RFP QUESTIONS 9-21-2010.docx

DOCX document 17 KB Posted

Attached to
Maintenance, Repair, and Rebuilding of Equipment
Solicitation number
FA8106-10-R-0013
Issued by

About this file

Answers to Vendor Questions as of 21 Sep 10.

View the file

Other files

File Type Posted
FA810610R0013_______0004.RTF RTF text file
FA810610R0013_______0003_FA810610R0013_Attachment_3_ITO_Revision_2_28_Jan_11.docx DOCX document
FA810610R0013_______0003.RTF RTF text file
FA810610R0013_______0003_FA810610R0013_Attachment_4_Evaluation_Factors_Revision_1_28Jan11.docx DOCX document
FA810610R0013_______0003_FA810610R0013_Appendix_A_PWS_Revision_2_28Jan11.docx DOCX document
RFP_QUESTIONS_10-15-2010.docx DOCX document
RFP_QUESTIONS_10-14-2010.docx DOCX document
Inspections_due-thru-Sep11.pdf PDF
RFP_QUESTIONS_10-05-2010.docx DOCX document
RFP QUESTIONS 10-01-2010.docx DOCX document
FA810610R0013_______0002_FA810610R0013_Atch_3_ITO_22Sep10.docx DOCX document
FA810610R0013_______0002_PWS_Rev1_Change_Pgs_22Sep10.pdf PDF
FA810610R0013_______0002.RTF RTF text file
PWS_Rev1_Change_Pages_ 22Sep10.pdf PDF
FA810610R0013_Attachment_3_ITO_22Sep10.docx DOCX document
Supplemental library.docx DOCX document
FA810610R0013_______0001.RTF RTF text file
FA810610R0013_______0001_Docket_No_NAICS_2010091051.pdf PDF
FA810610R0013.RTF RTF text file
FA810610R0013_Appendix_E_Support_Agreement_09Jun10.docx DOCX document
FA810610R0013_Attachment_3_ITO_31Aug10.docx DOCX document
FA810610R0013_Appendix_F_E-9_Performance_Plan_06Aug10.docx DOCX document
FA810610R0013_Appendix_C_Safety_Specificaiton_09Jun10.doc DOC document
FA810610R0013_Appendix_B_GFP_09Jun10.doc DOC document
FA810610R0013_Attachment_1_CLIN_Pricing_Matrix_19Aug10.docx DOCX document
FA810610R0013_Appendix_D_Reports_22Jul10.docx DOCX document
FA810610R0013_Attachment_2_PARTS_USAGE_31Mar10.PDF PDF
FA810610R0013_Appendix_A_PWS_27Aug10.docx DOCX document
FA810610R0013_Attachment_4_Evaluation_Factors_31Aug10.docx DOCX document
Vendor_Questions_Answers_Posting_16Jun10.docx DOCX document
E-9A AIRBORNE PLATFORM DWG TREE MAY 2009.pdf PDF
TO_1-1-689.pdf PDF
TO_00-20-14.PDF PDF
TO_1-1-691.pdf PDF
TO_1-1A-14.pdf PDF
TO_00-5-3.pdf PDF
E-9_Applicable_Document.xlsx XLSX spreadsheet
TO_00-25-234.pdf PDF
1-1-300.pdf PDF
TO_1-1-8.PDF PDF
Appendix_D_Reports.docx DOCX document
Attachment_2_PARTS_USAGE.PDF PDF
FA810610R0013.pdf PDF
Pre-solicitation_conference_registration.docx DOCX document
Attachment_5_Wage_Determination_05-3007.docx DOCX document
Appendix_C_Safety_Specificaiton.doc DOC document
Appendix_E_Support_Agreement.docx DOCX document
Attachment_4_Evaluation_Factors.docx DOCX document
Attachment_3_ITO.docx DOCX document
Appendix_B_GFP.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Questions on RFP PWS Paragraph 4.12.2; ATRS weekly aircrew/controller meeting when qualified Contractor crewmembers (maintenance personnel) only fly “5-6 times” annually. Does the government want the maintenance personnel pulled from the job to attend weekly aircrew/controller briefings on a weekly basis or as required to support mission parameters?

Answer: The requirement to attend the weekly 82 ATRS aircrew/controller meeting is deleted. Change reflected in RFP Amendment 0002, Appendix A, PWS Revision 1, dated 22 Sep 10.

ITO Table 2-2, Proposal Organization; The Cost/Price Volume IV references paragraph 6.2.6 for “6 – Copy of Model Contract Schedule of Supplies/Services”. Paragraph 6.2.6 does not exist.

Answer: On page 4 of ITO Change table to read as follows:

Item 6 under Volume IV Cost/Price to;

7.1.2
6 – Copy of CLIN level pricing provided in volume V Contract Documentation

Unlimited

Change reflected in RFP Amendment 0002, Attachment 3, ITO Revision 1, dated 22 Sep 10 ITO Paragraph 7.1 Model Contract/Representations and Certifications – “… The Offeror’s proposal shall include a signed copy of the Model Contract (SF 1449) containing the data required by paragraphs 7.1.1 through 7.1.7.” Paragraph 7.1.7 does not exist.

Answer: Change last line of paragraph 7.1 to read “….7.1.1 through 7.1.6. Change reflected in RFP Amendment 0002, Attachment 3, ITO Revision 1, dated 22 Sep 10 ITO - 6.3.5 Management Reduction “If estimated costs to perform the proposed effort have been decreased due to a management decision, provide a summary of the reduction by major cost element summary. Also provide complete rationale for the reduction.”

What is the government asking and why?

Answer: In order to determine the reasonableness of the proposed price, the Government must understand the costs used to develop the price. If the Offeror makes "a management decision" to reduce a cost element below the normal level used for estimating costs, this decision needs to be identified and explained. Since unreasonably low or high prices may be cause for eliminating a proposal from competition, the Government needs to understand that a price may appear low as a result of "a management decision."

PWS Attachment E indicates two different types of Telemetry antenna systems referencing Aircraft 047 only. Have both aircraft been modified with the new Telemetry system?

Answer: Disregard all notes with reference to “Aircraft 047 only” (notes 5, 6, 7, 8, 10, 13, and 16). Notes referencing “Aircraft 048 only” apply to both aircraft (notes 5a and 7a). Both aircraft have been modified with the new Telemetry System.

Information to Offerors paragraph 4.2.5 states:

4.2.5. Subfactor Three: Mission Systems Logistic Support

The Offeror shall provide an approach for Mission Systems Logistics Support for the E-9 CLS program. As a minimum, the approach shall provide the following essential components:

(a) Written verification of the proposed mission system maintainer’s qualifications and experience and written verification from the candidate stating intentions to work for the Offeror if awarded the E-9 contract. (PWS: 4.1.3) We are currently attempting to acquire such information but have been turned down once from the incumbent. Would the Government consider relaxing this requirement?

Answer: No, the Air Force will not consider relaxing this requirement. The Mission systems maintenance personnel candidate must meet one of the minimum qualification and experience levels in paragraph 4.1.3.1, Intermediate Mission Systems Maintenance Personnel or paragraph 4.1.3.2, Organizational Maintenance Technicians, as appropriate.

File details come from the government source that posted it. Updated .