26Q0012_Attch 1_SOW_17 Nov 26.docx
DOCX document 48 KB Posted
- Attached to
- FY27 Nursing Practice Oversight Course (NPOC)
- Solicitation number
- FA800326Q0012
About this file
This is a Statement of Work (SOW) for the FY27 Nursing Practice Oversight Course (NPOC), a three-day professional development event for Air Force Medical Command senior nursing leaders held February 22-24, 2027, at Hotel Polaris in Colorado Springs, Colorado.
The contractor shall provide a temporary commercial audiovisual equipment lease with delivery, installation, teardown, and on-site technical support for 300+ attendees. The scope requires a dual front-projection screen setup (7'6" x 13'4" screens, minimum 6,500 lumens brightness, WUXGA resolution) for general sessions on Days 1 and 3, with reconfiguration to two independent presentation systems on Day 2 when the ballroom is divided by airwalls into separate breakout rooms. Each configuration requires video switching systems, presenter confidence monitors (minimum 32-inch screens), audio mixers, computer audio interfaces with two-way Microsoft Teams integration capability, floor-standing and handheld wireless microphones, lapel microphones, and powered speakers. All equipment must support virtual presentation integration via Teams-hosted presentations on government-furnished laptops, with incoming remote presenter audio routed through the ballroom sound system and outgoing room microphone audio routed back to Teams. The contractor shall provide setup beginning February 21 (Day 0), with all systems fully installed, tested, and formally accepted by 0715 MST on February 22. An on-site standby technician must be present during all active session hours (0730-1700 daily, February 22-24) and respond to issues within five minutes of notification, with resolution or component replacement within fifteen minutes. Complete equipment removal and venue restoration must occur by 2000 MST on February 24. The contractor is responsible for coordinating with Hotel Polaris staff regarding logistics, loading dock access, equipment storage, power requirements, and ensuring compliance with local safety and fire codes, including securing all floor cabling with cable ramps or gaffer tape to eliminate trip hazards. The contractor shall absorb all hotel-imposed outside contractor surcharges, liaison fees, and union labor costs within the firm-fixed-price lease terms.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FY27 Nursing Practice Oversight Course (NPOC) Version: 17 November 2026
I. BACKGROUND
The AFMEDCOM A1/7DN, Force Development Branch, provides ongoing professional development and strategic oversight for its medical personnel to ensure the highest standards of care. The Nursing Practice Oversight Course (NPOC) is a critical component of this mission, bringing together senior nursing leaders from across the service.
The NPOC serves as a vital forum for discussing policy updates, sharing best practices, and providing continuing education within the military nursing community. To facilitate effective communication and collaboration, professional-grade audiovisual (AV) equipment leasing and incidental technical support is required. This Statement of Work (SOW) outlines the requirements for a qualified contractor to provide the necessary AV equipment and incidental services for the successful execution of the 2027 NPOC.
II. SCOPE OF WORK
The Contractor shall provide a temporary commercial lease of a comprehensive audiovisual (AV) presentation package with incidental delivery, installation, teardown, and on-site technical standby support for the 2027 NPOC held at Hotel Polaris, Colorado Springs, CO from February 22–24, 2027. All services are incidental to the commercial equipment lease.
The primary objective is to ensure seamless, professional-quality audio and video presentations for 300+ attendees for the entire event duration. The Contractor’s quoted equipment and technical services must support both large-group general session and multi-room breakout session formats as detailed in Section IV.
| III. | PERIOD AND PLACE OF PERFORMANCE |
| Dates: 21-24 February 2027 (21 February is Day 0 setup only) |
Location: Hotel Polaris, 8989 N. Gate Blvd., Colorado Springs, CO 80921
IV. PERFORMANCE OBJECTIVES & TECHNICAL REQUIREMENTS
A. Ballroom Configuration Support The AV system must support the following daily configurations without major equipment teardown during the event:
· General Sessions (Days 1 & 3 – 22 & 24 Feb): A dual front-projection screen setup in the undivided ballroom. Both screens will display the same content from a single presentation source (government-furnished laptop).
· Breakout Sessions (Day 2 - 23 Feb): The ballroom will be divided by hotel-provided airwalls into two (2) separate meeting spaces. The contractor shall verify airwall placement with Hotel Polaris staff prior to setting up. The AV system must support two (2) simultaneous, independent presentations, with each divided space having its own dedicated projector, screen, and self-contained sound system displaying content. Each meeting space will utilize its own distinct, separate presentation source, which will be provided via a separate government-furnished laptop (two separate laptops total, with one dedicated to each room).
· Reconfiguration Window: The transition of the AV routing from General Session to Breakout Session (and vice versa) shall not occur live during presentations. The contractor shall perform all physical hardware and signal routing reconfigurations during the scheduled breaks at the conclusion of Day 1 and Day 2.
· Virtual Presentation Integration (All Days): The AV system must support incoming virtual presentations via Microsoft Teams hosted on a Government-Furnished laptop. The system must project the incoming video source (including presentation slides and/or the remote presenter's live camera feed) from the GFE laptop onto the main ballroom screens via standard HDMI connectivity. No outgoing camera feed of the ballroom is required. The audio system must support two-way integration, routing incoming remote presenter audio through the ballroom sound system and routing live room microphone audio back into the Microsoft Teams platform so the remote presenter can clearly hear and respond to in-person audience questions without echo or audio feedback
B. Labor & Technical Support
· Setup & Teardown Labor: The Contractor shall provide qualified technical labor for the delivery, technical installation, and complete post-event removal of all leased equipment.
· Standby Technical Support: Government volunteers will operate presentation slides from Government-Furnished laptops. The Contractor is not required to provide live show-time operators, active audio mixers, or video switchers.
· On-Call Troubleshooting & Communication Protocol: The Contractor shall provide at least one (1) qualified technician on-site in a standby/on-call capacity during all active session hours (0730 to 1700 daily) from 22–24 February 2027. Prior to 0715 on Day 1, the Contractor shall provide the Government Point of Contact (GPOC) with a direct communication protocol (e.g., cell phone, two-way radio, or fixed standby desk location) to immediately notify the technician of any issues. Upon GPOC notification, the standby technician must physically arrive at the room and begin troubleshooting within five (5) minutes, and must resolve the issue or swap in an on-site spare component (e.g., backup microphone, audio interface, or cabling) within fifteen (15) minutes of arrival.
C. Required Audiovisual Equipment The Contractor shall provide, configure, and maintain the following equipment packages to support the daily room layouts:
1. Days 1 & 3 (February 22 & 24) – General Session (Undivided Ballroom) The AV configuration must support a single, unified presentation to the entire undivided ballroom.
| Category |
| Qty |
| Item/Description |
| Video |
| 2 |
| 7’6” x 13’4” Front Projection Screen Packages (or equivalent), including HD projectors, screens, dress kits, frames, stands, cabling, and HDMI connectivity. Must have a minimum brightness of 6,500 lumens and a minimum native resolution of WUXGA (1920x1200) or equivalent, to guarantee legibility across the ballroom. |
| 1 |
| Video Switching System capable of routing one (1) source to two (2) screens (Days 1 & 3) and two (2) independent sources to each screen individually (Day 2). |
| 1 |
| Presenter Confidence Monitor positioned at the front of the central stage. Must have a minimum viewable screen size of 32 inches (diagonal). |
| Audio/ PA |
| 1 |
| Standalone Audio Mixer configured for “set-and-forget” operation to balance room microphones, prevent feedback, and drive the powered speakers. |
| 1 |
| Computer Audio Interface / Bidirectional Virtual Audio Bridge (or equivalent commercial solution, to include a digital Audio Mixer with integrated two-way USB audio pass-through). Must interface with the GFE laptop running Microsoft Teams to route incoming remote presenter audio to the room speakers and outgoing room microphone audio back into Teams. |
| 2 |
| Floor-Standing Microphone (Wired or Wireless with Adjustable Floor Stand), positioned in the ballroom aisles for audience Q&A. |
| 2 |
| Wireless Handheld Microphones for narrators and panel members to use and pass on stage. |
| 2 |
| Lapel/Lavalier Microphones for active stage presenters. |
| 4 |
| Powered Speakers on stands, positioned to provide balanced sound coverage across the entire undivided space. |
| 1 |
| Computer Audio Interface for laptop audio integration. |
2. Day 2 (February 23) – Breakout Sessions (Ballroom Divided into Two Rooms) Prior to the morning session on Day 2, the contractor shall reconfigure the AV layout to support two independent, simultaneous sessions in the divided meeting spaces (Breakout Room 1 and Breakout Room 2).
Day 2 (February 23) – Breakout Sessions (Ballroom Divided into Two Rooms)
Breakout Room 1 (Generations B):
| Category |
| Qty |
| Item/Description |
| Video |
| 1 |
| 7’6” x 13’4” Front Projection Screen Packages (or equivalent), including HD projectors, screens, dress kits, frames, stands, cabling, and HDMI connectivity. Must have a minimum brightness of 6,500 lumens and a minimum native resolution of WUXGA (1920x1200) or equivalent, to guarantee legibility across the ballroom. |
| 1 |
| Presenter Confidence Monitor positioned at the front of the stage. Must have a minimum viewable screen size of 32 inches (diagonal). |
| Audio/ PA |
| 1 |
| Standalone Audio Mixer configured for “set-and-forget” operation to balance room microphones, prevent feedback, and drive the powered speakers. |
| 1 |
| Computer Audio Interface / Bidirectional Virtual Audio Bridge (or equivalent commercial solution, to include a digital Audio Mixer with integrated two-way USB audio pass-through). Must interface with the GFE laptop running Microsoft Teams to route incoming remote presenter audio to the room speakers and outgoing room microphone audio back into Teams. |
| 1 |
| Floor-Standing Microphone (Wired or Wireless with Adjustable Floor Stand), in the aisle for audience Q&A. |
| 2 |
| Wireless Handheld Microphones (for panel/narrator use). |
| 2 |
| Lapel/Lavalier Microphones (for active presenters). |
| 2 |
| Powered Speakers on stands. |
| 1 |
| Computer Audio Interface. |
Breakout Room 2 (Generations C):
| Category |
| Qty |
| Item/Description |
| Video |
| 1 |
| 7’6” x 13’4” Front Projection Screen Packages (or equivalent), including HD projectors, screens, dress kits, frames, stands, cabling, and HDMI connectivity. 7’6” x 13’4” Front Projection Screen Packages (or equivalent), including HD projectors, screens, dress kits, frames, stands, cabling, and HDMI connectivity. Must have a minimum brightness of 6,500 lumens and a minimum native resolution of WUXGA (1920x1200) or equivalent, to guarantee legibility across the ballroom. |
| 1 |
| Presenter Confidence Monitor positioned at the front of the stage. Must have a minimum viewable screen size of 32 inches (diagonal). |
| Audio/ PA |
| 1 |
| Standalone Audio Mixer configured for “set-and-forget” operation to balance room microphones, prevent feedback, and drive the powered speakers. |
| 1 |
| Computer Audio Interface / Bidirectional Virtual Audio Bridge (or equivalent commercial solution, to include a digital Audio Mixer with integrated two-way USB audio pass-through). Must interface with the GFE laptop running Microsoft Teams to route incoming remote presenter audio to the room speakers and outgoing room microphone audio back into Teams. |
| 1 |
| Floor-Standing Microphone (Wired or Wireless with Adjustable Floor Stand), in the aisle for audience Q&A. |
| 2 |
| Wireless Handheld Microphones (for panel/narrator use). |
| 2 |
| Lapel/Lavalier Microphones (for active presenters). |
| 2 |
| Powered Speakers on stands. |
| 1 |
| Computer Audio Interface. |
3. General Ancillary Items (All Days):
· All necessary cabling, power strips, and gaffer tape to ensure a safe and professional setup.
· All wireless microphones must be supplied with fully charged spare batteries sufficient for at least 5 hours of continuous use (daily).
V. PERFORMANCE STANDARDS & ACCEPTANCE
· Equipment Readiness: All leased AV systems must be fully functional and tested no later than 0715 MST daily prior to the start of sessions.
· Technical Correction Window: The on-site standby technician must arrive at the affected room and begin troubleshooting within five (5) minutes of notification by the GPOC via the established communication protocol. If an issue cannot be corrected within fifteen (15) minutes of arrival, the Contractor must swap out or replace the affected component using on-site spare/redundant inventory (e.g., spare microphone, backup audio interface, replacement cabling) to restore presentation capabilities.
· Acceptance Criteria: Services and equipment lease will be considered acceptable and processed for payment only when:
1. Equipment Installation, Testing, & Acceptance: Hotel Polaris will grant the Contractor access to the ballroom space no later than 1800 on Day 0 (21 February 2027) to facilitate delivery, installation, and overnight testing of all leased audiovisual equipment. The GPOC and Contractor will mutually agree in writing to a joint technical walkthrough time no earlier than 1800 on Day 0. All equipment must be fully installed, tested, and formally accepted by the Government no later than 0715 on Monday, 22 February 2027 (Day 1) to support the mandated 0730 session start.
2. All systems operate without disruption (or failures are resolved/swapped within the 15-minute resolution window established in Section IV.B) during all active session hours.
3. All equipment is removed, and the hotel space is restored to its original condition post-event. Teardown and physical removal of all equipment from the venue must be completed no later than 2000 MST on 24 February 2027.
VI. OPERATING CONSTRAINTS
· Hotel Liaison & Technical Coordination: The Contractor shall actively coordinate all logistics, delivery schedules, loading dock access, equipment storage, and power-drop requirements directly with the Hotel Polaris Event Management and Technical staff (including any hotel-affiliated or in-house AV representatives). The Contractor is solely responsible for ensuring that all leased equipment and cabling layouts are 100% compatible with the physical and technical systems of the Hotel Polaris ballrooms. To facilitate this coordination, the Contractor shall participate in a joint technical alignment call with the hotel staff within five (5) business days of contract award.
· Safety & Compliance Surcharges: The Contractor shall ensure that all cabling run across public spaces, corridors, or meeting rooms is completely secured and covered with heavy-duty commercial rubber cable ramps or gaffer tape in accordance with standard local commercial safety, building, and venue-specific fire codes. If wired floor-standing microphones are utilized, the Contractor is strictly obligated to secure all cable runs across aisles, walkways, and seating areas using heavy-duty commercial rubber cable ramps or professional gaffer tape. All cable installations must be completely flat and flush with the floor to eliminate any possible trip hazards. Under no circumstances shall the Government pay, reimburse, or assume liability for any hotel-mandated 'Outside Contractor Surcharges,' 'Liaison Fees,' 'Patch-in Surcharges,' or hotel-specific union labor fees. Any such commercial operational fees must be negotiated directly between the Contractor and Hotel Polaris or absorbed entirely within the Contractor's firm-fixed-price lease terms.
File details come from the government source that posted it. Updated .