Draft_RFP.pdf
PDF 1 MB Posted
- Solicitation number
- FA8003-18-R-0001
About this file
This draft request for proposal from the Air Force Installation Contracting Agency announces plans to contract for vehicle barrier maintenance and repair services across the United States Air Force. The future acquisition will utilize enterprise-wide sourcing and leverage pricing for a standardized offering. The contract will be 100% set aside for small businesses, with approximately two reserves for women-owned small businesses. A formal solicitation in the form of a request for proposal will be issued within the next few weeks. Responses to this draft RFP are not offers and cannot be accepted to form a binding contract. Submission of any information is completely voluntary and costs will not be reimbursed.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
FA800318R0001 27-Sep-2017
b. TELEPHONE NUMBER
937-257-1257
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 11 Oct 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
FA8056
9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
WILLA S. ST JOHN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
771 ESS/EGA
1940 ALLBROOK DRIVE BLD 1
WRIGHT-PATTERSON AFB OH 45433
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL:
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$20,500,000
NAICS:
811219
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF126
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
FA800318R0001
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 4 Each Preventive Maintenance
FFP
Non-Personal Service: Contractor shall furnish all labor, tools, parts, equipment, materials, paint/corrosion control, and transportation necessary to provide
Preventive Maintenance Inspection (PMI), to include annual inspections services
IAW 1.3 of the PWS and Manufacturer’s Operation and Maintenance Manuals.
PMI services may be conducted on either a quarterly, monthly, or in rare cases, bi-weekly basis.
FOB: Destination
SIGNAL CODE: A
NET AMT
0002 1 Each Routine Service Call
FFP
Non-Personal Service: Upon official notification by the CO or their appointed representative, the Contractor shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an Active Vehicle Barrier
(AVB) lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email. Twenty-four (24) hours from approval by the CO will be on site. Within six (6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed.
If the barriers cannot be returned to operational status within six (6) hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
0003 1 Each Emergency Service Call
FFP
Non-Personal Service: Upon official notification by the CO, the Contractor or their appointed representative shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an AVB lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email.
Six (6) hours from approval by the CO the contractor will be on site. Within six
(6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed. If the barriers cannot be returned to operational status within 6 hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
0004 1 Each Additional In-Scope Work
FFP
Non-Personal Services: When directed by the Government CO, the Contractor shall perform additional in-scope work. The CO shall issue work requests in the form of a contract modification (Standard Form 30). A mutually agreed to procedure for implementation shall be as follows: Once additional in scope work is identified by the Government, the Contractor shall develop a quotation and present this to the CO who may authorize a work request via a SF 30. The quotation provided by the contractor shall be a Firm-Fixed Price (FFP) amount. If the value of the proposed work is at or above $10,000 the request may be re-competed to all the MAC IDIQ awardees. This CLIN may be used in conjunction with PM.
0005 1 Each Develop Controls Schematic
FFP
Non-Personal Service: Contractor shall provide a control schematic for an entry control facility (ECF). Contractor shall develop a detailed control schematic for each ECF inclusive of all barriers and barrier system components listed in paragraph 1.2 for that site.
0006 1 Lot Contract Data Requirement List (CDRL)
FFP
Please refer to Contract Data Requirement List (CDRL) package for additional information. Meetings could be a minimum of four (4) quarterly or 12 monthly meetings (base/task order specific), Quality Control Plan is one (1) submission that is remitted within 15 days after task order, Annual Training is one (1) submission
(task order specific), and Quarterly Reports is four (4) submissions per task order.
0007 Session Program Management Review
FFP
The contractor shall participate in an annual PMR with the 771st Enterprise
Sourcing Squadron Vehicle Barrier Program Team and other stakeholders. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, quality, competitiveness, and/or any other topic the Government or contractor deem necessary for reducing costs, increasing quality, or resolving issues.
No price shall be provided for this CLIN. This CLIN is not separately priced. If no task orders are issued during the ordering period, a PMR is not required.
0008 1 Session Post Award Orientation
FFP
Participation is Mandatory Post Award Orientation. Post award conference may be conducted in person or by virtual/electronic means.
The value of this post award orientation will be $1,000. The Offeror should not provide pricing for this line item, but shall submit with its proposal a signed statement from an authorized representative on company letterhead indicating it will participate in the mandatory post award orientation; that it understands $1,000 will be the total price for participation (no more and no less).
