26Q0012_Attch 4_Pricing Schedule_24 Nov 26.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- FY27 Nursing Practice Oversight Course (NPOC)
- Solicitation number
- FA800326Q0012
About this file
This is a Pricing Schedule template for Request for Quotation FA800326Q0012, the FY27 Nursing Practice Oversight Course (NPOC) Audiovisual Equipment & Support requirement. Quoters must complete Tab 2, which breaks down costs for a comprehensive commercial audiovisual equipment lease and support package for a three-day conference event held February 21–24, 2027, at Hotel Polaris in Colorado Springs, Colorado. The pricing structure requires vendors to enter daily unit rates for specific equipment and labor categories, with the spreadsheet automatically calculating extended prices based on pre-set quantities and rental days. Equipment categories include video systems (projection screens, video switching systems, and presenter monitors), audio systems (mixers, microphones in multiple configurations, and powered speakers), ancillary supplies (cabling, tape, batteries), and incidental labor (setup/teardown and three-day on-site technical standby support at a five-minute response guarantee). The pricing template also requires a line item for hotel-assessed production supervision, liaison, power, and internet/network fees negotiated with Hotel Polaris; vendors may enter $0.00 if the hotel waives these fees. The total Firm-Fixed-Price for CLIN 0001 must match the amount on Tab 1 and represent the complete cost for all equipment rental, delivery, installation, technical support, and hotel-assessed fees. This is a Total Small Business Set-Aside under NAICS code 532490 with evaluation using Lowest Price Technically Acceptable methodology, and the contract award is single, Firm-Fixed-Price with no discussions or proposal revisions anticipated.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TAB 1. Pricing Schedule
| FA800326Q0012 | |||||
| RFQ Attachment 4 - Amendment #6 dated 24 Nov 2026 | |||||
| CLIN Pricing Schedule | |||||
| Bid Schedule Instructions: When submitting a bid for this requirement, the following bid schedule must be used. Only fill in the highlighted YELLOW portions of this spreadsheet. Do not change any language, formatting, or equations when completing this spreadsheet. | |||||
| CLIN | Description | Unit of Measure | Quantity | Unit Price | Extended Price |
| Contract POP: 21 FEB 2027 - 24 FEB 2027 | |||||
| 0001 | FY27 NPOC Audiovisual Equipment & Support | Job | 1 | $ - 0 | $ - 0 |
FROST, AUBREY E CIV USAF AFMC 771 ESS/EGA: FROST, AUBREY E CIV USAF AFMC 771 ESS/EGA:
Autocalculated from Tab 2
TOTAL $ - 0
TAB 2. CLIN 0001 Cost Breakout
| FA800326Q0012 |
| RFQ Attachment 4 - Amendment #6 dated 24 Nov 2026 |
| CLIN Pricing Schedule |
| Instructions: The Quoter shall complete this breakout to illustrate the allocation of the proposed Firm-Fixed-Price (FFP) for CLIN 0001. Enter the Unit/Daily Rate for each pre-defined item below. The spreadsheet will calculate the Tab 1 Extended Price based on the pre-set quantities and rental days. The "TOTAL CLIN 0001 FFP" in this table must mathematically equal the proposed CLIN 0001 total on Tab 1 of the Pricing Schedule. |
| REVISED CLIN 0001 | ||||||
| Category / SOW Ref | Item / Description | Qty | Days | Unit Daily Rate ($) | TOTAL COST | RATIONALE / NOTES |
| 1.0 VIDEO EQUIPMENT | ||||||
| 1.1 (SOW IV.C) | 7’6” x 13’4” Front Projection Screen Packages (including HD projectors, screens, dress kits, frames, stands, and cabling) | 2 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate |
| 1.2 (SOW IV.C) | Video Switching System (capable of dual-source routing) | 1 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate |
| 1.3 (SOW IV.C) | Presenter Confidence Monitors (on-stage layout) | 2 | 3 | $ - 0 | $ - 0 | One monitor used Days 1 &3; 2 used on Day 2 (breakout day) |
| 2.0 AUDIO EQUIPMENT | ||||||
| 2.1 (SOW IV.C) | Standalone Audio Mixers | 2 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate |
| 2.2 (SOW IV.C) | Floor-Standing Microphone (Wired or Wireless with Adjustable Floor Stand) (Aisle Q&A) | 2 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate |
| 2.3 (SOW IV.C) | Wireless Handheld Microphones (Stage/Panels) | 4 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate |
| 2.4 (SOW IV.C) | Wireless Lapel/Lavalier Microphones (Presenters) | 4 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate |
| 2.5 (SOW IV.C) | Self-Contained Powered Speakers (with stands and cabling) | 4 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate (no hotel sound) |
| 2.6 (SOW IV.C) | Computer Audio Interfaces / Bidirectional Virtual Audio Bridges (or equivalent commercial solution) | 2 | 3 | $ - 0 | $ - 0 | Billed as daily lease rate. Hardware to bridge two-way Teams audio. Note: If proposing a digital Audio Mixer (Item 2.1) with an integrated two-way USB audio interface, enter $0.00 here. |
| 3.0 ANCILLARY & CONSUMABLES | ||||||
| 3.1 (SOW IV.C) | Cabling, Power Strips, Gaffer Tape, Cable Ramps, and Spare Batteries | 1 | 3 | $ - 0 | $ - 0 | Flat fee for physical supplies |
| 4.0 INCIDENTAL LABOR & LOGISTICS | ||||||
| 4.1 (SOW IV.B) | Setup Labor (Day 0 delivery, installation, Day 1/2 room reconfigurations, and post-event teardown) | 1 | 1 | $ - 0 | $ - 0 | Fully loaded labor rate for physical delivery, installation (access granted by hotel at 1800 on Day 0 to facilitate overnight setup/testing), joint technical walkthrough, and formal Government acceptance completed NLT 0715 on 22 Feb 2027; includes Day 1/2 room reconfigurations and post-event teardown. |
| 4.2 (SOW IV.B) | Technical Standby Support (One on-site standby technician; 0730 to 1700 daily; 5-minute response guarantee) | 1 | 3 | $ - 0 | $ - 0 | Standby rate; subject to SCLS |
| 4.3 (SOW IV) | Hotel-Assessed Production Supervision, Liaison, Power and Internet/Network Fees (1 Lot) | 1 | 1 | $ - 0 | $ - 0 | All mandatory hotel-assessed electrical drops, production supervision, liaison surcharges, and presentation internet/WiFi connection charges negotiated with Hotel Polaris. Must be included in the total FFP. If the hotel waived these fees, enter $0.00 here. |
| TOTAL CLIN 0001 FFP | $ - 0 | Must exactly match Tab 1 Total |
File details come from the government source that posted it. Updated .