Attachment_12_ITO_Attachment_4_PPI_Tool_Instructions.pdf

PDF 280 KB Posted

Attached to
USAFA Civil Engineering Base Maintenance Support
Solicitation number
FA7000-17-R-0012
Issued by

About this file

Attachment 12_ITO Attachment 4_PPI Tool Instructions

View the file

Other files

File Type Posted
Notice_of_Contract_Award.pdf PDF
Attachment_1_USAFA_CE_BMS_PWS_rev_4.2_dated_11_April_2018.pdf PDF
Notice_to_Industry_11_April_2018.pdf PDF
FA7000-17-R-0012-0004.pdf PDF
RFI_Q&A_for_Industry_-_Part_II.pdf PDF
Notice_to_Industry_28_Mar_18.pdf PDF
FA7000-17-R-0012-0003.pdf PDF
Dorm_Occupancy_Rates_2015-2017.xlsx XLSX spreadsheet
Attachment_7_DBA_Residential_CO180014_dated_2_March_2018.pdf PDF
Attachment_14_ITO_Attachment_6_CLIN_Schedule_Spreadsheet_Rev_1.xlsx XLSX spreadsheet
CO_Conveyance_Inspection_Guidance060617.pdf PDF
Attachment_8_DD_Form_254.pdf PDF
DD_FORM_254_Continuation_Page.pdf PDF
Pest_Management_Plan__2012_(With_2015_udpates)-re-sized.pdf PDF
CO_ConveyanceRegulations040117.pdf PDF
Attachment_5_DBA_Heavy_CO180012_dated_2_March_2018.pdf PDF
Solicitation_Changes_Sheet_20_Mar_18.pdf PDF
_FA7000-17-R-0012-0002.pdf PDF
Attachment_1_USAFA_CE_BMS_PWS_Rev_4.1_dated_20_Mar_18.pdf PDF
RFI_Q&A_for_Industry_20_Mar_18.pdf PDF
_FA7000-17-R-0012-0002_CONFORMED.pdf PDF
A17.1--2013.pdf PDF
Notice_to_Industry_20_Mar_18.pdf PDF
CO_Conveyances-Statutes_2017.pdf PDF
Attachment_4_DBA_Building_CO180032_dated_2_March_2018.pdf PDF
Notice_to_Industry_1_Mar_18.pdf PDF
DBA_Residential_CO180014_dated_2_February_2018.pdf PDF
DBA_Heavy_CO180012_dated_2_February_2018.pdf PDF
SCA_WD_Rev_9_dated_10_January_2018.pdf PDF
DBA_Building_CO180032_dated_2_February_2018.pdf PDF
ITO_Attachment_5_Past_Performance_Questionnaire_(PPQ).docx DOCX document
DBA_Highway_CO180018_dated_2_February_2018.pdf PDF
FA7000-17-R-0012-0001.pdf PDF
FINAL_Amendment_1_Slides.pdf PDF
Notice_to_Industry_8_Feb_18.pdf PDF
_FA7000-17-R-0012.pdf PDF
Attachment_2_SCA_WD_15-5418_Rev8_26_Dec_17.pdf PDF
Attachment_5_DBA_Heavy_CO180012_5_Jan_18.pdf PDF
Attachment_10_ITO_Attachment_2_Sample_Client_Authorization_Letter.docx DOCX document
Attachment_6_DBA_Highway_CO180018_5_Jan_18.pdf PDF
Attachment_8_RESERVED.pdf PDF
Exhibit_A_Contract_Data_Requirements_List.pdf PDF
Attachment_9_ITO_Attachment_1_Sample_Consent_Letter.docx DOCX document
Attachment_1_USAFA_CE_BMS_PWS_rev_4_dated_19_Jan_18.pdf PDF
Attachment_3_CBA_USAFA_1_Sep_15.pdf PDF
Attachment_14_ITO_Attachment_6_CLIN_Schedule_Spreadsheet.xlsx XLSX spreadsheet
Attachment_13_ITO_Attachment_5_Past_Performance_Questionnaire_(PPQ).pdf PDF
Attachment_11_ITO_Attachment_3_PPI_Tool.accdb MDB file
Attachment_7_DBA_Residential_CO180014_5_Jan_18.pdf PDF
Notice_to_Industry_19_Jan_18.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITO ATTACHMENT 4: PAST PERFORMANCE INFORMATION (PPI) TOOL