1001 4 Each OPTION Preventive Maintenance
FFP
Non-Personal Service: Contractor shall furnish all labor, tools, parts, equipment, materials, paint/corrosion control, and transportation necessary to provide
Preventive Maintenance Inspection (PMI), to include annual inspections services
IAW 1.3 of the PWS and Manufacturer’s Operation and Maintenance Manuals.
PMI services may be conducted on either a quarterly, monthly, or in rare cases, bi-weekly basis.
1002 1 Each OPTION Routine Service Call
FFP
Non-Personal Service: Upon official notification by the CO or their appointed representative, the Contractor shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an Active Vehicle Barrier
(AVB) lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email. Twenty-four (24) hours from approval by the CO will be on site. Within six (6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed.
If the barriers cannot be returned to operational status within six (6) hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
1003 1 Each OPTION Emergency Service Call
FFP
Non-Personal Service: Upon official notification by the CO, the Contractor or their appointed representative shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an AVB lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email.
Six (6) hours from approval by the CO the contractor will be on site. Within six
(6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed. If the barriers cannot be returned to operational status within 6 hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
1004 1 Each OPTION Additional In-Scope Work
FFP
Non-Personal Services: When directed by the Government CO, the Contractor shall perform additional in-scope work. The CO shall issue work requests in the form of a contract modification (Standard Form 30). A mutually agreed to procedure for implementation shall be as follows: Once additional in scope work is identified by the Government, the Contractor shall develop a quotation and present this to the CO who may authorize a work request via a SF 30. The quotation provided by the contractor shall be a Firm-Fixed Price (FFP) amount. If the value of the proposed work is at or above $10,000 the request may be re-competed to all the MAC IDIQ awardees. This CLIN may be used in conjunction with PM.
1005 1 Each OPTION Develop Controls Schematic
FFP
Non-Personal Service: Contractor shall provide a control schematic for an entry control facility (ECF). Contractor shall develop a detailed control schematic for each ECF inclusive of all barriers and barrier system components listed in paragraph 1.2 for that site.
1006 1 Lot OPTION Contract Data Requirement List (CDRL)
FFP
Please refer to Contract Data Requirement List (CDRL) package for additional information. Meetings could be a minimum of four (4) quarterly or 12 monthly meetings (base/task order specific), Quality Control Plan is one (1) submission that is remitted within 15 days after task order, Annual Training is one (1) submission
(task order specific), and Quarterly Reports is four (4) submissions per task order.
1007 Session OPTION Program Management Review
FFP
The contractor shall participate in an annual PMR with the 771st Enterprise
Sourcing Squadron Vehicle Barrier Program Team and other stakeholders. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, 2001 4 Each OPTION Preventive Maintenance
FFP
Non-Personal Service: Contractor shall furnish all labor, tools, parts, equipment, materials, paint/corrosion control, and transportation necessary to provide
Preventive Maintenance Inspection (PMI), to include annual inspections services
IAW 1.3 of the PWS and Manufacturer’s Operation and Maintenance Manuals.
PMI services may be conducted on either a quarterly, monthly, or in rare cases, bi-weekly basis.
2002 1 Each OPTION Routine Service Call
FFP
Non-Personal Service: Upon official notification by the CO or their appointed representative, the Contractor shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an Active Vehicle Barrier
(AVB) lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email. Twenty-four (24) hours from approval by the CO will be on site. Within six (6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed.
If the barriers cannot be returned to operational status within six (6) hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
2003 1 Each OPTION Emergency Service Call
FFP
Non-Personal Service: Upon official notification by the CO, the Contractor or their appointed representative shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an AVB lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email.
Six (6) hours from approval by the CO the contractor will be on site. Within six
(6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed. If the barriers cannot be returned to operational status within 6 hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
2004 1 Each OPTION Additional In-Scope Work
FFP
Non-Personal Services: When directed by the Government CO, the Contractor shall perform additional in-scope work. The CO shall issue work requests in the form of a contract modification (Standard Form 30). A mutually agreed to procedure for implementation shall be as follows: Once additional in scope work is identified by the Government, the Contractor shall develop a quotation and present this to the CO who may authorize a work request via a SF 30. The quotation provided by the contractor shall be a Firm-Fixed Price (FFP) amount. If the value of the proposed work is at or above $10,000 the request may be re-competed to all the MAC IDIQ awardees. This CLIN may be used in conjunction with PM.
2005 1 Each OPTION Develop Controls Schematic
FFP
Non-Personal Service: Contractor shall provide a control schematic for an entry control facility (ECF). Contractor shall develop a detailed control schematic for each ECF inclusive of all barriers and barrier system components listed in paragraph 1.2 for that site.
2006 1 Lot OPTION Contract Data Requirement List (CDRL)
FFP
Please refer to Contract Data Requirement List (CDRL) package for additional information. Meetings could be a minimum of four (4) quarterly or 12 monthly meetings (base/task order specific), Quality Control Plan is one (1) submission that is remitted within 15 days after task order, Annual Training is one (1) submission
(task order specific), and Quarterly Reports is four (4) submissions per task order.
2007 Session OPTION Program Management Review
FFP
The contractor shall participate in an annual PMR with the 771st Enterprise
Sourcing Squadron Vehicle Barrier Program Team and other stakeholders. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, 3001 4 Each OPTION Preventive Maintenance
FFP
Non-Personal Service: Contractor shall furnish all labor, tools, parts, equipment, materials, paint/corrosion control, and transportation necessary to provide
Preventive Maintenance Inspection (PMI), to include annual inspections services
IAW 1.3 of the PWS and Manufacturer’s Operation and Maintenance Manuals.
PMI services may be conducted on either a quarterly, monthly, or in rare cases, bi-weekly basis.
3002 1 Each OPTION Routine Service Call
FFP
Non-Personal Service: Upon official notification by the CO or their appointed representative, the Contractor shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an Active Vehicle Barrier
(AVB) lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email. Twenty-four (24) hours from approval by the CO will be on site. Within six (6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed.
If the barriers cannot be returned to operational status within six (6) hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
3003 1 Each OPTION Emergency Service Call
FFP
Non-Personal Service: Upon official notification by the CO, the Contractor or their appointed representative shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an AVB lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email.
Six (6) hours from approval by the CO the contractor will be on site. Within six
(6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed. If the barriers cannot be returned to operational status within 6 hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
3004 1 Each OPTION Additional In-Scope Work
FFP
Non-Personal Services: When directed by the Government CO, the Contractor shall perform additional in-scope work. The CO shall issue work requests in the form of a contract modification (Standard Form 30). A mutually agreed to procedure for implementation shall be as follows: Once additional in scope work is identified by the Government, the Contractor shall develop a quotation and present this to the CO who may authorize a work request via a SF 30. The quotation provided by the contractor shall be a Firm-Fixed Price (FFP) amount. If the value of the proposed work is at or above $10,000 the request may be re-competed to all the MAC IDIQ awardees. This CLIN may be used in conjunction with PM.
3005 1 Each OPTION Develop Controls Schematic
FFP
Non-Personal Service: Contractor shall provide a control schematic for an entry control facility (ECF). Contractor shall develop a detailed control schematic for each ECF inclusive of all barriers and barrier system components listed in paragraph 1.2 for that site.
3006 1 Lot OPTION Contract Data Requirement List (CDRL)
FFP
Please refer to Contract Data Requirement List (CDRL) package for additional information. Meetings could be a minimum of four (4) quarterly or 12 monthly meetings (base/task order specific), Quality Control Plan is one (1) submission that is remitted within 15 days after task order, Annual Training is one (1) submission
(task order specific), and Quarterly Reports is four (4) submissions per task order.
3007 Session OPTION Program Management Review
FFP
The contractor shall participate in an annual PMR with the 771st Enterprise
Sourcing Squadron Vehicle Barrier Program Team and other stakeholders. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, 4001 4 Each OPTION Preventive Maintenance
FFP
Non-Personal Service: Contractor shall furnish all labor, tools, parts, equipment, materials, paint/corrosion control, and transportation necessary to provide
Preventive Maintenance Inspection (PMI), to include annual inspections services
IAW 1.3 of the PWS and Manufacturer’s Operation and Maintenance Manuals.
PMI services may be conducted on either a quarterly, monthly, or in rare cases, bi-weekly basis.
4002 1 Each OPTION Routine Service Call
FFP
Non-Personal Service: Upon official notification by the CO or their appointed representative, the Contractor shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an Active Vehicle Barrier
(AVB) lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email. Twenty-four (24) hours from approval by the CO will be on site. Within six (6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed.
If the barriers cannot be returned to operational status within six (6) hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
4003 1 Each OPTION Emergency Service Call
FFP
Non-Personal Service: Upon official notification by the CO, the Contractor or their appointed representative shall have an appropriate qualified lead technician contact the Government within two (2) hours to determine the scope of the problem and to attempt to resolve the emergency over the telephone. If it is determined that the situation cannot be resolved over the telephone, the Contractor shall contact the
CO, and request a Service Call approval to dispatch an AVB lead technician to the site. The Contractor can request the notice to proceed by telephone, text or email.
Six (6) hours from approval by the CO the contractor will be on site. Within six
(6) hours from arrival on site, Contractor shall complete the trouble shooting, make the needed minor repairs (NTE $100 parts/call), system adjustments to return the barrier to operational status or place the barrier into safe mode where traffic can operate over barriers safely until repairs can be completed. If the barriers cannot be returned to operational status within 6 hours or under the $100 minor parts/call threshold the contractor shall provide the CO with estimated cost and plan to repair before the contractor leaves the site.
4004 1 Each OPTION Additional In-Scope Work
FFP
Non-Personal Services: When directed by the Government CO, the Contractor shall perform additional in-scope work. The CO shall issue work requests in the form of a contract modification (Standard Form 30). A mutually agreed to procedure for implementation shall be as follows: Once additional in scope work is identified by the Government, the Contractor shall develop a quotation and present this to the CO who may authorize a work request via a SF 30. The quotation provided by the contractor shall be a Firm-Fixed Price (FFP) amount. If the value of the proposed work is at or above $10,000 the request may be re-competed to all the MAC IDIQ awardees. This CLIN may be used in conjunction with PM.
4005 1 Each OPTION Develop Controls Schematic
FFP
Non-Personal Service: Contractor shall provide a control schematic for an entry control facility (ECF). Contractor shall develop a detailed control schematic for each ECF inclusive of all barriers and barrier system components listed in paragraph 1.2 for that site.
4006 1 Lot OPTION Contract Data Requirement List (CDRL)
FFP
Please refer to Contract Data Requirement List (CDRL) package for additional information. Meetings could be a minimum of four (4) quarterly or 12 monthly meetings (base/task order specific), Quality Control Plan is one (1) submission that is remitted within 15 days after task order, Annual Training is one (1) submission
(task order specific), and Quarterly Reports is four (4) submissions per task order.
4007 Session OPTION Program Management Review
FFP
The contractor shall participate in an annual PMR with the 771st Enterprise
Sourcing Squadron Vehicle Barrier Program Team and other stakeholders. This meeting may be accomplished virtually, via teleconference or by other electronic means. The purpose of the PMR will be to discuss contractor performance, INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 Destination Government Destination Government
2007 Destination Government Destination Government
3001 Destination Government Destination Government
3002 Destination Government Destination Government
3003 Destination Government Destination Government
3004 Destination Government Destination Government
3005 Destination Government Destination Government
3006 Destination Government Destination Government
3007 Destination Government Destination Government
4001 Destination Government Destination Government
4002 Destination Government Destination Government
4003 Destination Government Destination Government
4004 Destination Government Destination Government
4005 Destination Government Destination Government
4006 Destination Government Destination Government
4007 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 06-APR-2018 TO
05-APR-2019
N/A N/A
0002 POP 06-APR-2018 TO
0003 POP 06-APR-2018 TO
0004 POP 06-APR-2018 TO
0005 POP 06-APR-2018 TO
0006 POP 06-APR-2018 TO
0007 POP 06-APR-2018 TO
0008 POP 06-APR-2018 TO
1001 POP 06-APR-2019 TO
05-APR-2020
1002 POP 06-APR-2019 TO
1003 POP 06-APR-2019 TO
1004 POP 06-APR-2019 TO
1005 POP 06-APR-2019 TO
1006 POP 06-APR-2019 TO
1007 POP 06-APR-2019 TO
2001 POP 06-APR-2020 TO
05-APR-2021
2002 POP 06-APR-2020 TO
2003 POP 06-APR-2020 TO
2004 POP 06-APR-2020 TO
2005 POP 06-APR-2020 TO
2006 POP 06-APR-2020 TO
2007 POP 06-APR-2020 TO
3001 POP 06-APR-2021 TO
05-APR-2022
3002 POP 06-APR-2021 TO
3003 POP 06-APR-2021 TO
3004 POP 06-APR-2021 TO
3005 POP 06-APR-2021 TO
3006 POP 06-APR-2021 TO
3007 POP 06-APR-2021 TO
4001 POP 06-APR-2022 TO
05-APR-2023
4002 POP 06-APR-2022 TO
4003 POP 06-APR-2022 TO
4004 POP 06-APR-2022 TO
4005 POP 06-APR-2022 TO
4006 POP 06-APR-2022 TO
4007 POP 06-APR-2022 TO
CLAUSES INCORPORATED BY REFERENCE
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(Sep 2006) -- Alternate I
OCT 1995
52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-7 Information Regarding Responsibility Matters JUL 2013
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-8 Utilization of Small Business Concerns NOV 2016
52.219-13 Notice of Set-Aside of Orders NOV 2011
52.219-14 Limitations On Subcontracting JAN 2017
52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option
Contracts)
MAY 2014
52.222-56 Certification Regarding Trafficking in Persons Compliance
Plan.
