ITO_-_Attachment_1.6_Line_Item_Pricing_Matrix_2015-02-09.xlsx

XLSX spreadsheet 63 KB Posted

Attached to
SOLICITATION TAFB PAVING IDIQ Federal contract opportunity
Solicitation number
FA8101-15-R-0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

ITO - 1.6 LINE ITEM PRICING MATRIX SPREADSHEET

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION TAFB PAVING IDIQ, newest first.
File Type Posted
FA8101-15-R-0001-0002.pdf PDF
PAV_-_2_TAFB_Paving_Standard_Details_2015_-_Combined_REVISION_1.pdf PDF
ITO_-_Attachment_1.6_Line_Item_Pricing_Matrix_2015-03-24_REVISION_1.xlsx XLSX spreadsheet
FA8101-15-R-0001_Q-As_Dated_2015-03-24.pdf PDF
Paving_IDIQ_Pre-Proposal_Sign-In_2015-03-12.pdf PDF
Paving_IDIQ_Pre-Proposal_Brief_2015-03-12.pdf PDF
FA8101-15-R-0001-0001.pdf PDF
ITO_-_Attachment_1.5_2015-02-09.docx DOCX document
ITO_-_Attachment_1.7_2015-02-09.xlsx XLSX spreadsheet
ITO_-_Attachment_1.4_2015-02-09.docx DOCX document
Section_L_Base_Paving_2015-02-09.pdf PDF
SMPL_-_2_Sample_Project_WWYK100217__Drawings.pdf PDF
ITO_-_Attachment_1.1_2015-02-09.docx DOCX document
RFP_FA8101-15-R-0001_2015-02-11.pdf PDF
Section_M_Base_Paving_2015-02-09.pdf PDF
SMPL_-_1_Sample_Project_WWYK100217_Statement_of_Work_(SOW).pdf PDF
ITO_-_Attachment_1.0_2015-02-09.docx DOCX document
INT_-_1_Initial_DO_Statement_of_Work_(SOW).pdf PDF
WD_-_1_Wage_Determination_OK150015_01-02-2015.pdf PDF
SMPL_-_3_Sample_Project_WWYK100217__Submittal_Form_66.pdf PDF
PAV_-_2_TAFB_Paving_Standard_Details_2015_-_Combined.pdf PDF
PAV_-_1_TAFB_Paving_Technical_Specification_2015_-_Combined.pdf PDF
PAV_-_3_TAFB_Paving_IDIQ_Submittal_form_66_-_2014-06-09.pdf PDF
ITO_-_Attachment_1.3_2015-02-09.docx DOCX document
ITO_-_Attachment_1.2_2015-02-09.docx DOCX document
INT_-_2_Initial_DO_Contractor_Staging_Area_Photos.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Sheet

Date:
Company Name:
Company Contact:
Contact Phone #:
Company Proposal #:
Instructions:1. Submit the quantities of hard copies and electronic pdf copies specified by the Contracting Officer. Do not submit the Excel Workbook.
2. Fill in the costs in Column E only. Do not alter anything in Columns A,B,C or D unless directed, in writing, to do so by the Contracting Officer.
3. Column F and Sheet 6 Summary, will automatically adjust.