INSTRUCTIONS

Offerors must use the PPI Tool (“ITO Attachment 3_PPI Tool” as listed on FedBizOps) in order to electronically submit the PPI portion of the Past Performance Volume in accordance with the

RFP.

Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the Contracting Officer for assistance):

1. Access the FedBizOpps (https://www.fbo.gov/) website.

2. Find the solicitation posting.

3. Locate the “ITO Attachment 3_PPI Tool” attachment from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the attachment and save “ITO Attachment 3_PPI Tool” to your computer. Name the file as the prime contractor + RFP number + file extension (ie.

XYZCompanyFA861710R6158.accdb).

Note: PPI Tools saved in Microsoft Office versions 2007 and greater will be saved with “.accdb” file extension.

Entering information in the PPI Tool After selecting and saving the tool, enter information by performing the following steps:

1. Open the saved PPI Tool.

2. Select the “Options” button from the “Security Warning” banner, if applicable

3. The “Security Alert” pop-up screen displays.

Figure 1: Security Alert Pop-up https://www.fbo.gov/

Note:

• Files saved using Microsoft Office 2010 will have the “Enable Content” button on the “Security Warning” banner and therefore will not get a Security Alert pop-up.

• If a "read only" file is opened, in order to populate data in the file, click "Save As" in the "Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (ie. XYZCompanyFA861710R6158.accdb).

4. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.

Figure 2: Setup Pop-Up

5. Select the “Start” button. The “Application Setup” screen displays.

Figure 3: Application Setup Screen

Note: Once the Offeror’s Name and RFP Number have been entered they can be edited by selecting the “Edit Offeror And RFP Number” button from the “Contractor’s Menu”

6. Enter the Offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.

Figure 4: Continue the Application Setup

7. Choose the appropriate option by selecting the corresponding radio button and then click the

“Next” button. The “Contractor’s Menu” displays.

Figure 5: Contractor’s Menu

8. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each business entity before proceeding throughout the PPI Tool. Identify all prime, sub-prime, and partner organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.

Figure 6: Business Relationships

9. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.

Figure 7: Enter New Business Relationship

10. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):

• Contractor’s Name: Self-explanatory

• Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint

Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

• Place of Work: Location where contractor will perform work.

• Percentage of Work: Identify percentage of work contributed by specified business entity

• Responsibilities: Detail proposed responsibilities of specified business entity.

11. Select one of the buttons at the bottom of the screen.

• Add – Saves the current business relationship and allows for the addition of a new one.

• Close – Cancels the current business relationship without saving.

Note: In order to edit or delete an existing business relationship in the list, double-click on it.

12. Select the “Close” button on the “Business Relationships” screen after all of the business relationships have been added.

13. Click the “Step 2: Enter Past Performance Information (PPI)” button to enter the Past Performance Information. The “Past

Performance” screen displays.

Figure 8: Past Performance

14. Click the “New” button to enter Past Performance Information for the proposed acquisition.

An additional “Past Performance” screen displays.

Figure 9: Enter Past Performance Information

15. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):

• Contract Information Tab Contractor: Select from the dropdown the appropriate business entity.

Cage Code: MANDATORY, self-explanatory.

Contract Number: If you don’t have a contract number, enter “N/A.”

Program Title: Enter full name of program.

Contr Agency/Customer: Enter servicing contracting agency and customer (office symbols suffice).

DUNS Number: MANDATORY, self-explanatory.

Delivery Task/Order: If the order is provided as a stand-alone reference, enter the task/call/delivery/purchase order number.

Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite

Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.

Short Program Title (i.e. Acronym): Enter abbreviated title for the program or enter “N/A.”

Contract Dollar Value:

o Original: Input total contract dollar value, with all options if applicable, in the amount originally awarded on the referenced contract.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

o Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

o Explain the differences in Contract Value, if applicable: Enter an explanation of the difference between the original contract dollar value and the revised value as of the time of PPI submission.

Period of Performance (mm/dd/yy) o Start Date: Input start date of contract.

o Original End Date: Input original end date based on award.

o Current End Date: Input end date, as the contract stands at time of PPI submission.

o Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End Date.”

• Program Details Tab Brief Description of Effort as:

o Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

o Provide a brief description of the service provided and actual work performed under this contract reference.

o If applicable: Provide information on performance problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.

Explain how your performance on this contract is relevant. For each citation, offerors shall identify which USAFA CE BMS PWS paragraph reference(s) the past performance citation is associated with. Include any unique aspects that demonstrate relevancy in this effort. Provide evidence to support such relevance to the requirements as described in the RFP.

Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting, if applicable.

Identify whether a subcontracting plan was required for the contract you are submitting. If one was required, identify in percentage terms the planned versus achieved goals during contract performance. Explain why goals were not met, if applicable:

• POC & Key Individuals Tab Customer Points of Contact: Click the “Program/Site Manager,” “Contracting

Officer” or “Admin POC” button for the point of contact that you would like to add, edit, or delete.

Note: For Government contracts provide current information on Program Manager, Contracting Officer, and Admin POC, if available.

For commercial contracts provide points of contact fulfilling these same roles, if available.

16. Select from the buttons at the bottom of the Past Performance screen:

• Save – Saves the Past Performance Information and displays the “Contract Information” tab on the Past Performance screen.

• Close – Closes the Past Performance screen. If there were any updates, a pop-up window displays asking to save before closing.

• Delete – Deletes the current PPI record. A pop-up window displays, select “Yes” to delete the record or “No” to close the window without deleting the record.

Note: In order to edit or delete an existing PPI record in the list, double-click on it.

17. Select the “Close” button on the “Past Performance Information” screen after all of the PPI records have been added.

Printing Reports and Submitting PPI Tool In order to print the PPI reports, perform the following steps:

1. Click the “Step 3: Print Report” button . A pop-up displays asking which report to print.

Figure 10: Select Report to Print

2. Select only the “Past Performance” option. The “Business Relationships” report DOES NOT need to be printed.

3. The Past Performance documents will print separately and need to be combined to create

Section 5 of your Past Performance Volume.

In order to electronically submit the Business Relationships and PPI, perform the following steps:

4. Click the “Step 4: Submit” button . The “Submission Instructions” screen displays.

Figure 11: Submission Instructions

5. Follow the submission instructions. Hard copies of the Past Performance Information pages generated from this tool shall be used in the hard copy of the Past Performance Volume subject to the limitations outlined in this RFP and should be included as Section 5 of the Past Performance Volume.

Note:

• Submit an electronic copy (ie. CD) of the saved PPI database file with your proposal. If a prime contractor is submitting the file enter the filename as:

o prime contractor + RFP number + file extension (ie.

XYZCompanyFA861710R6158.accdb) If a subcontractor is submitting the file enter the filename as:

o subcontractor + RFP number + file extension (ie.

ABCCompanyFA861710R6158.accdb)

• Once the file is saved to a CD or any location that is marked as “Read-only,” it must first be saved to the desktop in order to read/edit the file.

Editing Offeror and RFP Number In order to edit the offeror name and/or the RFP number identified during start-up, perform the following steps:

1. Click the “Edit Offeror and RFP Number” button . The

“Application Setup” screen displays.

Figure 12: Change Name and RFP Number - Application Setup

2. Update the offeror’s name and/or RFP number.

3. Click the “Next” button twice to return to the “Contractor’s Menu”.

File details come from the government source that posted it.