MAR 2015
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.232-29 Terms for Financing of Purchases of Commercial Items FEB 2002
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7003 Agency Office of the Inspector General DEC 2012
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-0001 Line Item Specific: Single Funding SEP 2009
252.204-7003 Control of Government Personnel Work Product JUN 2014
252.204-7006 Billing Instructions OCT 2005
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
252.217-7028 Over And Above Work DEC 1991
252.222-7007 Representation Regarding Combating Trafficking in Persons JAN 2015
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Dec 2016)
DEC 2016
252.225-7002 Qualifying Country Sources As Subcontractors DEC 2016
252.225-7012 Preference For Certain Domestic Commodities DEC 2016
252.225-7031 Secondary Arab Boycott Of Israel JUN 2005
252.225-7048 Export-Controlled Items JUN 2013
252.225-7050 Disclosure of Ownership or Control by the Government of a
Country that is a State Sponsor of Terrorism
OCT 2015
252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business
Concerns
SEP 2004
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006
252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2012
252.244-7000 Subcontracts for Commercial Items JUN 2013
252.246-7000 Material Inspection And Receiving Report MAR 2008
252.247-7022 Representation Of Extent Of Transportation Of Supplies By
Sea
AUG 1992
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
52.209-12 CERTIFICATION REGARDING TAX MATTERS (FEB 2016)
(a) This provision implements section 523 of Division B of the Consolidated and Further Continuing Appropriations
Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts.
(b) If the Offeror is proposing a total contract price that will exceed $5,000,000 (including options), the Offeror shall certify that, to the best of its knowledge and belief, it--
(1) Has [ ] filed all Federal tax returns required during the three years preceding the certification;
(2) Has not [ ] been convicted of a criminal offense under the Internal Revenue Code of 1986; and
(3) Has not [ ], more than 90 days prior to certification, been notified of any unpaid Federal tax assessment for which the liability remains unsatisfied, unless the assessment is the subject of an installment agreement or offer in compromise that has been approved by the Internal Revenue Service and is not in default, or the assessment is the subject of a non-frivolous administrative or judicial proceeding.
(End of provision)
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF
1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the
Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.
Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the
Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent
Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA
Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC
20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.
Additional copies will be issued for a fee.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (https://assist.dla.mil/online/start/).
(ii) Quick Search (http://quicksearch.dla.mil/).
(iii) ASSISTdocs.com (http://assistdocs.com).
(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point
(DoDSSP) by--
(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone
(215) 697-2667/2179, Facsimile (215) 697-1462.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(j) Unique entity identifier. (Applies to all offers exceeding $3,500, and offers of $3,500 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM) database.) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(k) System for Award Management. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting
Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.acquisition.gov.
(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award;
(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
https://assist.dla.mil/online/start/ http://quicksearch.dla.mil/ http://assistdocs.com/ https://assist.dla.mil/wizard/index.cfm http://www.sam.gov/ http://www.sam.gov/ https://www.acquisition.gov/
(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
ADDENDUM 52.212-1
ADDENDUM TO 52.212-1, Instructions to Offerors
INSTRUCTION TO OFFERORS
1. Program Structure and Purpose
1.1 The purpose of this solicitation is to acquire Vehicle Barrier Maintenance and Repair (VB M&R) services for
United States Air Force (USAF) installations within the scope of this program.
1.2 This acquisition will be set aside 100% for Small Business (SB), with approximately two Women-Owned
Small Business reserves. The Government plans to accomplish one (1) source selection. The source selection will result in the government awarding a Multiple Award Contract (MAC) Indefinite Delivery Indefinite
Quantity (IDIQ) to a targeted number of offerors. The MAC IDIQ will have a five (5) year ordering period consisting of a base year plus four (4) one - year options. The contract will primarily include preventive maintenance, routine/emergency response, and minor repair to existing vehicle barrier systems as detailed in the
Performance Work Statement (PWS) that meet all USAF and local specifications while supporting the customers’ requirements and maintaining a safe and efficient operation.
1.3 Task Order 0001 will be issued concurrently with the base MAC IDIQ award for mandatory participation in a vendor specific post award orientation.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .