FA7000-17-R-0007_Amendment_2_Modification_copy.pdf
PDF 67 KB Posted
- Attached to
- Phases 1A, 1B, & 2 of CCTV System Federal contract opportunity
- Solicitation number
- FA7000-17-R-0007
About this file
FA7000-17-R-0007 Amendment 2 Modification copy
View the file
Other files for this federal contract opportunity
Show all 50
Phases 1A, 1B, & 2 of CCTV System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Change the scope of this sollicitation by eliminating phases 2-5 and including Phases 1A & 1B ONLY. CLINs 0003, 0004, 0005,0006, & 0007 are deleted. Contract attachments for Phases 2-5 are deleted.
2. Extend the proposal due date to 22 Nov 17.
3. Revise the SoW.
4. Add a site visit for the w eek of 23 Oct 17.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Oct-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA700017R0007
X 9B. DATED (SEE ITEM 11)
09-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Oct-2017
CODE
10 CONS - FA7000
STEIN, H.
8110 INDUSTRIAL DR STE 200
PKA
USAF ACADEMY CO 80840-2315
FA7000 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA700017R0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Sep-2017 02:00 PM to 22-Nov-
2017 02:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The contract type FFP has been deleted.
The CLIN description has changed from Phase 2 to Deleted.
The CLIN extended description has changed from:
Buildings, Areas, Network and Servers – Prep School The contractor shall provide all labor, materials, equipment, supervision, and incidentals to provide and install CCTV Basewide-Phase 2 in accordance with the Statement of Work, drawings, specifications, and contract attachments.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
To:
The pricing detail quantity 1.00 has been deleted.
The unit of issue Lot has been deleted.
The option status has changed from Option to No Status.
The signal code A has been deleted.
The FOB Destination has been deleted.
The FSC code 6350 has been deleted.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Deleted
NET AMT
CLIN 0004
The CLIN description has changed from Phase 3 to Deleted.
The CLIN extended description has changed from:
Buildings, Areas, Network and Servers – Cadet Area The contractor shall provide all labor, materials, equipment, supervision, and incidentals to provide and install CCTV Basewide-Phase 3 in accordance with the Statement of Work, drawings, specifications, and contract attachments.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
The unit of issue Lot has been deleted.
The option status has changed from Option to No Status.
The signal code A has been deleted.
CLIN 0005
The CLIN description has changed from Phase 4 to Deleted.
The CLIN extended description has changed from:
Buildings, Areas, Network and Servers – Cadet Athletic Areas The contractor shall provide all labor, materials, equipment, supervision, and incidentals to provide and install CCTV Basewide-Phase 4 in accordance with the Statement of Work, drawings, specifications, and contract attachments.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
The unit of issue Lot has been deleted.
The option status has changed from Option to No Status.
The signal code A has been deleted.
CLIN 0006
The CLIN description has changed from Phase 5 to Deleted.
The CLIN extended description has changed from:
Buildings, Areas, Network and Servers – Cadet Area, Falcon Club Area, Prep School Area, Residential Area, Trails, Air Field This CLIN includes all work in the "CCTV Basewide - Phase 5" drawings, except work on the Santa Fe Trail. The contractor shall provide all labor, materials, equipment, supervision, and incidentals to provide and install CCTV Basewide-Phase 5A in accordance with the Statement of Work, drawings, specifications, and contract attachments.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
The unit of issue Lot has been deleted.
The option status has changed from Option to No Status.
The signal code A has been deleted.
CLIN 0007
The CLIN description has changed from Phase 5A to Deleted.
The CLIN extended description has changed from:
Santa Fe Trail This CLIN includes all work shown as a 'Bid Option' for work on the Santa Fe Trail in the drawings for "CCTV Basewide - Phase 5", as shown in Phase 5 drawing sheets CU103, CU104, CU401, CU501, CU502, CU601, CU602, TY701 and TY702. The contractor shall provide all labor, materials, equipment, supervision, and incidentals to provide and install CCTV Basewide-Phase 5B in accordance with the Statement of Work, drawings, specifications, and contract attachments.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
The unit of issue Lot has been deleted.
The option status has changed from Option to No Status.
