About this file
From the source
Attachment - technical_data_top_level.pdf
Other files for this federal contract opportunity
Other files attached to Block 45 Full Rate Production Group A Kit Procurement, newest first.
| File |
Type |
Posted |
| Q AsfortheBlock45GroupAKitRFP27Jan2015_1.docx |
DOCX document |
|
| KC-135_Block_45_CPN-VPN_Cross_Reference.pdf |
PDF |
|
| Q A's_(1.23.2015).docx |
DOCX document |
|
| Q A's_(1.16.2015).docx |
DOCX document |
|
| Q A's_(1.15.2015).docx |
DOCX document |
|
| Q A's_(1.13.2015).docx |
DOCX document |
|
| FA810514R0009_______0002.pdf |
PDF |
|
| Block_45_Group_A_KitEvaluationFactors_19Dec2014.docx |
DOCX document |
|
| Instructions_to_Offerors_19Dec2014.docx |
DOCX document |
|
| FA810514R0009_______0001.pdf |
PDF |
|
| QAs_for_the_RFP.docx |
DOCX document |
|
| FA810514R0009_technical_data_misc_material.pdf |
PDF |
|
| FA810514R0009_technical_data_mechanical.pdf |
PDF |
|
| FA810514R0009_Di_SESS-81646_CDRL_A004.pdf |
PDF |
|
| FA810514R0009_technical_data_electrical.pdf |
PDF |
|
| FA810514R0009_technical_data_process_specs.pdf |
PDF |
|
| FA810514R0009_SOW.docx |
DOCX document |
|
| FA810514R0009_technical_data_drawing_status.pdf |
PDF |
|
| FA810514R0009_technical_data_procedures.pdf |
PDF |
|
| FA810514R0009_technical_data_landing_gear_position.pdf |
PDF |
|
| FA810514R0009_AS50881Rev_C_Wiring_Aerospace_Vehicle.pdf |
PDF |
|
| FA810514R0009_A002_DI_MGMT_81804A_IUID_Verification_Report.pdf |
PDF |
|
| FA810514R0009_RC_WSM1_22_Workmanship_Standards.pdf |
PDF |
|
| FA810514R0009_818-3775-001_Rev-N.pdf |
PDF |
|
| FA810514R0009_A004_DI_SESS_81646_Configuration_Audit_Plan.pdf |
PDF |
|
| FA810514R0009_DI_MGMT_81650.pdf |
PDF |
|
| FA810514R0009_Instructions_to_Offerors_2Oct2014.docx |
DOCX document |
|
| FA810514R0009_DI_MGMT_81803_CDRL_A001.pdf |
PDF |
|
| FA810514R0009_Di_MGMT_81804_CDRL_A002.pdf |
PDF |
|
| FA810514R0009_Master_Material_List_wNSNs_28_Jan_2014.xlsx |
XLSX spreadsheet |
|
| FA810514R0009_EvaluationFactors_2Oct2014.docx |
DOCX document |
|
| FA810514R0009_818-3871-003_Rev-D.pdf |
PDF |
|
| FA810514R0009_A003_DI_MGMT_81650_Integrated_Master_Schedule.pdf |
PDF |
|
| FA810514R0009_technical_data_decals.pdf |
PDF |
|
| FA810514R0009_A001_DI_MGMT_81803_IUID_Marking_Plan.pdf |
PDF |
|
| FA810514R0009.RTF |
RTF text file |
|
| SOW_23_Sep.pdf |
PDF |
|
| DiDs.pdf |
PDF |
|
| A004_DI_SESS_81646_Configuration_Audit_Plan.pdf |
PDF |
|
| Evaluation_Factors.pdf |
PDF |
|
| A001_DI_MGMT_81803_IUID_Marking_Plan.pdf |
PDF |
|
| Instructions_to_Offerors_6Oct2014.pdf |
PDF |
|
| A002_DI_MGMT_81804A_IUID_Verification_Report.pdf |
PDF |
|
| draft_group_A_kits_rfp.pdf |
PDF |
|
| A003_DI_MGMT_81650_Integrated_Master_Schedule.pdf |
PDF |
|
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .