Attachment_2_-_DRAFT_Price_Matrix.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Solicitation for C-21 Contractor Logistics Support
Solicitation number
FA8106-18-R-5000
Issued by

About this file

This market survey and solicitation seek contractor logistics support services for C-21 aircraft, including maintenance, supply chain, modifications, and field support services. The Air Force Life Cycle Management Center plans to issue a solicitation in Fall 2018 for a two-year base contract with eight one-year options to begin in April 2020. Services are required at bases in Oklahoma, Germany, and Maryland. Respondents must indicate if they will submit as a prime contractor or subcontractor. Small businesses are encouraged to participate, but the acquisition strategy has not been determined. Responses were due by April 2018.

Attachment_2_-_DRAFT_Price_Matrix.xlsx

View the file

Other files

File Type Posted
FA813419R5000_______0003.pdf PDF
Attachment_2_Price_Matrix_Revision_02_(Amendment_0002).xlsx XLSX spreadsheet
FA813419R5000_______0002.pdf PDF
Attachment_2_Price_Matrix_Revision_01_(Amendment_0001).xlsx XLSX spreadsheet
Attachment_5_Addendum_to_FAR_52.212-1_(Instructions_to_Offerors)_Revision_01_(Amendment_0001).pdf PDF
Attachment_6_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award)_Revision_01_(Amendment_0001).pdf PDF
Attachment_11_Mission_Essential_Contractor_Services.pdf PDF
Attachment_6_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award).pdf PDF
FA813419R5000.pdf PDF
More_Questions_for_Second_Draft_RFP_and_Pre-Solicitation_Conference_Questions_and_Answers.pdf PDF
C-21_CLS_Pre-Solicitation_Conference_Attendence_List.pdf PDF
Second_Draft_RFP_and_Pre-Solicitation_Conference_Questions_and_Answers.pdf PDF
Attachment_1_-_2nd_Round_Draft_C-21_CLS_PWS.docx DOCX document
DRAFT_Government_Furnished_Property_List_.xlsx XLSX spreadsheet
DRAFT_CDRL_A001.pdf PDF
Attachment_15_-_Mission_Essential_Contractor_Services.pdf PDF
DRAFT_CDRL_A008.pdf PDF
DRAFT_CDRL_A010.pdf PDF
DRAFT_C-21_CLS_RFP_-_FA813419R5000.pdf PDF
Attachment_6_-_DRAFT_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award).pdf PDF
DRAFT_CDRL_A018.pdf PDF
Attachment_3_-_DRAFT_C-21_CLS_DD-254.pdf PDF
DRAFT_CDRL_A017.pdf PDF
DRAFT_CDRL_A002.pdf PDF
DRAFT_CDRL_A007.pdf PDF
DRAFT_CDRL_A012.pdf PDF
DRAFT_CDRL_A003.pdf PDF
DRAFT_CDRL_A005.pdf PDF
DRAFT_CDRL_A013.pdf PDF
Attachment_5_-_DRAFT_Addendum_to_FAR_52.212-1_(Instructions_to_Offerors).pdf PDF
DRAFT_CDRL_A006.pdf PDF
DRAFT_CDRL_A011.pdf PDF
First_Draft_RFP_Questions_and_Answers.pdf PDF
Attachment_2_-_DRAFT_Price_Matrix.xlsx XLSX spreadsheet
Draft_RFP_FBO_Announcement.pdf PDF
Attachment_3_-_DRAFT_C-21_CLS_DD-254.pdf PDF
Attachment_1_-_DRAFT_C-21_CLS_PWS.pdf PDF
Draft_C-21_CLS_RFP_-_FA813419R5000.pdf PDF
Attachment_5_-_DRAFT_Addendum_to_FAR_52.212-1_(Instructions_to_Offerors).pdf PDF
DRAFT_C-21_CLS_Industry_Day_Group_Briefing.pdf PDF
C-21_CLS_Industry_Day_R1.pdf PDF
C-21_CLS_Industry_Day.pdf PDF
RFI__3_Questions_and_Answers.pdf PDF
C-21_CLS_RFI___3.pdf PDF
C-21_CLS_RFI___2.pdf PDF
C-21_CLS_RFI_Q&A_-_Revision_1.pdf PDF
C-21_CLS_RFI_-_Amend_2.pdf PDF
C-21_CLS_RFI_-_Amend_1.pdf PDF
C-21_CLS_RFI.pdf PDF
Questions_and_Answers_for_SSS.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Calculation Method C-21 CLS Calculation Methodology

CLINDESCRIPTIONMETHODOLOGY
0001Transition
0001AAPhase-In PeriodProposed unit price multiplied by the 4 months for Base Period. The extended total then becomes the total CLIN price.
0001ABPhase-In Incentive (Phase-In Period)Proposed unit price multiplied by the quantity of one for Base Period. The extended total then becomes the total CLIN price.
0001ACPhase-In Incentive (3 Months Full Performance)Proposed unit price multiplied by the quantity of one for Base Period. The extended total then becomes the total CLIN price.
X002Base Operations
X002AABase Ops - Scott (16 - 19 Aircraft)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002ABBase Ops - Scott (13 - 15 Aircraft)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002ACBase Ops - Scott (10 - 12 Aircraft)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002ADBase Ops - Scott (7 - 9 Aircraft)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002AEBase Ops - Scott (4 - 6 Aircraft)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002AFBase Ops - Scott (1- 3 Aircraft)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002BABase Ops - Ramstein (16-19 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002BBBase Ops - Ramstein (13-15 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002BCBase Ops - Ramstein (10-12 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002BDBase Ops - Ramstein (7-9 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002BEBase Ops - Ramstein (4-6 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002BFBase Ops - Ramstein (1-3 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002CABase Ops - Andrews (16-19 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002CBBase Ops - Andrews (13-15 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002CCBase Ops - Andrews (10-12 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002CDBase Ops - Andrews (7-9 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002CEBase Ops - Andrews (4-6 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X002CFBase Ops - Andrews (1-3 A/C)Proposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X003Flying HoursProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X004Data (CDRLs)Not separately Priced
X005A/C Phase 16 InspectionProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X006A/C Phase 14 InspectionProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X007Engine MPIProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X008Engine CZI & MPIProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X009Aircraft Strip & PaintProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X01020K Flight Control ReplacementProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X011Main Landing Gear ReplacementProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X012Nose Landing Gear ReplacementProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X013Deployments and ExercisesNot Evaluated (To Be Negotiated [TBN] when needed)
X014Southwest Asia DeploymentNot Evaluated (To Be Negotiated [TBN] when needed)
X015Contract Field Team Support - LaborProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X016Reserved
X017Modification DesignProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X018Modification Installation
X018AAModification Installation - LaborProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X018ABModification Installation - MaterialProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X019DemilitarizationProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X020DisposalProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X021Phase-Out IncentinveNot Evaluated (To Be Negotiated [TBN] when needed)
X022DoD Education AllowanceNot Evaluated (To Be Negotiated [TBN] when needed)
Over and Above (O&A) CLINs
X023O&A Depot Aircraft MaintenanceProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X024O&A Depot Engine MaintenanceProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X025O&A Organization Level & Other MaintenanceProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X026O&A Other WorkProposed unit price multiplied by the evaluation quantity for Base Period and each Option Year. The extended total for each Performance period is then added to calculate the total CLIN price.
X027O&A TravelNot Evaluated (To Be Negotiated [TBN] when needed)
X028O&A TransportationNot Evaluated (To Be Negotiated [TBN] when needed)

RFP FA8106-18-R-5000

Page &P of 3

&P

C-21 CLS

Price Matrix C-21 CLSInstructions: Provide proposed unit prices in the yellow highlighted cells in columns D-L.
Offeror:Input Offeror Name Here
UNIT PRICESEVALUATION QUANTITIESEXTENDED PRICE
CLINDESCRIPTIONUnit of IssueBase PeriodOption Year 1Option Year 2Option Year 3Option Year 4Option Year 5Option Year 6Option Year 7Option Year 8Option Year 9Base PeriodOption Year 1Option Year 2Option Year 3Option Year 4Option Year 5Option Year 6Option Year 7Option Year 8Option Year 9Base PeriodOption Year 1Option Year 2Option Year 3Option Year 4Option Year 5Option Year 6Option Year 7Option Year 8Option Year 9TOTAL EVALUATED PRICE
0001Phase-In`
0001AAPhase-In PeriodMonth4$ - 0$ - 0
0001ABPhase-In Period - (Phase-In Period)Each1$ - 0$ - 0
0001ACPhase-In Period - (3 Months Full Performance)Each1$ - 0$ - 0
X002Base Operations`
X002AABase Ops - Scott (16-19 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002ABBase Ops - Scott (13-15 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002ACBase Ops - Scott (10-12 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002ADBase Ops - Scott (7-9 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002AEBase Ops - Scott (4-6 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002AFBase Ops - Scott (1-3 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002BABase Ops - Ramstein (16-19 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002BBBase Ops - Ramstein (13-15 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002BCBase Ops - Ramstein (10-12 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002BDBase Ops - Ramstein (7-9 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002BEBase Ops - Ramstein (4-6 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002BFBase Ops - Ramstein (1-3 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002CABase Ops - Andrews (16-19 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002CBBase Ops - Andrews (13-15 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002CCBase Ops - Andrews (10-12 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002CDBase Ops - Andrews (7-9 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002CEBase Ops - Andrews (4-6 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X002CFBase Ops - Andrews (1-3 A/C)Month1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X003Flying HoursHour7068706870687068706870687068706870684712$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X004DataNSPNSP
X005A/C Phase 16 InspectionEach2111111117$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X006A/C Phase 14 InspectionsEach7121111113$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X007Engine MPIEach2111111111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X008Engine CZI & MPIEach2111111111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X009A/C Strip & PaintEach311510311510$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X01020K Flight Control ReplacementEach1427111111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X011Main Landing Gear ReplacementEach1111112111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X012Nose Landing Gear ReplacementEach2111111111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X013Deployments & ExercisesLotTBNTBNTBN
X014Southwest Asia DeploymentMonth1212121212121212128$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X015Contract Field Team Support - LaborHour50505050505050505035$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X016Reserved
X017Modification DesignHour2000200020002000200020002000200020001500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X018Modification Installation`
X018AAMod Installation - LaborHour5000500050005000500050005000500050003750$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X018ABMod Installation - Material$1,400,0001,500,0001,550,0001,600,0001,650,0001,700,0001,750,0001,800,0001,850,0001,300,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X019DemilitarizationEach11111111119$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X020DisposalEach11111111119$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X021Phase-Out IncentinveEachTBNTBNTBN
X022DoD Education AllowanceEachTBNTBNTBN
Over & Above (O&A) CLINs`
X023O&A Depot A/C MaintenanceHour2200220022002200220022002200220022001466$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X024O&A Depot Engine MaintenanceHour1500150015001500150015001500150015001000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X025O&A Organization Level & Other MaintenanceHour2080208020802080208020802080208020801386$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X026O&A Material$8,250,0008,500,0008,750,0009,000,0009,300,0009,500,0008,500,0008,750,00010,500,0007,500,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
X027O&A TravelHourTBNTBNTBN
X028O&A TransportationHourTBNTBNTBN

RFP FA8134-19-R-5000 Appendix D-Pricing Matrix &"-,Bold"&12FOR OFFICIAL USE ONLY Page &P of 9

Source Selection Information - See FAR 2.101 and 3.104 &"-,Bold"&12FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .