SOLICITATION TAFB PAVING IDIQ Federal contract opportunity
Solicitation number
FA8101-15-R-0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

RFP FA8101-15-R-0001

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION TAFB PAVING IDIQ, newest first.
File Type Posted
FA8101-15-R-0001-0002.pdf PDF
PAV_-_2_TAFB_Paving_Standard_Details_2015_-_Combined_REVISION_1.pdf PDF
ITO_-_Attachment_1.6_Line_Item_Pricing_Matrix_2015-03-24_REVISION_1.xlsx XLSX spreadsheet
FA8101-15-R-0001_Q-As_Dated_2015-03-24.pdf PDF
Paving_IDIQ_Pre-Proposal_Sign-In_2015-03-12.pdf PDF
Paving_IDIQ_Pre-Proposal_Brief_2015-03-12.pdf PDF
FA8101-15-R-0001-0001.pdf PDF
Section_L_Base_Paving_2015-02-09.pdf PDF
SMPL_-_2_Sample_Project_WWYK100217__Drawings.pdf PDF
ITO_-_Attachment_1.1_2015-02-09.docx DOCX document
ITO_-_Attachment_1.5_2015-02-09.docx DOCX document
ITO_-_Attachment_1.7_2015-02-09.xlsx XLSX spreadsheet
ITO_-_Attachment_1.4_2015-02-09.docx DOCX document
PAV_-_2_TAFB_Paving_Standard_Details_2015_-_Combined.pdf PDF
PAV_-_1_TAFB_Paving_Technical_Specification_2015_-_Combined.pdf PDF
ITO_-_Attachment_1.6_Line_Item_Pricing_Matrix_2015-02-09.xlsx XLSX spreadsheet
PAV_-_3_TAFB_Paving_IDIQ_Submittal_form_66_-_2014-06-09.pdf PDF
ITO_-_Attachment_1.3_2015-02-09.docx DOCX document
ITO_-_Attachment_1.2_2015-02-09.docx DOCX document
INT_-_2_Initial_DO_Contractor_Staging_Area_Photos.pdf PDF
Section_M_Base_Paving_2015-02-09.pdf PDF
SMPL_-_1_Sample_Project_WWYK100217_Statement_of_Work_(SOW).pdf PDF
ITO_-_Attachment_1.0_2015-02-09.docx DOCX document
INT_-_1_Initial_DO_Statement_of_Work_(SOW).pdf PDF
WD_-_1_Wage_Determination_OK150015_01-02-2015.pdf PDF
SMPL_-_3_Sample_Project_WWYK100217__Submittal_Form_66.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. 100% SET A-SIDE: RESERVED FOR SECTION 8(a) PROGRAM FOR QUALIFIED 8(a) COMPANIES LOCATED IN REGION VI (ARKANSAS, LOUISIANA, NEW MEXICO, OKLAHOMA and TEXAS) ONLY

B. PROJECT TITLE: TINKER AFB PAVING INDEFINATE DELIVERY INDEFINATE QUANTITY (IDIQ)

C. THE INTENT OF THE GOVERNMENT IS TO AWARD A SINGLE AWARD TO THE OFFEROR, WHOSE PROPOSAL, CONFORMING TO THE

SOLICITATION, IS DETERMINED TO PROVIDE THE BEST VALUE TO THE GOVERNMENT

D. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE: 237310; SIZE STANDARD: $36.5M

E. PERIOD OF PERFORMANCE: ONE (1) YEAR BASE CONTRACT AND THREE (3) ONE (1) YEAR OPTIONS

F. MINIMUM GUARANTEED DOLLAR AMOUNT FOR LIFE OF THE CONTRACT: $5,000.00

MAXIMUM DOLLAR AMOUNT FOR LIFE OF THE CONTACT: $43,300,000.00

ELIZABETH FIKES 405-739-3517

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

11-Feb-2015

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________12 Mar 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______240 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

