Atch 11 - past perf inform.doc

DOC document 31 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA8101-09-R-0021
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Attachment 11 to FA8101-09-R-0021

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
MACC SOW WWYK070088 Revision 5.pdf PDF
RFI Response 168.doc DOC document
FA8101-09-R-0021-0009.pdf PDF
RFI Response 161-166.doc DOC document
SOW070244 SOW Rev 3.pdf PDF
FA8101-09-R-0021-0008.doc DOC document
SOW070088 SOW Rev 4.pdf PDF
Question-Answers #5 to FBO.pdf PDF
2009 Base Facility Standard with 2007 ACP Included in Chap 13.pdf PDF
Electrical Base Stds 2007.pdf PDF
070094 Dwg M3 00 redline Rev 2.pdf PDF
MACC Curtain Wall Model-1.pdf PDF
fa8101-09-r-0021-0004.doc DOC document
070094 Spec 01110 - Rev 1.pdf PDF
070295 Spec 01 11 00 - Rev 1.pdf PDF
070085 Spec 01 11 00 - Rev 1.pdf PDF
070088 SOW - Rev 1.pdf PDF
060367 Dwgs - Rev 1.pdf PDF
070088.zip ZIP file
060367 Spec 01 11 00 - Rev 1.pdf PDF
070244 SOW - Rev 1.pdf PDF
Amendment 0002.pdf PDF
070244 As-Builts 1.zip ZIP file
MACC Presolicitation Bus Tour 7-16-09.pdf PDF
SEED PROJECT PRICING Revision 1 7AUG.pdf PDF
Ventilation Bldg 3001 Tinker.doc DOC document
Asbuilts 950028 AHU_5-6-7.pdf PDF
Pre-Proposal Charts - Final.ppt PPT presentation
070244 Spec 09612.pdf PDF
B3001 070094 KTR Route.pdf PDF
060367 AF66 Rev 1.pdf PDF
070295 AF66 Rev 1.pdf PDF
070094 AF66 Rev 1.pdf PDF
070244 AF66 Rev 1.pdf PDF
back shop foot print.xlsx XLSX spreadsheet
070088 AF66 Rev 1.pdf PDF
Attachment14C.zip ZIP file
Attachment14.zip ZIP file
Attachment14B.zip ZIP file
Attachment 1 - Current Davis Bacon Wage.pdf PDF
Attachment 17.zip ZIP file
Attachment 16.zip ZIP file
Attachment 15.zip ZIP file
Attachment 12.zip ZIP file
Attachment 13.zip ZIP file
SEED PROJECT PRICING.docx DOCX document
Atch 4 - POC listing.doc DOC document
AF 66 SAMPLE.pdf PDF
Atch 8 - subteam consent to release PP info to prime.doc DOC document
Atch 9 - PP Questionnaire.doc DOC document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 11

PAST PERFORMANCE INFORMATION

Provide the information requested in this form for each contract/program accomplished or currently underway with in the past 36 months from the date of the solicitation. Provide frank, concise comments regarding your performance on the contracts you identify. Provide a separate completed form for each contract/program submitted. Limit the number of past efforts submitted and the length of each submission to the limitations set forth at paragraphs C9, C10 and section F, respectively, of Section L of this solicitation. (NOTE: This two page form does count in the number of pages for this Volume.)

A.

Offeror Name (Company/Division):

CAGE Code:

DUNS Number:

(NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant acquisition is impacted by any company/corporate organizational change, note those changes. Reference conditions regarding change in Organizational Structure Change History in Section L, paragraph F6.)

B.

Program/Project Title:

C.

Contract Specifics:

1. Contracting Agency or Customer _____________________________________________

2. Contract Number

3. Contract Type __________________________

4. Period of Performance __________________________

5. Original Contract $ Value _________________ (plus unexercised options)

6. Current Contract $ Value _________________ (plus unexercised options)

7. If Amounts for 5 and 6 above are different, provide a brief description of the reason ____________________________________________________________________________________________________________________________________________________________________________________________________ D.

Brief Description of Effort as __Prime or __Subcontractor

Provide a short specific detail discussion for each contract listed, why or how you consider that effort relevant or similar to the effort required by this solicitation

E.

Completion Date:

1. Original date:

2. Current Schedule: ____________________

3. Estimate at Completion: ____________________

4. How Many Times Changed: ____________________

5. Primary Causes of Change: ______________________________________________________________

F.

Primary Customer Points of Contact: (For Government contracts, provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles).

1. Program Manager and/or Name

Site Manager

Office

Address

Telephone

FAX Number

2. Contracting Officer:

FAX Number

3. Administrative

Contracting Officer:

FAX Number G.

Offerors shall provide a narrative explaining what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a little or no confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror shall clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a higher confidence candidate. For example, submittal of quality performance indicators or other management indicators that clearly support that an offeror has overcome past problems is required. Offerors shall attach an additional sheet(s) for this effort.

H. Provide any information currently available (letters, customer survey, independent surveys, etc) which demonstrates customer satisfaction with overall job performance and quality of completed work for the same or similar type contract. Offerors shall attach an additional sheet(s) for this effort.

I. Explain any corrective actions taken in the past for substandard performance or any current performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc.

J. Offerors shall attach a copy of any cure notices or show cause letters received on each contract listed and a description of any corrective action by the offeror or proposed subcontractor. Offerors shall attach an additional sheet(s) for this effort.