Tinker AFB, OK &"Arial,Bold"&18Cover Sheet IDIQ, Base Paving

FA8101-15-R-0001 Page &P of &N ITO Attachment 1.6 Line Item Pricing Matrix

Base Yr Pricing

LINE ITEMDESCRIPTIONUNITQTYUNIT COSTTOTAL
00012" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 2" asphalt pavement IAW Detail A-1. (EPA Eligible)SY500$0
00022" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 2" asphalt pavement IAW Detail A-1. (EPA Eligible)SY1,500$0
00034" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 4" asphalt pavement IAW Detail A-2. (EPA Eligible)SY1,000$0
00044" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 4" asphalt pavement IAW Detail A-2. (EPA Eligible)SY3,000$0
00056" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-3. (EPA Eligible)SY500$0
00066" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-3. (EPA Eligible)SY4,000$0
00078" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-4. (EPA Eligible)SY500$0
00088" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-4. (EPA Eligible)SY1,500$0
0009Asphalt Cold Milling (Up to 2 ½”) - Includes hauling and proper disposal off the Base. Work shall conform to the Contract Specifications.SY30,000$0
0010Milling (Mob and Demob) - Includes delivery and set-up of machine to the Base and its removal upon completion. No payment shall be made for movement from one site to another within the Base.EA5$0
0011Asphalt Overlay (1-1/2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY5,000$0
0012Asphalt Overlay (2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY20,000$0
0013Asphalt Overlay (2-1/2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY15,000$0
0014Asphalt Pavement Removal Includes hauling, sawing, removal of existing asphalt pavement and proper disposal off base.CY1,000$0
0015Fabric Reinforcement for AC Pavement Includes preparation, installation and application of fabric reinforcement material with bituminous binder included IAW Contract Specifications.SY20,000$0
00162” Asphalt Construction – Includes all hauling, sawing, removal, proper disposal of existing materials necessary, soil stabilization and the installation of 2" asphalt pavement and base IAW Detail A-1. (EPA Eligible)SY1,000$0
00172” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 2" asphalt pavement IAW Detail A-5 (EPA Eligible)SY2,000$0
00184” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 4" asphalt pavement IAW Detail A-6. (EPA Eligible)SY2,000$0
00196” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 6" asphalt pavement IAW Detail A-7. (EPA Eligible)SY2,000$0
00208” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary, soil stabilization and the installation of 8" asphalt pavement IAW Detail A-8. (EPA Eligible)SY1,000$0
00214” Asphalt Trail Construction – Hauling, removal, the proper disposal of existing materials necessary for installation of 4" stabilized aggregate and 4" asphalt pavement on a compacted subgrade IAW Detail A-10. (EPA Eligible)SY2,500$0
00222” Asphalt Sidewalk Construction – Hauling, removal, the proper disposal of existing materials necessary for installation of 4" of stabilized aggregate and 2" asphalt pavement on a compacted subgrade IAW Detail A-11. (EPA Eligible)SY300$0
0023Asphalt Seal Coat - Includes surface cleaning and applying two 12-15 mil seal coats IAW Contract Specifications.SY25,000$0
0024PCC Pavement Removal - Includes hauling, sawing, breaking, removal, proper disposal of existing PCC pavement.CY1,500$0
0025Asphalt Speed Table - Includes all equipment, labor and materials necessary to install asphalt speeds tables IAW Detail A-12 (EPA Eligible)SY200$0
00266" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 6" concrete pavement IAW Detail C-1.SY500$0
00276" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 6" concrete pavement IAW Detail C-1.SY1,000$0
00289" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" concrete pavement IAW Detail C-2.SY500$0
00299" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" concrete pavement IAW Detail C-2.SY3,000$0
00309" TO 14" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" to 14" concrete pavement IAW Detail C-3.SY500$0
00319" to 14" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" to 14" concrete pavement IAW Detail C-3.SY2,000$0
003215" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 15" concrete pavement IAW Detail C-4.SY1,000$0
003315" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 15" concrete pavement IAW Detail C-4.SY2,000$0
003418" to 24" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 18" to 24" concrete pavement IAW Detail C-5.SY1,500$0
003518" to 24" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 18" to 24" concrete pavement IAW Detail C-5.SY2,500$0
0036Soil stabilization - Includes hauling, spreading, scarifying and compaction using hydrated lime at 4% mix by weight, 12" deep.SY9,000$0
0037Site Preparation – Includes surveying, staking, layout, stockpiling topsoil if necessary, and proctor testing IAW Contract Specifications. This line item is only used when grading and elevations in new work are required.SY15,000$0
0038Stabilized Aggregate Base- Includes hauling, spreading and compaction to 95% standard density. A cubic yard is equal to 6 square yards 6" deep. Alternate price is $ 10.34 a square yard.CY10,000$0
00396" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 6" concrete installation IAW Detail C-6.SY1,000$0
00409" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 9" concrete installation IAW Detail C-7.SY1,000$0
004112" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 12" concrete installation IAW Detail C-8.SY1,000$0