AFSC/PZIOCA

ELIZABETH FIKES/405-739-3517

7858 5TH ST STE 1

TINKER AFB OK 73145-9125

FA8101

PAGE OF PAGES

1 OF

CODE FA8101

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

AFSC/PZIOCA

REGINE N. HAZELETT/405-739-3515

7858 5TH ST STE 1

TINKER AFB OK 73145

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

405-739-4989FAX:TEL: 405-739-3517 TEL: 405-739-3515 FAX:

FA8101-15-R-0001 91

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA8101-15-R-0001

Section A - Solicitation/Contract Form

GENERAL NOTES TO OFFERORS

1. Type of Contract: An Indefinite Delivery Indefinite Quantity (IDIQ) Contract with Fixed Price – Economical

Price Adjustment (FP-EPA) Pre-Priced Line Items will result from this solicitation. The IDIQ contract will be for a one year basic period with three one-year options. The maximum aggregate amount of the TAFB Paving IDIQ contract shall not exceed $43,300,000.00. Note that the Total Evaluated Price (TEP) of the offeror’s ITO Section L

Attachment #1.6 Paving Pricing Matrix is for evaluation purposes only and is not related to the total maximum aggregate value of the contract. The awardee will receive an initial delivery order for the TAFB Paving IDIQ for the minimum guarantee. The minimum guarantee will be the fixed amount of $5,000.00 to cover the expenses of attending the post award conference. The post award conference will be conducted approximately 14 days after contract award and will be held at Base Construction Contracting in building 3, Tinker AFB OK, 73145. The

Government will provide the post award conference date approximately seven days after contract award.

2. Schedule CLINs/SUBCLINs (Section B): There will be no pricing on the Contract Line Items (CLINS) in

Section B. The offeror shall propose fixed pre-priced line items utilizing the ITO Section L Attachment #1.6 Paving

Pricing Matrix for the base period and each option year to be used for the duration of the contract period.

3. Magnitude of Construction: In accordance with DFARS 236.204, Disclosure of the Magnitude of Construction

Projects, the estimated price range for this contract is between $25,000,000.00 to $100,000,000.00.

4. Contract Period: This is an IDIQ Contract for Tinker Air Force Base (TAFB) Paving. The performance period for the basic contract will be for a one- year base period and three, one- year options.

5. Performance Period(s) for Individual Delivery Orders: Performance periods shall be negotiated for each individual delivery order.

6. Pre-proposal Conference & Initial Site Visit: A pre-proposal conference and Tinker AFB tour for this acquisition will be conducted on 24 February 2015 from 9:00 a.m. to 12:30 p.m. The conference will be held at

Rose State College Professional Training Center, 1720 Hudiburg Drive, Midwest City, Oklahoma 73110. A bus will be used to transport all conference attendees onto the base for a base tour and a site visit for the sample project and will be returned to the conference site after completion of the tour.

Attendees are directed to notify A1C Regine Hazelett by e-mail at regine.hazelett@us.af.mil or call (405) 739-3367 before 20 February 2015, 1:00 p.m. if they plan to attend. Failure to notify could result in non-availability of transportation. All offerors are strongly urged to attend. All personnel attending will need to have in their possession a valid driver’s license or valid personal identification with photo and be able to pass a background check if required.

Pre-proposal confernce will be conducted to introduce the Government key personnel involved and general information concerning the source selection process. Base Tour “window tour” will be conducted to show all attendees the general size of the base with typical areas of work for this contract and to afford all attendees the opportunity to view and inspect the site where the sample project work is to be proposed and to satisfy themselves as to all general and local conditions that may affect the offerors technical approach of the project (Section L, Pgh 3.2.2

Technical Subfactor 1: Project Development and Execution of Sample Project). During this sample project site visit, only general questions are to be asked to the project manager or contracting officer. It is requested that all attendees submit written questions or concerns of the solicitation and sample project not later than 02 March 2015 to ensure that all parties are afforded the opportunity to see the question and answer (Q&A) that will be posted on

FedBizOpps.

IMPORTANT NOTE: ALL OFFERORS WILL BE LIMITED TO NO MORE THAN 4 INDIVIDUALS PER

PRIME (to include Sub-Contractors invited by the Prime) FOR ATTENDING THE PRE-PROPOSAL

CONFERENCE AND BASE TOUR.

7. Technical Specifications and Drawings: The technical specifications and drawings, referenced in Section J as attachments to this solicitation, have been prepared by the Base Civil Engineer. Any and all questions regarding these specifications and/or drawings must be submitted in writing to the Contract Specialist identified in Block 7 of the SF 1442. Any information obtained outside this procedure and acted upon may cause the resultant offeror to be non-responsive. Any and all questions received from industry will be responded by amendment to the solicitation.

Issuance of the amendment will incorporate all the terms and conditions into a resultant award.

8. Wage determinations: The most current prevailing Davis Bacon Wage Determination shall be incorporated with the solicitation for each task order. It is anticipated that the most common Wage Determination is construction type:

Building. The Davis Bacon Wage Determinations in effect at the issuance of this solicitation are found in Section J for reference purposes only. Cited on individual delivery orders.

9. Amendment Acknowledgement: It is the offeror’s responsibility to be aware of amendments, as made available.

Acknowledgement of amendments is required by the offeror in accordance with the instructions provided in Block

11 of SF 30, Amendment of Solicitation. Offerors that fail to acknowledge amendments may be considered ineligible for award.

10. Acceptance Period: Attention is invited to Blocks 13D and 17 of the SF 1442. IAW Block 17, the number inserted must be equal to or greater than the number of days listed in Block 13D.

11. Instruction to Offeror: The Offeror must adhere to the Instructions to Offeror (ITO) in Section L of the SF

1442.

12. Multiple Delivery Order Expectations: Offerors are advised of the necessity for the government to solicit multiple delivery order requirements at any given time in support of its mission. Any offeror proposing on this

TAFB Paving requirement is hereby fully notified of the government’s likeliness of multiple delivery order requirements and the contractor’s expected responsibility for support of the multiple delivery order awards simultaneously

13. Representation and Certifications: If already registered in System for Award Managemen (SAM) at www.sam.gov, the offeror is not required to fill out the representations and certifications that are within SAM;

however, section K clauses in the RFP not included in offeror’s SAM registration must be filled out within the solicitation.

14. Economic Price Adjustment (EPA): EPA provides for the upward and downward revision of the TAFB Paving

IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-base products listed on the TAFB Paving Line Item Pricing Matrix (Attachment 1.6 of Section L) as follows: Line Item Numbers

0001–0008, 0011–0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–3008, 3011–3013, 3016–3022, and 3025.

15. Required Insurance: In accordance with (IAW) FAR 28.306 (Insurance Under Fixed-Price Contracts)) and

52.228-5(a) (Insurance – Work on a Government Installation) the coverage specified in FAR 28.307-2 (Liability), the Contractor shall, at its own expense, procure and thereafter maintain the following minimum kinds of insurance with respect to performance under the contract:

(a) Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and

State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.

http://www.sam.gov/

(b) General liability. (1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence. (2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.

(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

16. Truck Entry Gate Notice: Tinker Air Force Base has constructed a “Truck Entry Gate” (Gate 33), which is located at the corner of 59th Street and Air Depot Blvd (southwest corner of the base). The gate will be opened beginning 15 September 2004.

Gate 33 shall be used for all deliveries by truck to this base.

(Trucks will not be allowed to gain access through any other gate.)

Since your firm’s delivery on this order is affected, please advise your delivery carrier to use the new gate. This should minimize the impact of your delivery.

DELIVERIES TO BUILDING 3001 (B3001)

Be advised that delivery vehicles destined for B3001 are prohibited from using “Staff Drive”.

Delivery vehicles may make deliveries only in designated unloading areas.

Since your firm’s delivery may be affected, ensure that your delivery carrier receives proper instructions on delivery

/ unloading requirements for B3001. Unloading in designated unloading areas will minimize any inconvenience, and, attendant ramifications, which may accrue, to your delivery / delivery carrier for failure to adhere to this requirement.

17. Contract Government Holidays: Government holiday observances – No contractor work will be conducted on these days; accordingly, the Government will not be billed for such holidays except when services are required by the Government and are actually performed on a holiday. Holidays in addition to those reflected in this contract, which are designated by the Government, will be billable provided the assigned Contractor employee was available for performance and was precluded from such performance.

The following days are Contract Government Holidays: New Year’s Day, Martin Luther King, Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving

Day, Christmas Day.

18. Notice to Offeror: The Government reserves the right to cancel this solicitation, either before or after the closing date.

19. Point of Contact: All questions shall be submitted to POC’s Elizabeth Fikes, Contracting Officer or A1C

Regine Hazelett via email at elizabeth.fikes@us.af.mil or regine.hazelett@us.af.mil on company letterhead paper.

Please ensure that all questions reach the POC 10 days prior to the solicitation closing date.

Any and all questions regarding this requirement shall be submitted to both the Contracting Specialist, A1C Regine

Hazelett via email: regine.hazelett@us.af.mil and Contracting Officer, Elizabeth Fikes via email:

elizabeth.fikes@us.af.mil. Please ensure that any questions reach the Contracting Officer, 10 days prior to the solicitation closing date.

mailto:elizabeth.fikes@us.af.mil mailto:regine.hazelett@us.af.mil

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 UNDEFINED

BASIC YEAR - PAVING IDIQ

FP-EPA

Basic Year Delivery from xx Month 2015 to xx Month 2016

FOB: Destination

SIGNAL CODE: A

MAX NET AMT

UNIT UNIT PRICE MAX AMOUNT

0001AA UNDEFINED Lot

STREET, SIDEWALK, BRIDGE, RUNWAY CONST

FP-EPA

The Tinker AFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of streets, roads, airport runways, public sidewalks, bridges and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment

(EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW

FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the TAFB Paving Line Item Pricing Matrix

(Attachment 1.6 of Section L) as follows: Line Item Numbers 0001–0008, 0011–

0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–3008, 3011–3013, 3016–3022, and 3025.

IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

NSN: Y1LB-15-PAV-IDIQ

UNIT UNIT PRICE MAX AMOUNT

0001AB UNDEFINED Lot

POURED CONCRETE FOUNDATION AND STRUCTURE

FP-EPA

The TAFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of foundations, footings, structural elements and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment (EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in

FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the

TAFB Paving Line Item Pricing Matrix (Attachment 1.6 of Section L) as follows:

Line Item Numbers 0001–0008, 0011–0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–

3008, 3011–3013, 3016–3022, and 3025. IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

NSN: Z2QA-15-PAV-IDIQ

UNIT UNIT PRICE MAX AMOUNT

0002 1 Lot

MINIMUM GUARANTEE PAYMENT

FFP

The awardee will receive an initial delivery order for the TAFB Paving IDIQ for the minimum guarantee. The minimum guarantee will be the fixed amount of

$5,000.00 to accomplish the requirements of the initial delivery order statement of work. A post award conference will be conducted approximately 14 days after contract award and will be held at Base Construction Contracting in building 3, Tinker AFB OK, 73145. The Government will provide the post award conference date approximately seven days after contract award.

FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

1001 UNDEFINED

OPTION OPTION YEAR I - PAVING IDIQ

FP-EPA

Option Year I Delivery from xx Month 2016 to xx Month 2017

UNIT UNIT PRICE MAX AMOUNT

1001AA UNDEFINED Lot

OPTION STREET, SIDEWALK, BRIDGE, RUNWAY CONST

FP-EPA

The Tinker AFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of streets, roads, airport runways, public sidewalks, bridges and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment

(EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW

FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the TAFB Paving Line Item Pricing Matrix

(Attachment 1.6 of Section L) as follows: Line Item Numbers 0001–0008, 0011–

0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–3008, 3011–3013, 3016–3022, and 3025.

IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

1001AB UNDEFINED Lot

OPTION POURED CONCRETE FOUNDATION AND STRUCTURE

FP-EPA

The TAFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of foundations, footings, structural elements and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment (EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in

FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the

TAFB Paving Line Item Pricing Matrix (Attachment 1.6 of Section L) as follows:

Line Item Numbers 0001–0008, 0011–0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–

3008, 3011–3013, 3016–3022, and 3025. IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

2001 UNDEFINED

OPTION OPTION YEAR II - PAVING IDIQ

FP-EPA

Option Year II Delivery from xx Month 2017 to xx Month 2018

UNIT UNIT PRICE MAX AMOUNT

2001AA UNDEFINED Lot

OPTION STREET, SIDEWALK, BRIDGE, RUNWAY CONST

FP-EPA

The Tinker AFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of streets, roads, airport runways, public sidewalks, bridges and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment

(EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW

FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the TAFB Paving Line Item Pricing Matrix

(Attachment 1.6 of Section L) as follows: Line Item Numbers 0001–0008, 0011–

0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–3008, 3011–3013, 3016–3022, and 3025.

IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

2001AB UNDEFINED Lot

OPTION POURED CONCRETE FOUNDATION AND STRUCTURE

FP-EPA

The TAFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of foundations, footings, structural elements and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment (EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in

FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the

TAFB Paving Line Item Pricing Matrix (Attachment 1.6 of Section L) as follows:

Line Item Numbers 0001–0008, 0011–0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–

3008, 3011–3013, 3016–3022, and 3025. IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

3001 UNDEFINED

OPTION OPTION YEAR III - PAVING IDIQ

FP-EPA

Option Year III Delivery from xx Month 2018 to xx Month 2019

UNIT UNIT PRICE MAX AMOUNT

3001AA UNDEFINED Lot

OPTION STREET, SIDEWALK, BRIDGE, RUNWAY CONST

FP-EPA

The Tinker AFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of streets, roads, airport runways, public sidewalks, bridges and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment

(EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW

FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the TAFB Paving Line Item Pricing Matrix

(Attachment 1.6 of Section L) as follows: Line Item Numbers 0001–0008, 0011–

0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–3008, 3011–3013, 3016–3022, and 3025.

IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

3001AB UNDEFINED Lot

OPTION POURED CONCRETE FOUNDATION AND STRUCTURE

FP-EPA

The TAFB Paving IDIQ Contract Program work may involve a broad range of maintenance, repair, alteration and construction of foundations, footings, structural elements and other paving methods. The work to be performed under the terms of the proposed basic contract and project delivery orders will consist of furnishing all plant, labor, equipment, tools, materials, transportation and incidentals necessary to construct, repair, and maintain paving methods on Tinker AFB and shall meet the SOS requirements for the basic contract and the individual project delivery orders. Economic Price Adjustment (EPA) provides for the upward and downward revision of the TAFB Paving IDIQ fixed price line items based on material cost changes beyond the Contractor’s control. The procedures set forth in

FAR Clause 52.216-4 shall be used for submission and approval of economic price adjustments under this contract. IAW FAR 52.216-4(c)(1)(ii) the only materials subject to the adjustments are the petroleum-based products listed on the

TAFB Paving Line Item Pricing Matrix (Attachment 1.6 of Section L) as follows:

Line Item Numbers 0001–0008, 0011–0013, 0016–0022, 0025, 1001–1008, 1011–1013, 1016–1022, 1025, 2001–2008, 2011–2013, 2016–2022, 2025, 3001–

3008, 3011–3013, 3016–3022, and 3025. IAW FAR 52.216-4(c)(4) the aggregate increase in the above line items unit price shall not exceed 10% of original base or the current option year price.

FOB: Destination

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 $5,000.00 999,999,999,999.00 $43,300,000.00

CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and

CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

CLIN

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0001 0.00 $0.00 0.00 $0.00

0001AA 0.00 $0.00 0.00 $0.00

0002 1.00 $5,000.00 1.00 $5,000.00

1001 0.00 $0.00 0.00 $0.00

1001AA 0.00 $0.00 0.00 $0.00

2001 0.00 $0.00 0.00 $0.00

2001AA 0.00 $0.00 0.00 $0.00

3001 0.00 $0.00 0.00 $0.00

3001AA 0.00 $0.00 0.00 $0.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0001AA

0001AB

1001AA

1001AB

2001AA

2001AB

3001AA

3001AB

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0001AA Destination Government Destination Government

0001AB Destination Government Destination Government

0002 Destination Government Destination Government

1001 Destination Government Destination Government

1001AA Destination Government Destination Government

1001AB Destination Government Destination Government

2001 Destination Government Destination Government

2001AA Destination Government Destination Government

2001AB Destination Government Destination Government

3001 Destination Government Destination Government

3001AA Destination Government Destination Government

3001AB Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 N/A N/A N/A N/A

0001AA 365 dys. ADC N/A

0001AB 365 dys. ADC N/A

0002 30 dys. ADC 1 N/A

1001 N/A N/A N/A N/A

1001AA N/A N/A N/A N/A

1001AB N/A N/A N/A N/A

2001 N/A N/A N/A N/A

2001AA N/A N/A N/A N/A

2001AB N/A N/A N/A N/A

3001 N/A N/A N/A N/A

3001AA N/A N/A N/A N/A

3001AB N/A N/A N/A N/A

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees MAY 2014

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-6 Alt I Restrictions On Subcontractor Sales To The Government

(Sep 2006) -- Alternate I

OCT 1995

52.203-7 Anti-Kickback Procedures MAY 2014

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-14 Display of Hotline Poster(s) DEC 2007

52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-2 Security Requirements AUG 1996

52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management JUL 2013

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards

JUL 2013

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

AUG 2013

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

DEC 2014

52.211-13 Time Extensions SEP 2000

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011

52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010

52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010

52.215-15 Pension Adjustments and Asset Reversions OCT 2010

52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997

52.215-19 Notification of Ownership Changes OCT 1997

52.215-21 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data -- Modifications

OCT 2010

52.215-22 Limitations on Pass-Through Charges--Identification of

Subcontract Effort

OCT 2009

52.215-23 Limitations on Pass-Through Charges OCT 2009

52.217-5 Evaluation Of Options JUL 1990

52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

OCT 2014

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-8 Utilization of Small Business Concerns OCT 2014

52.222-1 Notice To The Government Of Labor Disputes FEB 1997

52.222-3 Convict Labor JUN 2003

52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014

52.222-7 Withholding of Funds MAY 2014

52.222-8 Payrolls and Basic Records MAY 2014

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) MAY 2014

52.222-12 Contract Termination-Debarment MAY 2014

52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility MAY 2014

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-30 Construction Wage Rate Requirements--Price Adjustment

(None or Separately Specified Method)

MAY 2014

52.222-35 Equal Opportunity for Veterans JUL 2014

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014

52.222-37 Employment Reports on Veterans JUL 2014

52.222-38 Compliance With Veterans' Employment Reporting

Requirements

SEP 2010

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons FEB 2009

52.222-54 Employment Eligibility Verification AUG 2013

52.223-1 Biobased Product Certification MAY 2012

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-4 Recovered Material Certification MAY 2008

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-9 Alt I Estimate of Percentage of Recovered Material Content for

EPA-Designated Items (May 2008) Alternate I

MAY 2008

52.223-11 Ozone-Depleting Substances MAY 2001

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.223-19 Compliance with Environmental Management Systems MAY 2011

52.224-1 Privacy Act Notification APR 1984

52.224-2 Privacy Act APR 1984

52.225-11 Buy American--Construction Materials Under Trade

Agreements

MAY 2014

52.225-11 Alt I Buy American-Construction Materials Under Trade

Agreements (NOV 2013) Alternate I

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction

Materials Under Trade Agreements

MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.226-1 Utilization Of Indian Organizations And Indian-Owned

Economic Enterprises

JUN 2000

52.227-1 Authorization and Consent DEC 2007

52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.227-23 Rights to Proposal Data (Technical) JUN 1987

52.228-1 Bid Guarantee SEP 1996

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets JAN 2012

52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014

52.228-14 Irrevocable Letter of Credit NOV 2014

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes FEB 2013

52.229-4 Federal, State, And Local Taxes (State and Local

Adjustments)

FEB 2013

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-17 Interest MAY 2014

52.232-23 Assignment Of Claims MAY 2014

52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984

52.232-25 Prompt Payment JUL 2013

52.232-27 Prompt Payment for Construction Contracts MAY 2014

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.233-1 Disputes MAY 2014

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-16 Quantity Surveys APR 1984

52.236-16 Alt I Quantity Surveys (Apr 1984) - Alternate I APR 1984

52.236-17 Layout of Work APR 1984

52.236-21 Specifications and Drawings for Construction FEB 1997

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -

Alternate I

APR 1984

52.236-26 Preconstruction Conference FEB 1995

52.236-27 Site Visit (Construction) FEB 1995

52.236-28 Preparation of Proposals--Construction OCT 1997

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.243-4 Changes JUN 2007

52.243-5 Changes and Changed Conditions APR 1984

52.243-6 Change Order Accounting APR 1984

52.244-6 Subcontracts for Commercial Items OCT 2014

52.245-1 Government Property APR 2012

52.245-9 Use And Charges APR 2012

52.246-12 Inspection of Construction AUG 1996

52.246-21 Warranty of Construction MAR 1994

52.246-21 Alt I Warranty of Construction (Mar 1994) - Alternate I APR 1984

52.247-34 F.O.B. Destination NOV 1991

52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984

52.249-10 Alt I Default (Fixed-Price Construction) (Apr 1984) Alternate I APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7004 Display of Fraud Hotline Poster(s) DEC 2012

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991

252.209-7001 Disclosure of Ownership or Control by the Government of a

Terrorist Country

JAN 2009

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Terrorist Country

DEC 2014

252.215-7000 Pricing Adjustments DEC 2012

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010

252.223-7001 Hazard Warning Labels DEC 1991

252.223-7004 Drug Free Work Force SEP 1988

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013

252.225-7008 Restriction on Acquisition of Specialty Metals MAR 2013

252.225-7012 Preference For Certain Domestic Commodities FEB 2013

252.225-7017 Photovoltaic Devices JAN 2014

252.225-7018 Photovoltaic Devices--Certificate JAN 2014

252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business

Concerns

SEP 2004

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.236-7005 Airfield Safety Precautions DEC 1991

252.236-7006 Cost Limitation JAN 1997

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment DEC 2012

252.247-7023 Transportation of Supplies by Sea APR 2014

252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

(a) Definitions. As used in this provision--

Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian

Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.

Federal contracts and grants with total value greater than $10,000,000 means--

(1) The total value of all current, active contracts and grants, including all priced options; and

(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).

Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).

(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than

$10,000,000.

(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:

(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:

(i) In a criminal proceeding, a conviction.

(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.

(iii) In an administrative proceeding, a finding of fault and liability that results in--

(A) The payment of a monetary fine or penalty of $5,000 or more; or

(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.

(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.

(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management database via https://www.acquisition.gov (see 52.204-7).

(End of provision)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the end of the period of performance specified in easch project delivery order . The time stated for completion shall include final cleanup of the premises.

(End of clause) https://www.acquisition.gov/

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $243.00 or other specified amount in individual project delivery order for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.216-4 ECONOMIC PRICE ADJUSTMENT--LABOR AND MATERIAL (JAN 1997)

(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the rate of pay for labor (including fringe benefits) or the unit prices for material shown in the Schedule either increase or decrease. The

Contractor shall furnish this notice within 60 days after the increase or decrease, or within any additional period that the Contracting Officer may approve in writing, but not later than the date of final payment under this…