WWYK070088- AF 66- Revision 1
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66 (Rev), 19891001 (EF-V1) Page 1 of 2 Revision Date: 01 May 04
SCHEDULE OF MATERIAL SUBMITTALS – REVISION 1 (7 AUG) 09
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
WWYK070088 REPAIR BREAK AREA 2O93, B3001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
SI
O
N
D A
TE
TE
R
E C
E
IV
E
IN
C
N
TR
A C
TI
G
TE
T
O C
IV
IL
G
IN
E
E R
TU
R
N S
U S
P E
N S
E D
S U
B M
IT
TA
L N
U M
B E
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
S U
B M
IT
TA
L
FI
N
A L
A
PP
R O
V
AL
REMARKS
P R
E C
O N
S
TR
U C
TI
H
O P
D R
A W
IN
O D
U C
T D
TA
M P
LE
S
D E
S
IG
N D
T R
E P
O
TS
R
TI
FI
C
A
TE
S
M A
N U
FA
C
TU
R
E
’S
TR
U
C
TI
O
M
N U
FA
C
TU
R
E
FI
LD
R
E P
O
E R
A
TI
O N
A
IN
TE
N A
N C
E D
LO
S E
O U
T
APPROVED DISAPPROVED
Section 00 70 00
Para. 1.2 FOD Awareness Training Documentation
Para 1.2 Para. 1.4 Welding, Cutting, and Brazing Permits
Para. 1.2 Para. 1.9 O&M Manuals
Para. 1.5.4.1 Working As-Built Drawings (Redlines)
Para. 1.5.15 Final As-Built Drawings (Electronic)
Para. 1.10 Attachment 1 DD Form 1354 Checklist
Section 00 71 00 (n/a)
Section 00 72 00
Para. 1.2 Para. 1.4 Material Safety Data Sheet
Section 01400
AF FORM 66 (Rev), 19891001 (EF-V1) Page 2 of 2 Revision Date: 01 May 04
SCHEDULE OF MATERIAL SUBMITTALS – REVISION 1 (7 AUG) 09
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
WWYK070088 REPAIR BREAK AREA 2O93, B3001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
B
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
SI
TE
R
E C
E
IV
E
N
TR
A C
TI
TE
T
O C
IV
IL
G
IN
E
E R
TU
R
N S
U S
P E
N S
E D
U
B M
IT
TA
L N
U M
B E
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
S U
B M
IT
TA
L
FI
N
A L
A
PP
R O
V
AL
REMARKS
R
E C
O N
S
TR
U C
TI
H
O P
D R
A W
IN
O D
U C
T D
M P
LE
S
D E
S
IG
N D
T R
E P
O
R
TI
FI
C
A
TE
S
M A
N U
FA
C
TU
R
E
TR
U
C
TI
O
N U
FA
C
TU
R
E
FI
LD
R
E P
O
E R
A
TI
O N
A
IN
TE
N A
N C
E D
LO
S E
O U
T
APPROVED DISAPPROVED
8 Para. 1.2.5 Contractor Quality Control Plan
Statement of Work (SOW)
9 PROJECT SCHEDULE 3
10 65%, 95%, Final Drawings &
DA
3 3 3 3 3
11 New Cabinet Millwork
12 New Mech System 3
13 New Sink and faucet 3
14 Alarm devices, wiring, and conduit
3 3
15 Sprinkler devices 3
16 Light Fixtures