004218" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 18" concrete installation IAW Detail C-9.SY1,000$0
00438" PCC Street Pavement Includes all site preparation, subgrade preparation, and 8" concrete installation IAW Detail C-10.SY800$0
00446" PCC Street Pavement Includes all site preparation, subgrade preparation, and 6" concrete installation IAW Detail C-11.SY600$0
0045PCC Sidewalk (Construction & Repair) - Includes hauling, sawing, removal, proper disposal of existing material as necessary for installation of concrete and base material IAW Detail C-12.SY500$0
0046Handicap Ramps, Type “A” Includes sawing, removal, proper disposal and hauling of existing materials as necessary for construction of new concrete handicap ramps IAW Detail C-15.SY200$0
0047Handicap Ramps, “Type “B” Includes sawing, removal, proper disposal and hauling of existing materials as necessary for construction of new concrete handicap ramps IAW Detail C-16.SY200$0
0048P.C. Concrete Flume – Includes hauling, installation and compaction of materials for a concrete flume IAW Detail C-14.LF100$0
0049PCC Speed Table -Includes layout, sawing pavement, excavation, hauling, installation of 8" compacted aggregate base, #4 rebar and concrete IAW Detail C-17SY250$0
0050PCC Curb & Gutter Removal - Includes sawcutting, removal, hauling and proper disposal off base.LF800$0
0051PCC Curb and Gutter, Replacement and New Includes hauling, sawing, removal, proper disposal off base and replacement of existing concrete curb and gutter and/or all costs for construction of new curb and gutter IAW Detail C-13.LF1,500$0
0052PCC Expansion Joints (pavement 9" or less) Includes all labor, materials and equipment to install expansion joints in PCC pavement IAW Detail J-1.LF500$0
0053PCC Expansion Joints (pavement greater than 9") Includes all labor, materials and equipment to install expansion joints in PCC pavement IAW Detail J-1.LF400$0
0054PCC Sawed Joints – Includes all labor, materials and equipment to install sawed joints in PCC pavement IAW Detail J-2.LB20,000$0
0055Crack Sealing - Rout out if necessary to minimum width and depth needed, clean-out and seal random cracks in asphalt and concrete pavements IAW Detail J-4.GAL500$0
0056Joint Repair - Clean out to a depth of 6" and re-seal joints in concrete pavement IAW Detail J-3.LF4,500$0
0057Crack Sealing, Airfield - Rout out if necessary to minimum width and depth needed, clean-out and seal random cracks in asphalt and concrete pavement IAW Detail J-4.LF500$0
0058Joint Resealing Airfield – Clean and seal joint in concrete pavement IAW Details J-3.LF3,000$0
0059PCC Patching- Includes all work and materials necessary to patch (repair) spalled areas in existing PCC pavement IAW Detail C-18.SF800$0
00606" Subdrainage Piping - Includes excavation, filter fabric, perforated pipe, and filter stone IAW Detail D-2LF4,000$0
0061Cast Iron Curb Inlet – Includes excavation, hauling, materials and installation of new Curb Inlet in accordance with Detail D-5 and Contract Specifications.EA20$0
0062Precast Concrete Manhole – Includes excavation, transportation, labor and materials to install Precast Concrete Manhole up to 5 feet in height in accordance with Detail D-4 and Contract Specifications. Height over 5 feet will be paid for as “additional depth in manhole”.EA10$0
0063Additional Depth in Manhole Includes hauling, material and installation for each vertical foot of manhole over 5 feet.VF50$0
0064Storm Sewer Inlet Adjustment Includes all work necessary to adjust existing inlet structure to new pavement elevation IAW Details D-6 and D-6a.EA12$0
0065Storm Sewer Inlet Modification Includes all work necessary to modify existing inlet structure and adjust to new pavement elevation IAW Details D-6 and D-6a.EA5$0
0066Manhole Adjustment - Includes all work and materials necessary to adjust existing manhole cover to new pavement elevation (up to 6”).Work shall include #4 bar reinforcement for a 5' square, concrete collar 6" thick.EA15$0
0067Valve Box Adjustment - Includes all work and materials necessary to adjust existing valve box to new pavement elevation (up to 6”). Work shall include a reinforced concrete collar with a minimum concrete clearence from the valve box of 6".EA30$0
006812" RCP – Includes all transportation, labor and materials to install 12" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF1,000$0
006915" RCP – Includes all transportation, labor and materials to install 15" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF250$0
007018" RCP – Includes all transportation, labor and materials to install 18" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF250$0
007124" RCP – Includes all transportation, labor and materials to install 24" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF250$0
00726” Dia. Fixed Bollard – Layout, drilling, installing a 6" Dia. primed, painted, concrete filled steel bollard IAW Detail B-1EA200$0
00736” Dia. Removable Bollard – Layout, drilling, installing a 6" Dia. Steel bollard, primed, painted, two stripes of reflective tape, base receiver mounted on a 6" concrete storage pad IAW Detail B-2 & B-2A. Minimum to be installed 2 ea.EA200$0
0074Striping (Paint) - Includes layout, surface preparation, and striping of lines, words or symbols with either white or yellow paint. Paint shall meet the requirements of Contract Specifications.SF40,000$0
0075Striping (Thermoplastic) - Includes layout, surface preparation and striping of lines, words, or symbols with either white or yellow thermoplastic. Thermoplastic shall meet the requirements of Contract Specifications.SF20,000$0
0076Painting Handicap Symbols - (white) with blue background (Pavement Marking).EA75$0
0077Standard 7 foot Concrete Bumper Blocks - Includes hauling, layout and installing (new) with 2 steel rods for in-ground placement.EA100$0
0078Pavement Markers, Class “C” Type 1 & 2 (Amber & Crystal) - All pavement markers shall be class “C” type 1 or 2 (all weather, plowable type) IAW DETAIL T-1 and the ODOT Standard Specifications for Highway Construction.EA100$0
0079Traffic Signs Installation (New) - Includes concrete footing, signs with Diamond Grade reflective sheeting and faces (stop, yield, do not enter, one way and others). Height & placement of signs shall be installed IAW Manual on Uniform Traffic Control Devices, latest edition.EA30$0
0080Relocate Existing Traffic Signs - Includes removal of existing footing and sign and reinstallation.EA35$0
0081Topsoil, 4" deep (Agriculturally suitable for supporting grass) - Includes furnishing, hauling and spreading topsoil as required in the project plan. 9 SY is equal to 1 CYSY30,000$0
0082Sodding - Sodding installation shall meet the requirements of Contract Specifications.SY25,000$0
0083Seeding – Seeding installation shall meet the requirements of Contract Specifications.SY25,000$0
0084Saw Cutting Asphalt Pavements – Includes saw cutting asphalt pavements as shown on the construction drawings and not covered in other CLINs.IN/LF10,000$0
0085Saw Cutting Concrete Pavements - Includes saw cutting concrete pavements as shown on the construction drawings and not covered in other CLINsIN/LF10,000$0
0086Storm Water Pollution Prevention Measures (SWPPM) - Includes permitting, labor and materials for temporary sediment controls as specified in the WO and IAW ODOT Specifications.LF30,000$0
0087Controlled Low-Strength Material, CLSM (Flowable Fill)- includes ash, cement, aggregate, water and sand necessary to provide for a 1,000 psi mix with a Minimum spread rate is 8 inches. Also includes flow test, unit weight test and compressive strength test at 28 days.CY1,000$0
0088Reinforcing Steel – Includes materials and installation of reinforcing steel IAW the Contract Specifications.LB30,000$0
0089Traffic Control and Phasing – All labor, equipment and materials, including all signs, signals, barracades and lights, required to direct traffic through and detour around construction zones.Job4$0
0090Sweeper – Includes all labor, equipment and materials required for mobilization, operation, demobilization and disposal of collected materials off site.Job4$0
0091Grinding PCC Pavement – Includes all labor, equipment and materials required for mobilization, operation, demobilization and surface cleaning.SY1,000$0
0092PCC Manhole Collars – Includes all labor, equipment and materials required for installation.EA25$0
PAVING SECTION Sub-Total$0
LIGHTING SECTION
0093Single Arm Light Pole (500-1000 Watt) – Includes all hauling, excavation, foundation (Detail E-1), a 30' pole with single arm, fixture, and all accessories required for a complete lighting pole.EA4$0
0094Twin Arm Lighting Posts (500-1000 Watt) – Includes all hauling, excavation, foundation (Detail E-1), a 30' pole with twin arm, fixture, and all accessories required for a complete lighting pole.EA4$0
0095Remove/Reinstall Existing Light Poles - Includes removal and reinstallation of existing lighting poles. Includes excavation, rreinforcement, PVC conduit, anchor bolts, grounding rod, all necessary connections and concrete IAW Detail E-1.EA10$0
0096Trenching for Conduits <2" Diameter - Includes trenching, backfilling, compaction and buried electrical tape for duckbank as shown IAW Detail E-2.LF2,000$0
0097Trenching for Conduits >2"&<4" Diameter - Includes trenching, backfilling, compaction and buried electrical tape, for duckbank as shown IAW Detail E-2.LF2,000$0
0098Pullboxes - Includes excavation, pullbox, backfill, compaction and lid.EA40$0
0099Type EB Utility Duct (4" Diameter) - Includes EB utility duct, spacers and fittings for concrete encasement IAW Detail E-2.LF400$0
0100Type DB Utility Duct (4" Diameter) - Includes DB utility duct, spacers and fittings for direct burial IAW Detail E-3.LF400$0
0101Pavement Boring (For 6" Diameter Duct) - Includes all preparation, backfilling, and boring of empty 6” utility duct under pavement.LF400$0
0102Concrete Encased Ductbank - Includes excavation, backfilling, reinforcement and concrete for ductbank as shown IAW Detail E-2.LF400$0
0103Drilled Pier < 10 VLF; 24" Diameter -includes mobilization, drilling, concrete, reinforcement and material removal and disposal.VLF100$0
0104Drilled Pier < 10 VLF; 36" Diameter -includes mobilization, drilling, concrete, reinforcement and material removal and disposal.VLF100$0
01054 Bolt Pattern, L TYPE, Anchor Bolt Set: 1" Diameter x 24" Long -includes L type bolts, job made template, 2 hex nuts and 2 washers.EA20$0
01061" Electrical Conduit - Includes 1” PVC Schedule 40 Conduit, fittings and sweeps.LF6,500$0
0107Wiring for Electrical Conduit #10 THWN - #10 THWN installed in conduit and all connections.LF7,500$0
0108Wiring for Electrical Conduit #8 THWN - #8 THWN installed in conduit and all connections.LF7,500$0
0109Wiring for Electrical Conduit #6 THWN - #6 THWN installed in conduit and all connections.LF7,500$0
0110Wiring for Electrical Conduit #6 Copper - #6 bare copper all connections.LF1,000$0
LIGHTING Sub-Total$0
NON PREPRICED ITEMS
NP001Non-PrePriced Line Items -includes providing, and complete installation ofany line item not covered by the above items. Numbering continues NPI-01, NPI-02, etc… These items are limited to 10% of the total cost of the contract.$0
NP002$0
NON PREPRICED Sub-Total$0
ESTIMATE TOTAL$0
&K01+027Tinker AFB, OK&"Arial,Bold"&16Base Year - Pricing
&K01+027IDIQ, Base Paving

&K01+029FA8101-15-R-0001 &K01+029Page &P of &N &K01+029ITO Attachment 1.6 Line Item Pricing Matrix

Option Yr 1 Pricing

LINE ITEMDESCRIPTIONUNITQTYUNIT COSTTOTAL
10012" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 2" asphalt pavement IAW Detail A-1. (EPA Eligible)SY500$0
10022" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 2" asphalt pavement IAW Detail A-1. (EPA Eligible)SY1500$0
10034" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 4" asphalt pavement IAW Detail A-2. (EPA Eligible)SY1000$0
10044" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 4" asphalt pavement IAW Detail A-2. (EPA Eligible)SY3000$0
10056" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-3. (EPA Eligible)SY500$0
10066" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-3. (EPA Eligible)SY4000$0
10078" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-4. (EPA Eligible)SY500$0
10088" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-4. (EPA Eligible)SY1500$0
1009Asphalt Cold Milling (Up to 2 ½”) - Includes hauling and proper disposal off the Base. Work shall conform to the Contract Specifications.SY30000$0
1010Milling (Mob and Demob) - Includes delivery and set-up of machine to the Base and its removal upon completion. No payment shall be made for movement from one site to another within the Base.EA5$0
1011Asphalt Overlay (1-1/2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY5000$0
1012Asphalt Overlay (2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY20000$0
1013Asphalt Overlay (2-1/2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY15000$0
1014Asphalt Pavement Removal Includes hauling, sawing, removal of existing asphalt pavement and proper disposal off base.CY1000$0
1015Fabric Reinforcement for AC Pavement Includes preparation, installation and application of fabric reinforcement material with bituminous binder included IAW Contract Specifications.SY20000$0
10162” Asphalt Construction – Includes all hauling, sawing, removal, proper disposal of existing materials necessary, soil stabilization and the installation of 2" asphalt pavement and base IAW Detail A-1. (EPA Eligible)SY1000$0
10172” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 2" asphalt pavement IAW Detail A-5 (EPA Eligible)SY2000$0
10184” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 4" asphalt pavement IAW Detail A-6. (EPA Eligible)SY2000$0
10196” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 6" asphalt pavement IAW Detail A-7. (EPA Eligible)SY2000$0
10208” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary, soil stabilization and the installation of 8" asphalt pavement IAW Detail A-8. (EPA Eligible)SY1000$0
10214” Asphalt Trail Construction – Hauling, removal, the proper disposal of existing materials necessary for installation of 4" stabilized aggregate and 4" asphalt pavement on a compacted subgrade IAW Detail A-10. (EPA Eligible)SY2500$0
10222” Asphalt Sidewalk Construction – Hauling, removal, the proper disposal of existing materials necessary for installation of 4" of stabilized aggregate and 2" asphalt pavement on a compacted subgrade IAW Detail A-11. (EPA Eligible)SY300$0
1023Asphalt Seal Coat - Includes surface cleaning and applying two 12-15 mil seal coats IAW Contract Specifications.SY25000$0
1024PCC Pavement Removal - Includes hauling, sawing, breaking, removal, proper disposal of existing PCC pavement.CY1500$0
1025Asphalt Speed Table - Includes all equipment, labor and materials necessary to install asphalt speeds tables IAW Detail A-12 (EPA Eligible)SY200$0
10266" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 6" concrete pavement IAW Detail C-1.SY500$0
10276" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 6" concrete pavement IAW Detail C-1.SY1000$0
10289" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" concrete pavement IAW Detail C-2.SY500$0
10299" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" concrete pavement IAW Detail C-2.SY3000$0
10309" TO 14" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" to 14" concrete pavement IAW Detail C-3.SY500$0
10319" to 14" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" to 14" concrete pavement IAW Detail C-3.SY2000$0
103215" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 15" concrete pavement IAW Detail C-4.SY1000$0
103315" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 15" concrete pavement IAW Detail C-4.SY2000$0
103418" to 24" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 18" to 24" concrete pavement IAW Detail C-5.SY1500$0
103518" to 24" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 18" to 24" concrete pavement IAW Detail C-5.SY2500$0
1036Soil stabilization - Includes hauling, spreading, scarifying and compaction using hydrated lime at 4% mix by weight, 12" deep.SY9000$0
1037Site Preparation – Includes surveying, staking, layout, stockpiling topsoil if necessary, and proctor testing IAW Contract Specifications. This line item is only used when grading and elevations in new work are required.SY15000$0
1038Stabilized Aggregate Base- Includes hauling, spreading and compaction to 95% standard density. A cubic yard is equal to 6 square yards 6" deep. Alternate price is $ 10.34 a square yard.CY10000$0
10396" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 6" concrete installation IAW Detail C-6.SY1000$0
10409" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 9" concrete installation IAW Detail C-7.SY1000$0
104112" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 12" concrete installation IAW Detail C-8.SY1000$0
104218" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 18" concrete installation IAW Detail C-9.SY1000$0
10438" PCC Street Pavement Includes all site preparation, subgrade preparation, and 8" concrete installation IAW Detail C-10.SY800$0
10446" PCC Street Pavement Includes all site preparation, subgrade preparation, and 6" concrete installation IAW Detail C-11.SY600$0
1045PCC Sidewalk (Construction & Repair) - Includes hauling, sawing, removal, proper disposal of existing material as necessary for installation of concrete and base material IAW Detail C-12.SY500$0
1046Handicap Ramps, Type “A” Includes sawing, removal, proper disposal and hauling of existing materials as necessary for construction of new concrete handicap ramps IAW Detail C-15.SY200$0
1047Handicap Ramps, “Type “B” Includes sawing, removal, proper disposal and hauling of existing materials as necessary for construction of new concrete handicap ramps IAW Detail C-16.SY200$0
1048P.C. Concrete Flume – Includes hauling, installation and compaction of materials for a concrete flume IAW Detail C-14.LF100$0
1049PCC Speed Table -Includes layout, sawing pavement, excavation, hauling, installation of 8" compacted aggregate base, #4 rebar and concrete IAW Detail C-17SY250$0
1050PCC Curb & Gutter Removal - Includes sawcutting, removal, hauling and proper disposal off base.LF800$0
1051PCC Curb and Gutter, Replacement and New Includes hauling, sawing, removal, proper disposal off base and replacement of existing concrete curb and gutter and/or all costs for construction of new curb and gutter IAW Detail C-13.LF1500$0
1052PCC Expansion Joints (pavement 9" or less) Includes all labor, materials and equipment to install expansion joints in PCC pavement IAW Detail J-1.LF500$0
1053PCC Expansion Joints (pavement greater than 9") Includes all labor, materials and equipment to install expansion joints in PCC pavement IAW Detail J-1.LF400$0
1054PCC Sawed Joints – Includes all labor, materials and equipment to install sawed joints in PCC pavement IAW Detail J-2.LB20000$0
1055Crack Sealing - Rout out if necessary to minimum width and depth needed, clean-out and seal random cracks in asphalt and concrete pavements IAW Detail J-4.GAL500$0
1056Joint Repair - Clean out to a depth of 6" and re-seal joints in concrete pavement IAW Detail J-3.LF4500$0
1057Crack Sealing, Airfield - Rout out if necessary to minimum width and depth needed, clean-out and seal random cracks in asphalt and concrete pavement IAW Detail J-4.LF500$0
1058Joint Resealing Airfield – Clean and seal joint in concrete pavement IAW Details J-3.LF3000$0
1059PCC Patching- Includes all work and materials necessary to patch (repair) spalled areas in existing PCC pavement IAW Detail C-18.SF800$0
10606" Subdrainage Piping - Includes excavation, filter fabric, perforated pipe, and filter stone IAW Detail D-2LF4000$0
1061Cast Iron Curb Inlet – Includes excavation, hauling, materials and installation of new Curb Inlet in accordance with Detail D-5 and Contract Specifications.EA20$0
1062Precast Concrete Manhole – Includes excavation, transportation, labor and materials to install Precast Concrete Manhole up to 5 feet in height in accordance with Detail D-4 and Contract Specifications. Height over 5 feet will be paid for as “additional depth in manhole”.EA10$0
1063Additional Depth in Manhole Includes hauling, material and installation for each vertical foot of manhole over 5 feet.VF50$0
1064Storm Sewer Inlet Adjustment Includes all work necessary to adjust existing inlet structure to new pavement elevation IAW Details D-6 and D-6a.EA12$0
1065Storm Sewer Inlet Modification Includes all work necessary to modify existing inlet structure and adjust to new pavement elevation IAW Details D-6 and D-6a.EA5$0
1066Manhole Adjustment - Includes all work and materials necessary to adjust existing manhole cover to new pavement elevation (up to 6”).Work shall include #4 bar reinforcement for a 5' square, concrete collar 6" thick.EA15$0
1067Valve Box Adjustment - Includes all work and materials necessary to adjust existing valve box to new pavement elevation (up to 6”). Work shall include a reinforced concrete collar with a minimum concrete clearence from the valve box of 6".EA30$0
106812" RCP – Includes all transportation, labor and materials to install 12" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF1000$0
106915" RCP – Includes all transportation, labor and materials to install 15" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF250$0
107018" RCP – Includes all transportation, labor and materials to install 18" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF250$0
107124" RCP – Includes all transportation, labor and materials to install 24" RCP in accordance with Contract Specifications. Referenace Detail D-3.LF250$0
10726” Dia. Fixed Bollard – Layout, drilling, installing a 6" Dia. primed, painted, concrete filled steel bollard IAW Detail B-1EA200$0
10736” Dia. Removable Bollard – Layout, drilling, installing a 6" Dia. Steel bollard, primed, painted, two stripes of reflective tape, base receiver mounted on a 6" concrete storage pad IAW Detail B-2 & B-2A. Minimum to be installed 2 ea.EA200$0
1074Striping (Paint) - Includes layout, surface preparation, and striping of lines, words or symbols with either white or yellow paint. Paint shall meet the requirements of Contract Specifications.SF40000$0
1075Striping (Thermoplastic) - Includes layout, surface preparation and striping of lines, words, or symbols with either white or yellow thermoplastic. Thermoplastic shall meet the requirements of Contract Specifications.SF20000$0
1076Painting Handicap Symbols - (white) with blue background (Pavement Marking).EA75$0
1077Standard 7 foot Concrete Bumper Blocks - Includes hauling, layout and installing (new) with 2 steel rods for in-ground placement.EA100$0
1078Pavement Markers, Class “C” Type 1 & 2 (Amber & Crystal) - All pavement markers shall be class “C” type 1 or 2 (all weather, plowable type) IAW DETAIL T-1 and the ODOT Standard Specifications for Highway Construction.EA100$0
1079Traffic Signs Installation (New) - Includes concrete footing, signs with Diamond Grade reflective sheeting and faces (stop, yield, do not enter, one way and others). Height & placement of signs shall be installed IAW Manual on Uniform Traffic Control Devices, latest edition.EA30$0
1080Relocate Existing Traffic Signs - Includes removal of existing footing and sign and reinstallation.EA35$0
1081Topsoil, 4" deep (Agriculturally suitable for supporting grass) - Includes furnishing, hauling and spreading topsoil as required in the project plan. 9 SY is equal to 1 CYSY30000$0
1082Sodding - Sodding installation shall meet the requirements of Contract Specifications.SY25000$0
1083Seeding – Seeding installation shall meet the requirements of Contract Specifications.SY25000$0
1084Saw Cutting Asphalt Pavements – Includes saw cutting asphalt pavements as shown on the construction drawings and not covered in other CLINs.IN/LF10000$0
1085Saw Cutting Concrete Pavements - Includes saw cutting concrete pavements as shown on the construction drawings and not covered in other CLINsIN/LF10000$0
1086Storm Water Pollution Prevention Measures (SWPPM) - Includes permitting, labor and materials for temporary sediment controls as specified in the WO and IAW ODOT Specifications.LF30000$0
1087Controlled Low-Strength Material, CLSM (Flowable Fill)- includes ash, cement, aggregate, water and sand necessary to provide for a 1,000 psi mix with a Minimum spread rate is 8 inches. Also includes flow test, unit weight test and compressive strength test at 28 days.CY1000$0
1088Reinforcing Steel – Includes materials and installation of reinforcing steel IAW the Contract Specifications.LB30000$0
1089Traffic Control and Phasing – All labor, equipment and materials, including all signs, signals, barracades and lights, required to direct traffic through and detour around construction zones.Job4$0
1090Sweeper – Includes all labor, equipment and materials required for mobilization, operation, demobilization and disposal of collected materials off site.Job4$0
1091Grinding PCC Pavement – Includes all labor, equipment and materials required for mobilization, operation, demobilization and surface cleaning.SY1000$0
1092PCC Manhole Collars – Includes all labor, equipment and materials required for installation.EA25$0
PAVING SECTION Sub-Total$0
LIGHTING SECTION
1093Single Arm Light Pole (500-1000 Watt) – Includes all hauling, excavation, foundation (Detail E-1), a 30' pole with single arm, fixture, and all accessories required for a complete lighting pole.EA4$0
1094Twin Arm Lighting Posts (500-1000 Watt) – Includes all hauling, excavation, foundation (Detail E-1), a 30' pole with twin arm, fixture, and all accessories required for a complete lighting pole.EA4$0
1095Remove/Reinstall Existing Light Poles - Includes removal and reinstallation of existing lighting poles. Includes excavation, rreinforcement, PVC conduit, anchor bolts, grounding rod, all necessary connections and concrete IAW Detail E-1.EA10$0
1096Trenching for Conduits <2" Diameter - Includes trenching, backfilling, compaction and buried electrical tape for duckbank as shown IAW Detail E-2.LF2,000$0
1097Trenching for Conduits >2"&<4" Diameter - Includes trenching, backfilling, compaction and buried electrical tape, for duckbank as shown IAW Detail E-2.LF2,000$0
1098Pullboxes - Includes excavation, pullbox, backfill, compaction and lid.EA40$0
1099Type EB Utility Duct (4" Diameter) - Includes EB utility duct, spacers and fittings for concrete encasement IAW Detail E-2.LF400$0
1100Type DB Utility Duct (4" Diameter) - Includes DB utility duct, spacers and fittings for direct burial IAW Detail E-3.LF400$0
1101Pavement Boring (For 6" Diameter Duct) - Includes all preparation, backfilling, and boring of empty 6” utility duct under pavement.LF400$0
1102Concrete Encased Ductbank - Includes excavation, backfilling, reinforcement and concrete for ductbank as shown IAW Detail E-2.LF400$0
1103Drilled Pier < 10 VLF; 24" Diameter -includes mobilization, drilling, concrete, reinforcement and material removal and disposal.VLF100$0
1104Drilled Pier < 10 VLF; 36" Diameter -includes mobilization, drilling, concrete, reinforcement and material removal and disposal.VLF100$0
11054 Bolt Pattern, L TYPE, Anchor Bolt Set: 1" Diameter x 24" Long -includes L type bolts, job made template, hex nut and washerEA20$0
11061" Electrical Conduit - Includes 1” PVC Schedule 40 Conduit, fittings and sweeps.LF6,500$0
1107Wiring for Electrical Conduit #10 THWN - #10 THWN installed in conduit and all connections.LF7,500$0
1108Wiring for Electrical Conduit #8 THWN - #8 THWN installed in conduit and all connections.LF7,500$0
1109Wiring for Electrical Conduit #6 THWN - #6 THWN installed in conduit and all connections.LF7,500$0
1110Wiring for Electrical Conduit #6 Copper - #6 bare copper all connections.LF1,000$0
LIGHTING Sub-Total$0
NON PREPRICED ITEMS
NPI01Non-PrePriced Line Items -includes providing, and complete installation ofany line item not covered by the above items. Numbering continues NPI-01, NPI-02, etc… These items are limited to 10% of the total cost of the contract.$0
NP102$0
NON PREPRICED Sub-Total$0
OPTION YEAR 1 TOTAL:$0

&K01+028Tinker AFB, OK &"Arial,Bold"&16Option Year 1 - Pricing &K01+028IDIQ, Base Paving

&K01+029FA8101-15-R-0001 &K01+029Page &P of &N &K01+029ITO Attachment 1.6 Line Item Pricing Matrix

Option Yr 2 Pricing

LINE ITEMDESCRIPTIONUNITQTYUNIT COSTTOTAL
20012" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 2" asphalt pavement IAW Detail A-1. (EPA Eligible)SY500$0
20022" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 2" asphalt pavement IAW Detail A-1. (EPA Eligible)SY1500$0
20034" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 4" asphalt pavement IAW Detail A-2. (EPA Eligible)SY1000$0
20044" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 4" asphalt pavement IAW Detail A-2. (EPA Eligible)SY3000$0
20056" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-3. (EPA Eligible)SY500$0
20066" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-3. (EPA Eligible)SY4000$0
20078" Asphalt Repair (Less than 200 SY ) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-4. (EPA Eligible)SY500$0
20088" Asphalt Repair (More than 200 SY) Includes removal, disposal of materials (off site), and installation of 6" asphalt pavement IAW Detail A-4. (EPA Eligible)SY1500$0
2009Asphalt Cold Milling (Up to 2 ½”) - Includes hauling and proper disposal off the Base. Work shall conform to the Contract Specifications.SY30000$0
2010Milling (Mob and Demob) - Includes delivery and set-up of machine to the Base and its removal upon completion. No payment shall be made for movement from one site to another within the Base.EA5$0
2011Asphalt Overlay (1-1/2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY5000$0
2012Asphalt Overlay (2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY20000$0
2013Asphalt Overlay (2-1/2") Includes surface preparation, asphalt overlay, hauling and compaction IAW Detail A-9. (EPA Eligible)SY15000$0
2014Asphalt Pavement Removal Includes hauling, sawing, removal of existing asphalt pavement and proper disposal off base.CY1000$0
2015Fabric Reinforcement for AC Pavement Includes preparation, installation and application of fabric reinforcement material with bituminous binder included IAW Contract Specifications.SY20000$0
20162” Asphalt Construction – Includes all hauling, sawing, removal, proper disposal of existing materials necessary, soil stabilization and the installation of 2" asphalt pavement and base IAW Detail A-1. (EPA Eligible)SY1000$0
20172” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 2" asphalt pavement IAW Detail A-5 (EPA Eligible)SY2000$0
20184” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 4" asphalt pavement IAW Detail A-6. (EPA Eligible)SY2000$0
20196” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary and the installation of 6" asphalt pavement IAW Detail A-7. (EPA Eligible)SY2000$0
20208” Asphalt Pavement – Hauling, removal, proper disposal of existing materials necessary, soil stabilization and the installation of 8" asphalt pavement IAW Detail A-8. (EPA Eligible)SY1000$0
20214” Asphalt Trail Construction – Hauling, removal, the proper disposal of existing materials necessary for installation of 4" stabilized aggregate and 4" asphalt pavement on a compacted subgrade IAW Detail A-10. (EPA Eligible)SY2500$0
20222” Asphalt Sidewalk Construction – Hauling, removal, the proper disposal of existing materials necessary for installation of 4" of stabilized aggregate and 2" asphalt pavement on a compacted subgrade IAW Detail A-11. (EPA Eligible)SY300$0
2023Asphalt Seal Coat - Includes surface cleaning and applying two 12-15 mil seal coats IAW Contract Specifications.SY25000$0
2024PCC Pavement Removal - Includes hauling, sawing, breaking, removal, proper disposal of existing PCC pavement.CY1500$0
2025Asphalt Speed Table - Includes all equipment, labor and materials necessary to install asphalt speeds tables IAW Detail A-12 (EPA Eligible)SY200$0
20266" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 6" concrete pavement IAW Detail C-1.SY500$0
20276" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 6" concrete pavement IAW Detail C-1.SY1000$0
20289" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" concrete pavement IAW Detail C-2.SY500$0
20299" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" concrete pavement IAW Detail C-2.SY3000$0
20309" TO 14" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" to 14" concrete pavement IAW Detail C-3.SY500$0
20319" to 14" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 9" to 14" concrete pavement IAW Detail C-3.SY2000$0
203215" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 15" concrete pavement IAW Detail C-4.SY1000$0
203315" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 15" concrete pavement IAW Detail C-4.SY2000$0
203418" to 24" PCC Pavement Repair (Less than 50 SY ea) Includes removal, proper disposal (off site), and replacement of 18" to 24" concrete pavement IAW Detail C-5.SY1500$0
203518" to 24" PCC Pavement Repair (over 50 SY ea) Includes removal, proper disposal (off site), and replacement of 18" to 24" concrete pavement IAW Detail C-5.SY2500$0
2036Soil stabilization - Includes hauling, spreading, scarifying and compaction using hydrated lime at 4% mix by weight, 12" deep.SY9000$0
2037Site Preparation – Includes surveying, staking, layout, stockpiling topsoil if necessary, and proctor testing IAW Contract Specifications. This line item is only used when grading and elevations in new work are required.SY15000$0
2038Stabilized Aggregate Base- Includes hauling, spreading and compaction to 95% standard density. A cubic yard is equal to 6 square yards 6" deep. Alternate price is $ 10.34 a square yard.CY10000$0
20396" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 6" concrete installation IAW Detail C-6.SY1000$0
20409" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 9" concrete installation IAW Detail C-7.SY1000$0
204112" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 12" concrete installation IAW Detail C-8.SY1000$0
204218" PCC Airfield Pavement Construction Includes all site preparation, subgrade preparation, aggregate base installation, and 18" concrete installation IAW Detail C-9.SY1000$0
20438" PCC Street Pavement Includes all site preparation, subgrade preparation, and 8" concrete installation IAW Detail C-10.SY800$0
20446" PCC Street Pavement Includes all site preparation, subgrade preparation, and 6" concrete installation IAW Detail C-11.SY600$0
2045PCC Sidewalk (Construction & Repair) - Includes hauling, sawing, removal, proper disposal of existing material as necessary for installation of concrete and base material IAW Detail C-12.SY500$0
2046Handicap Ramps, Type “A” Includes sawing, removal, proper disposal and hauling of existing materials as necessary for construction of new concrete handicap ramps IAW Detail C-15.SY200$0
2047Handicap Ramps, “Type “B” Includes sawing, removal, proper disposal and hauling of existing materials as necessary for construction of new concrete handicap ramps IAW Detail C-16.SY200$0
2048P.C. Concrete Flume – Includes hauling, installation and compaction of materials for a concrete flume IAW Detail C-14.LF100$0
2049PCC Speed Table -Includes layout, sawing pavement, excavation, hauling, installation of 8" compacted aggregate base, #4 rebar and concrete IAW Detail C-17SY250$0
2050PCC Curb & Gutter Removal - Includes sawcutting, removal, hauling and proper disposal off base.LF800$0
2051PCC Curb and Gutter, Replacement and New Includes hauling, sawing, removal, proper disposal off base and replacement of existing concrete curb and gutter and/or all costs for construction of new curb and gutter IAW Detail C-13.LF1500$0
2052PCC Expansion Joints (pavement 9" or less) Includes all labor, materials and equipment to install expansion joints in PCC pavement IAW Detail J-1.LF500$0
2053PCC Expansion Joints (pavement greater than 9") Includes all labor, materials and equipment to install expansion joints in PCC pavement IAW Detail J-1.LF400$0
2054PCC Sawed Joints – Includes all labor, materials and equipment to install sawed joints in PCC pavement IAW Detail J-2.LB20000$0
2055Crack Sealing - Rout out if necessary to minimum width and depth needed, clean-out and seal random cracks in asphalt and concrete pavements IAW Detail J-4.GAL500$0
2056Joint Repair - Clean out to a depth of 6" and re-seal joints in concrete pavement IAW Detail J-3.LF4500$0
2057Crack Sealing, Airfield - Rout out if necessary to minimum width and depth needed, clean-out and seal random cracks in asphalt and concrete pavement IAW Detail J-4.LF500$0
2058Joint Resealing Airfield – Clean and seal joint in concrete pavement IAW Details J-3.LF3000$0
2059PCC Patching- Includes all work and materials necessary to patch (repair) spalled areas in existing PCC pavement IAW Detail C-18.SF800$0
20606" Subdrainage Piping - Includes excavation, filter fabric, perforated pipe, and filter stone IAW Detail D-2LF4000$0
2061Cast Iron Curb Inlet – Includes excavation, hauling, materials and installation of new Curb Inlet in accordance with Detail D-5 and Contract Specifications.EA20$0
2062Precast Concrete Manhole – Includes excavation, transportation, labor and materials to install Precast Concrete Manhole up to 5 feet in height in accordance with Detail D-4 and Contract Specifications. Height over 5 feet will be paid for as “additional depth in manhole”.EA10$0
2063Additional Depth in Manhole Includes hauling, material and installation for each vertical foot of manhole over 5 feet.VF50$0
2064Storm Sewer Inlet Adjustment Includes all work necessary to adjust existing inlet structure to new pavement elevation IAW Details D-6 and D-6a.EA12$0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .