Supplemental library.docx

DOCX document 11 KB Posted

Attached to
Maintenance, Repair, and Rebuilding of Equipment
Solicitation number
FA8106-10-R-0013
Issued by

About this file

The latest revision to the E-9 airborne Platform / Telemetry (AP/TM) System Technical Manual-3255 Volume 1 (dated 12 May 2010) and Volume 2 (dated 30 July 2010) have been issued and are available for review at Tyndall AFB FL or Tinker AFB OK. The documents will be available for review between 23 September 2010 and 8 October 2010. Access requests may be made via e-mail at teresa.deland tinker.af.mil.

View the file

Other files

File Type Posted
FA810610R0013_______0004.RTF RTF text file
FA810610R0013_______0003_FA810610R0013_Attachment_3_ITO_Revision_2_28_Jan_11.docx DOCX document
FA810610R0013_______0003.RTF RTF text file
FA810610R0013_______0003_FA810610R0013_Attachment_4_Evaluation_Factors_Revision_1_28Jan11.docx DOCX document
FA810610R0013_______0003_FA810610R0013_Appendix_A_PWS_Revision_2_28Jan11.docx DOCX document
RFP_QUESTIONS_10-15-2010.docx DOCX document
RFP_QUESTIONS_10-14-2010.docx DOCX document
Inspections_due-thru-Sep11.pdf PDF
RFP_QUESTIONS_10-05-2010.docx DOCX document
RFP QUESTIONS 10-01-2010.docx DOCX document
FA810610R0013_______0002_FA810610R0013_Atch_3_ITO_22Sep10.docx DOCX document
FA810610R0013_______0002_PWS_Rev1_Change_Pgs_22Sep10.pdf PDF
FA810610R0013_______0002.RTF RTF text file
RFP QUESTIONS 9-21-2010.docx DOCX document
PWS_Rev1_Change_Pages_ 22Sep10.pdf PDF
FA810610R0013_Attachment_3_ITO_22Sep10.docx DOCX document
FA810610R0013_______0001.RTF RTF text file
FA810610R0013_______0001_Docket_No_NAICS_2010091051.pdf PDF
FA810610R0013.RTF RTF text file
FA810610R0013_Appendix_E_Support_Agreement_09Jun10.docx DOCX document
FA810610R0013_Attachment_3_ITO_31Aug10.docx DOCX document
FA810610R0013_Appendix_F_E-9_Performance_Plan_06Aug10.docx DOCX document
FA810610R0013_Appendix_C_Safety_Specificaiton_09Jun10.doc DOC document
FA810610R0013_Appendix_B_GFP_09Jun10.doc DOC document
FA810610R0013_Attachment_1_CLIN_Pricing_Matrix_19Aug10.docx DOCX document
FA810610R0013_Appendix_D_Reports_22Jul10.docx DOCX document
FA810610R0013_Attachment_2_PARTS_USAGE_31Mar10.PDF PDF
FA810610R0013_Appendix_A_PWS_27Aug10.docx DOCX document
FA810610R0013_Attachment_4_Evaluation_Factors_31Aug10.docx DOCX document
Vendor_Questions_Answers_Posting_16Jun10.docx DOCX document
E-9A AIRBORNE PLATFORM DWG TREE MAY 2009.pdf PDF
TO_1-1-689.pdf PDF
TO_00-20-14.PDF PDF
TO_1-1-691.pdf PDF
TO_1-1A-14.pdf PDF
TO_00-5-3.pdf PDF
E-9_Applicable_Document.xlsx XLSX spreadsheet
TO_00-25-234.pdf PDF
1-1-300.pdf PDF
TO_1-1-8.PDF PDF
Appendix_D_Reports.docx DOCX document
Attachment_2_PARTS_USAGE.PDF PDF
FA810610R0013.pdf PDF
Pre-solicitation_conference_registration.docx DOCX document
Attachment_5_Wage_Determination_05-3007.docx DOCX document
Appendix_C_Safety_Specificaiton.doc DOC document
Appendix_E_Support_Agreement.docx DOCX document
Attachment_4_Evaluation_Factors.docx DOCX document
Attachment_3_ITO.docx DOCX document
Appendix_B_GFP.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The latest revision to the E-9 airborne Platform / Telemetry (AP/TM) System Technical Manual-3255 Volume 1 (dated 12 May 2010) and Volume 2 (dated 30 July 2010) have been issued and are available for review at Tyndall AFB, FL or Tinker AFB, OK. The documents will be available for review between 23 September 2010 and 8 October 2010. Contractors need to request access to the bidder’s library for the purpose of reviewing the revised manuals to ensure they have the latest information possible. Contractors will be allowed to take notes only and not remove or copy documents. Contractors will be limited 4 hours, and a maximum of two (2) persons. Names shall be provided to Contracting Officer (CO) in initial request. No questions will be answered during the review. All questions must be formally submitted in writing to the CO. The CO will provide additional information on locations upon receipt of request.

Contractors who wish to review the documents shall notify the Contracting Officer (CO), in writing. The Contractor may include preferred date, time location. The CO will coordinate times and establish a schedule based on number or requests. Requests may be submitted through COB 1 October 2010.

Access requests may be made via e-mail at teresa.deland@tinker.af.mil.

File details come from the government source that posted it. Updated .