarm\Images 24 KB 8/29/2005
HeLeakTestITA.jpg E:\ALCM A&S\Armdisarm\Images 18 KB 10/15/2004
Image1.jpg E:\ALCM A&S\Armdisarm\Images 20 KB 1/29/2003
Image10.jpg E:\ALCM A&S\Armdisarm\Images 22 KB 1/29/2003
Image11.jpg E:\ALCM A&S\Armdisarm\Images 13 KB 1/29/2003
Image12.jpg E:\ALCM A&S\Armdisarm\Images 13 KB 1/29/2003
Image13.jpg E:\ALCM A&S\Armdisarm\Images 14 KB 1/29/2003
Image2.jpg E:\ALCM A&S\Armdisarm\Images 16 KB 1/29/2003
Image3.jpg E:\ALCM A&S\Armdisarm\Images 17 KB 1/29/2003
Image4.jpg E:\ALCM A&S\Armdisarm\Images 14 KB 1/29/2003
Image5.jpg E:\ALCM A&S\Armdisarm\Images 14 KB 1/29/2003
Image6.jpg E:\ALCM A&S\Armdisarm\Images 15 KB 1/29/2003
Image7.jpg E:\ALCM A&S\Armdisarm\Images 16 KB 1/29/2003
Image8.jpg E:\ALCM A&S\Armdisarm\Images 17 KB 1/29/2003
Image9.jpg E:\ALCM A&S\Armdisarm\Images 16 KB 1/29/2003
Install_Cables_on_ITA.jpg E:\ALCM A&S\Armdisarm\Images 19 KB 10/20/2004
Install_ITA.jpg E:\ALCM A&S\Armdisarm\Images 20 KB 10/20/2004
Pad.JPG E:\ALCM A&S\Armdisarm\Images 9 KB 10/13/2004
ReinstallEndCap.jpg E:\ALCM A&S\Armdisarm\Images 15 KB 10/18/2004
RemoveDustCaps.jpg E:\ALCM A&S\Armdisarm\Images 13 KB 10/18/2004
RemoveEndCap.JPG E:\ALCM A&S\Armdisarm\Images 11 KB 10/20/2004
RemoveScrew.jpg E:\ALCM A&S\Armdisarm\Images 10 KB 10/13/2004
(Sheet 4 of 5) Name Directory Size Date
Name Directory Size Date
Sverify.jpg E:\ALCM A&S\Armdisarm\Images 16 KB 10/13/2004
TestAdapterInstalledInA.. E:\ALCM A&S\Armdisarm\Images 14 KB 10/15/2004
TorqueFittingToAdapter... E:\ALCM A&S\Armdisarm\Images 20 KB 10/15/2004 uutadapter.jpg E:\ALCM A&S\Armdisarm\Images 17 KB 10/19/2004
UUTConnected.JPG E:\ALCM A&S\Armdisarm\Images 11 KB 10/13/2004
UUTonStand.jpg E:\ALCM A&S\Armdisarm\Images 13 KB 10/15/2004
Washer.jpg E:\ALCM A&S\Armdisarm\Images 10 KB 10/18/2004
A&S sep switch selftest.dss E:\ALCM A&S\Sep Switch\Scripts 86 KB 11/7/2005
Sep Switch A&S.dss E:\ALCM A&S\Sep Switch\Scripts 39 KB 11/8/2005
Sep Switch ITA bkp.dss.txt E:\ALCM A&S\Sep Switch\Scripts 22 KB 1/26/2005
Sep Switch ITA.dss E:\ALCM A&S\Sep Switch\Scripts 22 KB 6/16/2005 figure 1.jpg E:\ALCM A&S\Sep Switch\Images 9 KB 1/18/2005 figure 10.jpg E:\ALCM A&S\Sep Switch\Images 15 KB 1/18/2005 figure 11.jpg E:\ALCM A&S\Sep Switch\Images 13 KB 1/18/2005 figure 12.jpg E:\ALCM A&S\Sep Switch\Images 12 KB 1/18/2005 figure 13.jpg E:\ALCM A&S\Sep Switch\Images 12 KB 1/18/2005 figure 14.jpg E:\ALCM A&S\Sep Switch\Images 10 KB 1/19/2005 figure 15.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/19/2005 figure 16.jpg E:\ALCM A&S\Sep Switch\Images 12 KB 1/19/2005 figure 17.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/19/2005 figure 18.jpg E:\ALCM A&S\Sep Switch\Images 12 KB 1/19/2005 figure 19.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/19/2005 figure 2.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/18/2005 figure 20.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/25/2005 figure 21.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/25/2005 figure 22.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/25/2005 figure 23.jpg E:\ALCM A&S\Sep Switch\Images 12 KB 1/25/2005 figure 24.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/25/2005 figure 25.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/25/2005 figure 26.jpg E:\ALCM A&S\Sep Switch\Images 10 KB 1/25/2005 figure 27.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/25/2005 figure 28.jpg E:\ALCM A&S\Sep Switch\Images 9 KB 1/25/2005 figure 3.jpg E:\ALCM A&S\Sep Switch\Images 10 KB 1/18/2005 figure 4.jpg E:\ALCM A&S\Sep Switch\Images 10 KB 1/18/2005 figure 5.jpg E:\ALCM A&S\Sep Switch\Images 11 KB 1/18/2005 figure 6.jpg E:\ALCM A&S\Sep Switch\Images 13 KB 1/18/2005 figure 7.jpg E:\ALCM A&S\Sep Switch\Images 13 KB 1/18/2005 figure 8.jpg * E:\ALCM A&S\Sep Switch\Images 14 KB 11/15/2001 figure 9.jpg E:\ALCM A&S\Sep Switch\Images 14 KB 1/18/2005 selfita1.jpg E:\ALCM A&S\Sep Switch\Images 6 KB 11/8/2001 selfita2.jpg E:\ALCM A&S\Sep Switch\Images 10 KB 11/8/2001 selfita3.jpg E:\ALCM A&S\Sep Switch\Images 13 KB 11/8/2001 selfita4.jpg E:\ALCM A&S\Sep Switch\Images 14 KB 11/8/2001
(Sheet 5 of 5) Name Directory Size Date
Name Directory Size Date selfita5.jpg E:\ALCM A&S\Sep Switch\Images 15 KB 11/8/2001
A&S wh mount selftest.dss E:\ALCM A&S\Warhead Mounts\Scripts 86 KB 11/7/2005
Durometer Selftest.dss E:\ALCM A&S\Warhead Mounts\Scripts 14 KB 11/14/2005
WH Mount A&S.dss E:\ALCM A&S\Warhead Mounts\Scripts 28 KB 11/14/2005
Figure 8.jpg E:\ALCM A&S\Warhead Mounts\Images 14 KB 11/15/2001
Figure39.jpg E:\ALCM A&S\Warhead Mounts\Images 8 KB 5/19/2005
Figure40.jpg E:\ALCM A&S\Warhead Mounts\Images 6 KB 5/17/2005
Figure41.jpg E:\ALCM A&S\Warhead Mounts\Images 6 KB 5/17/2005
Figure42.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/17/2005
Figure43.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/17/2005
Figure44.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/17/2005
Figure45.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/17/2005
Figure46.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/17/2005
Figure47.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/17/2005
Figure48.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/17/2005
Figure50.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/13/2005
Figure51.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/13/2005
Figure52.jpg E:\ALCM A&S\Warhead Mounts\Images 5 KB 5/13/2005
Figure53.jpg E:\ALCM A&S\Warhead Mounts\Images 5 KB 5/13/2005
Figure54.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/13/2005
Figure55.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/13/2005
Figure56.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/13/2005
Figure57.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/13/2005
Figure58.jpg E:\ALCM A&S\Warhead Mounts\Images 11 KB 5/13/2005
Figure59.jpg E:\ALCM A&S\Warhead Mounts\Images 8 KB 5/13/2005
Figure60.jpg E:\ALCM A&S\Warhead Mounts\Images 7 KB 5/13/2005
Figure61.jpg E:\ALCM A&S\Warhead Mounts\Images 8 KB 5/13/2005
Figure62.jpg E:\ALCM A&S\Warhead Mounts\Images 5 KB 5/13/2005
Figure63.jpg E:\ALCM A&S\Warhead Mounts\Images 10 KB 5/13/2005
Figure64.jpg E:\ALCM A&S\Warhead Mounts\Images 5 KB 5/13/2005
Figure65.jpg E:\ALCM A&S\Warhead Mounts\Images 10 KB 5/13/2005
Figure66.jpg E:\ALCM A&S\Warhead Mounts\Images 8 KB 5/13/2005
Figure67.jpg E:\ALCM A&S\Warhead Mounts\Images 22 KB 11/4/2005
Figure68.jpg E:\ALCM A&S\Warhead Mounts\Images 22 KB 11/4/2005
Figure69.jpg E:\ALCM A&S\Warhead Mounts\Images 24 KB 11/4/2005
Figure70.jpg E:\ALCM A&S\Warhead Mounts\Images 22 KB 11/4/2005
Figure71.jpg E:\ALCM A&S\Warhead Mounts\Images 23 KB 11/4/2005
4.4.1 A&S Test Executive
This is the top-level program that is launched from the Windows desktop. The program handles all initialization functions and then displays a date and time verification screen. The operator has the option to exit to Windows to correct any discrepancies or enter the A&S test sequence. Upon entry into the test sequence four test routines are displayed as shown in Figure 4-20.
Figure 4-22. ALCM A&S Tests
The following paragraphs describe the sub-routines available on the various display screens within these three test routines.
4.4.2 Warhead Arming Device Routines
Upon selecting the Warhead Arming Device button, the following screen is displayed.
Figure 4-23. Warhead Arming Device A&S Test
The following paragraphs describe the functionality of the various routines.
Self Tests
1. WAD ITA #1 Self Test selection opens the Operator Notebook Entry panel where the operator enters the associated WAD serial number or the words “self-test” and clicks outside the entry field to activate the CONTINUE button. Selecting the CONTINUE button launches the A&S Test Monitor screen.
NOTE
The test monitor screen (as shown in Figure 4-24) is often referred to throughout these procedures. It provides the operator with INSTRUCTIONS/STATUS updates, displays test results as the test is executed, a means to STOP and EXIT, a PRINT DATA function, and the opportunity to CONTINUE when displayed instructions are completed. Upon exiting the A&S Test Monitor screen all test results and associated header information from the Operator Notebook Entry screen are archived to the PC’s hard drive.
Figure 4-24. A&S Test Monitor Screen
The operator is prompted to install the Warhead Arming Device A&S ITA #1. As the test progresses the operator is prompted to connect and disconnect the ITA to the load simulator as required to check the continuity and isolation of all ITA wiring. When completed, the software returns to the Warhead Arming Device A&S Test screen.
2. ITA #2 Self Test selection opens the Operator Notebook Entry panel where the operator enters the associated WAD serial number or the words “self-test” and clicks outside the entry field to activate the CONTINUE button. Selecting the CONTINUE button launches the A&S Test Monitor screen.
The operator is prompted to install the Warhead Arming Device A&S ITA #2. As the test progresses the operator is prompted to connect and disconnect the ITA cables to ITA chassis mounted connectors as required to check the continuity and isolation of all ITA wiring.
When completed, the software returns to the Warhead Arming Device A&S Test screen.
3. A&S Test Set Self Test opens the Operator Notebook Entry panel where the operator enters the associated WAD serial number or the words “self-test” and clicks outside the entry field to activate the CONTINUE button. Selecting the CONTINUE button launches the A&S Test Set Self Test screen. This screen offers three options. The operator can select either a Complete Self Test, a Single Test Step, or Cancel to return to the Warhead Arming Device A&S Test screen. The Single Test Step mode requires the entry of a test number to activate that selection. Selection of either the Complete Self Test or the Single Test Step launches the A&S Test Monitor screen.
4. DMM AutoCal selection launches the DMM AutoCal screen. A pop-up screen advises the operator that the AutoCal takes 15 minutes to complete and offers the opportunity for the operator to continue or exit. If continued, the AutoCal screen displays the time remaining for Cal completion, and the program cannot be aborted. Upon completion the program returns to the Warhead Arming Device A&S Test screen.
Unique Test
1. Warhead Arming Device A&S Unique Test selection launches the OPERATOR NOTEBOOK ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen, select a Clear All option to reset data, or enter the appropriate data and Continue. Selecting Continue launches the A&S Test Monitor screen. Operator instructions are provided to complete the test.
2. Test Subset by Category launches the A&S SUBTEST ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen or select a Test Subset from a dropdown menu and select Continue. Selecting Continue launches the A&S Test Monitor screen. The test subset selected is executed.
3. Single Test Step Only launches the A&S TEST STEP ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen or enter the desired test step and select Continue. Once selected, the Continue button launches the A&S Test Monitor screen. Only a single test step is executed.
4. Helium Leak Test selection launches the OPERATOR NOTEBOOK ENTRY screen.
The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen, select a Clear All option to reset data, or enter the appropriate data and Continue. Selecting Continue launches the A&S Test Monitor screen. Operator instructions are provided to complete the test.
Basic Functional & Environmental Tests
1. Warhead Arming Device Basic Functional Test selection launches the OPERATOR NOTEBOOK ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen, select a Clear All option to reset data, or enter the appropriate data and Continue. Selecting Continue launches the A&S Test Monitor screen. Operator instructions are provided to complete the test.
2. Warhead Arming Device Environmental Test selection launches the OPERATOR NOTEBOOK ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen, select a Clear All option to reset data, or enter the appropriate data and Continue. Selecting Continue launches the A&S Test Monitor screen. Operator instructions are provided to complete the test.
3. Test Subset by Category launches the A&S SUBTEST ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen or select a Test Subset from a dropdown menu and select Continue. Selecting Continue launches the A&S Test Monitor screen. The test subset selected is executed.
4. Single Test Step Only launches the A&S TEST STEP ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen or enter the desired test step and select Continue. Once selected, the Continue button launches the A&S Test Monitor screen. Only a single test step is executed.
Extended Functional Test
1. Warhead Arming Device Extended Functional Test selection launches the OPERATOR NOTEBOOK ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen, select a Clear All option to reset data, or enter the appropriate data and Continue. If Continue is selected, the A&S Test Monitor screen is launched.
2. Test Subset by Category launches the A&S SUBTEST ENTRY screen. The operator has the opportunity to Cancel and return to the Warhead Arming Device A&S Test screen or select a Test Subset from a dropdown menu and select Continue. Selecting Continue launches the A&S Test Monitor screen. The test subset selected is executed.
3. Single Test Step Only launches the A&S TEST STEP ENTRY screen.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.