070244 AF66 Rev 1.pdf
PDF 30 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA8101-09-R-0021
About this file
WWYK070244- AF 66- Revision 1
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66 (Rev), 19891001 (EF-V1) Page 1 of 2 Revision Date: 03 Feb 06
SCHEDULE OF MATERIAL SUBMITTALS – REVISION 1 (7 AUG) 09
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
WWYK070244 REPAIR/RENOVATE FIRST FLOOR
B2122
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
SI
O
N
D A
TE
TE
R
E C
E
IV
E
IN
C
N
TR
A C
TI
G
TE
T
O C
IV
IL
G
IN
E
E R
TU
R
N S
U S
P E
N S
E D
S U
B M
IT
TA
L N
U M
B E
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
S U
B M
IT
TA
L
FI
N
A L
A
PP
R O
V
AL
REMARKS
P R
E C
O N
S
TR
U C
TI
H
O P
D R
A W
IN
O D
U C
T D
TA
M P
LE
S
D E
S
IG
N D
T R
E P
O
TS
R
TI
FI
C
A
TE
S
M A
N U
FA
C
TU
R
E
’S
TR
U
C
TI
O
M
N U
FA
C
TU
R
E
FI
LD
R
E P
O
E R
A
TI
O N
A
IN
TE
N A
N C
E D
LO
S E
O U
T
APPROVED DISAPPROVED
Section 00 70 00
Para. 1.2 FOD Awareness Training Documentation
Para. 1.3.9 Fire Alarm Pre-Construction Testing Record
Para 1.2 Para. 1.4 Welding, Cutting, and Brazing Permits
Para. 1.2 Para. 1.9 O&M Manuals
Para. 1.5.4.1 Working As-Built Drawings (Redlines)
Para. 1.5.15 Final As-Built Drawings (Electronic)
Para. 1.10 Attachment 1 DD Form 1354 Checklist
Section 00 71 00 (n/a)
Section 00 72 00
Para. 1.2 Para. 1.4 Material Safety Data Sheet
AF FORM 66 (Rev), 19891001 (EF-V1) Page 2 of 2 Revision Date: 03 Feb 06
SCHEDULE OF MATERIAL SUBMITTALS – REVISION 1 (7 AUG) 09
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
WWYK070244 REPAIR/RENOVATE FIRST FLOOR
B2122
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
B
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
SI
TE
R
E C
E
IV
E
N
TR
A C
TI
TE
T
O C
IV
IL
G
IN
E
E R
TU
R
N S
U S
P E
N S
E D
U
B M
IT
TA
L N
U M
B E
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
S U
B M
IT
TA
L
FI
N
A L
A
PP
R O
V
AL
REMARKS
R
E C
O N
S
TR
U C
TI
H
O P
D R
A W
IN
O D
U C
T D
M P
LE
S
D E
S
IG
N D
T R
E P
O
R
TI
FI
C
A
TE
S
M A
N U
FA
C
TU
R
E
TR
U
C
TI
O
N U
FA
C
TU
R
E
FI
LD
R
E P
O
E R
A
TI
O N
A
IN
TE
N A
N C
E D
LO
S E
O U
T
APPROVED DISAPPROVED
Section 0 14 00
9 Para. 3.5 Contractor Quality Control Plan
Statement of Word
10 PROJECT SCHEDULE w/ Phasing
11 65%, 95%, Final Drawings &
DA
3 3 3 3 3
12 Overhead Rolling Doors 3 3 3 3
13 Steel Doors and Frame, Windows
3 3 3
14 Interior Lighting 3
15 Alarm devices, wiring and conduit.
Interior finishes – Ceiling, rubber wall base and wall paint & epoxy flooring.
File details come from the government source that posted it. Updated .