Attachment 1 - Current Davis Bacon Wage.pdf

PDF 40 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA8101-09-R-0021
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Attachment 1 to FA8101-09-R-0021.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
RFI Response 168.doc DOC document
FA8101-09-R-0021-0009.pdf PDF
RFI Response 161-166.doc DOC document
SOW070244 SOW Rev 3.pdf PDF
FA8101-09-R-0021-0008.doc DOC document
Question-Answers #5 to FBO.pdf PDF
2009 Base Facility Standard with 2007 ACP Included in Chap 13.pdf PDF
Electrical Base Stds 2007.pdf PDF
070094 Dwg M3 00 redline Rev 2.pdf PDF
070094 Dwg M5 01 redline Rev 1.pdf PDF
BoilerPlateLanguage.pdf PDF
070094 Dwg A6 00 Rev 1.pdf PDF
070094 Spec 15400 - Rev 1.pdf PDF
MACC Curtain Wall Model-1.pdf PDF
fa8101-09-r-0021-0004.doc DOC document
070094 Spec 01110 - Rev 1.pdf PDF
070295 Spec 01 11 00 - Rev 1.pdf PDF
070085 Spec 01 11 00 - Rev 1.pdf PDF
070088 SOW - Rev 1.pdf PDF
060367 Dwgs - Rev 1.pdf PDF
070088.zip ZIP file
060367 Spec 01 11 00 - Rev 1.pdf PDF
070094 Dwgs - Rev 1.pdf PDF
950028 Asbuilt.pdf PDF
Questions-Answers #1 to FBO.pdf PDF
Amendment 0002.pdf PDF
070244 As-Builts 3.zip ZIP file
070244 As-Builts 2.zip ZIP file
MACC Presolicitation Bus Tour 7-16-09.pdf PDF
SEED PROJECT PRICING Revision 1 7AUG.pdf PDF
Ventilation Bldg 3001 Tinker.doc DOC document
Pre-Proposal Conference Minutes.pdf PDF
070244 Spec 09612.pdf PDF
B3001 070094 KTR Route.pdf PDF
060367 AF66 Rev 1.pdf PDF
03_070088 FP01-Layout1.pdf PDF
FA8101-09-R-0021-0001.pdf PDF
Attachment14C.zip ZIP file
Attachment14.zip ZIP file
Attachment14B.zip ZIP file
Attachment 17.zip ZIP file
Attachment 16.zip ZIP file
Attachment 15.zip ZIP file
Attachment 12.zip ZIP file
SEED PROJECT PRICING.docx DOCX document
Atch 4 - POC listing.doc DOC document
AF 66 SAMPLE.pdf PDF
Atch 8 - subteam consent to release PP info to prime.doc DOC document
Atch 7 - Client auth letter.docx DOCX document
Atch 6 - Consent letter.doc DOC document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: OK080025 02/08/2008 OK25

Superseded General Decision Number: OK20070025

State: Oklahoma

Construction Types: Heavy Water Well Drilling

Counties: Oklahoma Statewide.

Modification Number Publication Date 0 02/08/2008

SUOK1992-006 05/12/1992

Rates Fringes

Water Well Driller.............$ 8.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: OK080034 06/26/2009 OK34

Superseded General Decision Number: OK20070034

State: Oklahoma

Construction Type: Building

County: Oklahoma County in Oklahoma.

BUILDING CONSTRUCTION PROJECTS, Excluding incidental utility work, (does not include residential construction consisting of single family homes and apartments up to and including 4 stories, sewage and water treatment plants or the construction, alteration and repair of any facility engaged in manufacturing).

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 05/30/2008 3 06/06/2008 4 06/27/2008 5 07/04/2008 6 08/29/2008 7 10/10/2008 8 10/31/2008 9 11/28/2008 10 12/05/2008 11 01/23/2009 12 02/06/2009 13 06/26/2009

ASBE0094-004 07/16/2006

Rates Fringes

Asbestos/Insulator Worker........$ 23.49 10.26

SCOPE OF WORK:

Includes application of all insulation materials, protective coverings and finishings to all types of mechanical systems.

BROK0005-001 06/01/2008

Rates Fringes

BRICKLAYER.......................$ 23.76 8.40

* ELEC1141-006 05/27/2009

Rates Fringes

ELECTRICIAN......................$ 26.00 17.25%+4.70

ELEV0063-001 01/01/2009

Rates Fringes

Elevator Constructor Mechanic....................$ 31.12 18.285

FOOTNOTE:

a. Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; Friday after Thanksgiving Day;

Christmas Day., Vacation Pay Credit: Employer contributes 8% of the basic hourly rate for employees with 5 years or more of service or 6% of the basic hourly rate for employees with 6 months to 5 years of service.

ENGI0627-010 06/01/2008

Rates Fringes

Power Equipment Operator All Crane Type Equipment with at least 100 ft. and less than 200 ft. of boom (including jib); All Tower Cranes; Crane Equipment (as rated by mfg.) 3 cu. yd. and over); Guy derrick; Whirley.$ 22.55 10.54 All Crane Type Equipment with at least 200 ft. of boom and less than 300

ft. of boom (including jib)........................$ 23.10 10.54 Bobcat......................$ 21.45 10.54 Cement Mixers:

18 Cu. Ft. and over........$ 18.70 10.54 Less than 18 Cu. ft........$ 18.70 10.54 Cherry Picker...............$ 21.95 10.54 Cranes with less than 100

ft. of boom with jib and Cranes (as rated by mfg.)

less than 3 cu.; Overhead Monorail type crane.........$ 21.95 10.54 Oiler.......................$ 18.20 10.54

IRON0048-003 06/01/2008

Rates Fringes

IRONWORKER, REINFORCING..........$ 22.10 10.01

PAIN0807-003 06/15/2004

Rates Fringes

Painters:

Paperhanger.................$ 19.00 2.35 Roller......................$ 18.00 2.35 Spray.......................$ 18.00 2.35

PLAS0809-003 06/01/2001

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 16.31 1.55

PLUM0344-004 07/01/2008

Rates Fringes

PLUMBER/PIPEFITTER (Including HVAC Work).......................$ 25.88 10.92

ROOF0143-001 06/01/2008

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 19.32 5.03

SHEE0124-007 07/01/2008

Rates Fringes

Sheet Metal Worker (Including HVAC Work).......................$ 25.85 11.35

SUOK1995-001 09/07/1995

Rates Fringes

Carpenters: (Excluding Drywall hanging & Acoustical Installation)....................$ 11.90

DRYWALL FINISHER/TAPER...........$ 12.83 2.53

DRYWALL HANGER (Including Acoustical Installation & Metal Stud/Lath in Connection with Drywall Hanging)............$ 11.29 .10

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 15.10 1.52

GLAZIER..........................$ 12.17

INSULATOR - BATT.................$ 12.85 3.30

IRONWORKER, STRUCTURAL

(Excluding Metal Building Erection)........................$ 12.03

Laborers:

Brick Tender................$ 8.69

Common......................$ 7.37 Plaster Tender..............$ 9.30 1.31

LATHER...........................$ 15.06 2.15

METAL BUILDING ERECTOR...........$ 9.12

Painters:

Brush.......................$ 12.50 2.53

PLASTERER........................$ 15.69

Power Equipment Operator Asphalt Laydown Machine.....$ 9.00 Backhoes....................$ 14.06 3.49 Bulldozers..................$ 14.40 2.58 Forklifts...................$ 12.15 3.53 Graders.....................$ 12.60 2.57 Hole Diggers................$ 14.40 2.00 Loaders.....................$ 11.36 2.40 Rollers.....................$ 11.72 2.05

SPRINKLER FITTER.................$ 15.87 5.58

TILE SETTER......................$ 14.61

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: OK080043 06/26/2009 OK43

Superseded General Decision Number: OK20070043

State: Oklahoma

Construction Type: Heavy Treatment Plant

County: Oklahoma County in Oklahoma.

SEWAGE AND WATER TREATMENT PLANT AND LIFT STATION CONSTRUCTION

(Excluding pre-fabricated), (Including Water and Sewage Utility Lines on the Plant Site)

1 02/15/2008 2 05/30/2008 3 07/04/2008 4 07/25/2008 5 08/29/2008 6 10/31/2008 7 11/28/2008 8 12/05/2008 9 02/06/2009 10 06/26/2009

* ELEC1141-007 05/27/2009

Rates Fringes

ELECTRICIAN......................$ 26.00 17.25%+4.70

IRON0584-013 06/01/2008

Rates Fringes

Ironworkers:

Reinforcing.................$ 22.10 10.01

PLUM0344-007 07/01/2008

Rates Fringes

PIPEFITTER.......................$ 25.88 10.92

SHEE0124-009 07/01/2008

Rates Fringes

Sheet metal worker...............$ 25.85 11.35

SUOK1996-011 03/04/1996

Rates Fringes

Asbestos Workers/Insulator.......$ 17.27 3.90

BRICKLAYER.......................$ 15.68 2.73

Carpenters:

Drywall Only................$ 13.35 2.30 Form Building Only..........$ 12.74 2.30 All Other Work..............$ 12.85 2.68

Concrete Finisher................$ 13.83 .90

IRONWORKER, STRUCTURAL

(Excluding Metal Building Erection)........................$ 14.66 3.67

Laborers:

Brick Tender................$ 9.00 1.30 Chain Fence Installer.......$ 8.72 Common......................$ 8.50 1.31 Concrete (Includes mixing mortar, assisting in pouring, graveling, scrapping exist)............$ 9.00 1.31 Landscape...................$ 6.55 Pipelayer...................$ 11.64

METAL BUILDING ERECTOR...........$ 14.93

Painters:

Brush.......................$ 13.06 2.53 Roller......................$ 10.73 Sandblaster.................$ 14.05 2.53

PLUMBER..........................$ 16.98 3.67

Power Equipment Operator Backhoe.....................$ 14.40 3.40 Bobcat......................$ 12.62 3.40 Bulldozer...................$ 14.40 3.40 Crane.......................$ 15.55 3.59 Forklift....................$ 14.87 3.40 Front End Loader............$ 14.40 3.40 Grader/Blade................$ 15.37 3.40 Roller......................$ 14.23 3.40 Rotary Driller..............$ 13.96 Scraper.....................$ 14.40 3.40 Trackhoe....................$ 14.40 3.40 Tractor.....................$ 12.15 3.40

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 12.60 2.44

TILE SETTER......................$ 14.00

Truck drivers:

Dump........................$ 9.70

Trailer.....................$ 11.71 Water Truck.................$ 14.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: OK080044 02/08/2008 OK44

Superseded General Decision Number: OK20070044

State: Oklahoma

Construction Type: Heavy Sewer and Water Line

County: Oklahoma County in Oklahoma.

WATER AND SEWER LINE CONSTRUCTION PROJECTS (Including such work on building and residential projects)

SUOK1996-005 02/22/1996

Rates Fringes

Carpenters: (Excluding Form Setting) All other work..............$ 11.97 Form Building...............$ 9.83

Concrete Finisher..............$ 8.79

Form Setter....................$ 8.49

Ironworker, Reinforcing........$ 8.23

Laborers:

Common & Landscape..........$ 7.19 Pipelayer...................$ 8.94 Wood/Chain Fence............$ 6.73 $1.17

Manhole Builder................$ 9.00 .66

Power Equipment Operator Asphalt paving/Laydown machine.....................$ 9.00 .14 Backhoe.....................$ 10.12 Backhoe/loader..............$ 8.50 Bobcat......................$ 9.65 Box Blade...................$ 11.00 .80 Bulldozer...................$ 9.52 Concrete Saw................$ 8.16 .14 Crane.......................$ 10.35 Excavator...................$ 12.12 Front end loader............$ 9.71 Mechanic....................$ 15.62 Roller......................$ 8.28 .14 Scraper.....................$ 9.65 Trackhoe....................$ 9.50

Truck drivers:

Dump........................$ 8.77 Flatbed.....................$ 8.02 Lowboy......................$ 9.42 .18 Tandem......................$ 7.76 .14

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

General Decision Number: OK080045 02/08/2008 OK45

Superseded General Decision Number: OK20070045

State: Oklahoma

Construction Type: Heavy

County: Oklahoma County in Oklahoma.

HEAVY CONSTRUCTION PROJECTS (Excluding water and sewer line and sewage and water treatment plant construction or the construction, alteration and repair of any facility engaged in manufacturing)

SUOK1996-007 02/08/1996

Rates Fringes

Carpenters:

All other work..............$ 11.49 $3.30 Form building work only.....$ 10.82 Form setting work only......$ 10.42

Concrete Finisher..............$ 9.89

Electrician....................$ 16.95 3.29

Ironworkers:

Reinforcing.................$ 9.87

Laborers:

Asphalt Raker...............$ 8.00 Common......................$ 7.68 Concrete (includes mixing mortar, assisting in pouring, graveling, scrapping excess......................$ 7.20 Landscaping.................$ 8.21 Pipelayer...................$ 8.87

Painter, Brush.................$ 7.50

Pipefitter.....................$ 16.61

Plumber........................$ 18.71 $4.18

Power Equipment Operator Air Compressor..............$ 8.91 Asphalt Paving/Laydown machine.....................$ 10.18 Backhoe.....................$ 11.92

Bobcat......................$ 9.65 Bulldozer...................$ 10.30 Concrete saw................$ 10.13 Crane.......................$ 11.71 Front end loader............$ 11.23

Truck drivers:

Dump........................$ 8.55 Tandem......................$ 10.92

Underground Fuel Storage Tank Installer (Includes pipe work).....................$ 10.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

File details come from the government source that posted it. Updated .