The signal code A has been deleted.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0003 has been deleted:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
96 dys. ADC 1 N/A
FOB: Destination
The following Delivery Schedule for CLIN 0004 has been deleted:
CAGE
119 dys. ADC 1 N/A
The following Delivery Schedule for CLIN 0005 has been deleted:
CAGE
110 dys. ADC 1 N/A
The following Delivery Schedule for CLIN 0006 has been deleted:
CAGE
98 dys. ADC 1 N/A
The following Delivery Schedule for CLIN 0007 has been deleted:
CAGE
74 dys. ADC 1 N/A
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 CCTV SoW Rev 1 6 31-AUG-2017 Attachment 02 Cameras Rev 1 6 31-AUG-2017
Attachment 03 DVRs 1 01-AUG-2017 Attachment 04 USAFA Erosion Control
Revg Tree Care Stand
12 01-JUN-2013
Attachment 05 HAZMAT CCTV 293 20-SEP-2016 Attachment 06 Wage Determination 6 21-JUL-2017 Attachment 07 Specifications 307 28-MAR-2017 Attachment 08 USAFA Environmental
Standards
27 31-DEC-2016
Attachment 09 Phase 1A Drawings 62 28-MAR-2017 Attachment 10 Phase 1B Drawings 36 28-MAR-2017 Attachment 11 Phase 2 Drawings 40 28-MAR-2017 Attachment 12 Phase 3 Drawings 46 28-MAR-2017 Attachment 13 Phase 4 Drawings 44 28-MAR-2017 Attachment 14 Phase 5 Drawings 37 28-MAR-2017 Attachment 15 Experience 1 01-AUG-2017 Attachment 16 Financial Reference 1 01-AUG-2017 Attachment 17 G002_Typical_All_Phase s
1 28-AUG-2017
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 SoW 6 05-OCT-2017 Attachment 02 Cameras Rev 1 6 31-AUG-2017 Attachment 03 DVRs 1 01-AUG-2017 Attachment 04 USAFA Erosion Control
Revg Tree Care Stand
12 01-JUN-2013
Attachment 05 HAZMAT CCTV 293 20-SEP-2016 Attachment 06 Wage Determination 6 21-JUL-2017 Attachment 07 Specifications 307 28-MAR-2017 Attachment 08 USAFA Environmental
Standards
27 31-DEC-2016
Attachment 09 Phase 1A Drawings 62 28-MAR-2017 Attachment 10 Phase 1B Drawings 36 28-MAR-2017 Attachment 11 Experience 1 01-AUG-2017 Attachment 12 Financial Reference 1 01-AUG-2017 Attachment 13 G002_Typical_All_Phase s
1 28-AUG-2017
The following have been modified:
SITE VISIT INFORMATION
Site visits are planned for 24, 25, & 26 October. Two site visits will be completed each day from 8:30-12:00 and 1:00-4:30 (all times are Mountain). Each site visit will be limited to 8 people. Site visit sign-up will be on a first come first serve basis. Reservations will only be taken via email. Due to limitations a maximum of two (2) representatives from each interested prime contractor may attend the site visit. A prime contractor may choose to send one (1) representative from their company and bring one (1) representative from their sub-contractor’s company for a maximum of two (2) people attending. Each company may only attend one site visit.
Site Visit Requests shall include (if requests do not include the following they will not be processed until all information is received):
1. Full name as appears on driver’s license
2. Company information to include DUNS and/or Cage
3. Email address
4. Phone number – including a mobile phone number that may be used in case of last minute changes to site visit
Send requests via email to heidi.stein.2@us.af.mil and aaron.vollbracht@us.af.mil.
The purpose of this site visit is to allow contractors to look above ceilings and in comm rooms. Be prepared to climb ladders and do a lot of walking. Time will be allotted for breaks; however, attendees will be on their feet for the duration of the site visit.
All contractors shall meet INSIDE the Pass & ID office near the South Gate entrance to USAFA at their designated time. Designated times will be emailed upon receipt of request to attend. Bring a valid driver’s license as you will be receiving a Day Pass to drive to the site visit.
(End of Summary of Changes) mailto:heidi.stein.2@us.af.mil mailto:aaron.vollbracht@us.af.mil
File details come from the government source that posted it. Updated .