Second Site Visit Meeting Minutes

View the file

Other files for this federal contract opportunity

Other files attached to Phases 1A, 1B, & 2 of CCTV System, newest first.
File Type Posted
FA700017R00070006.pdf PDF
CCTV_RFI_as_of_25_Jan_18.pdf PDF
Wage_Determination_12_Jan_18.pdf PDF
Atach_15_Phase_2_Drawings_28_Aug_17.pdf PDF
Atach_02_Cameras_15_Dec_17.pdf PDF
Atach_15_Phase_2_Drawings_28_Aug_17.pdf PDF
CCTV_RFI_6.pdf PDF
USAFA_CCTV_Update_18_Dec_17.pdf PDF
Atach_2_CCTV_-_2nd_Site_Visit_Briefing.pdf PDF
CCTV_RFI_4.pdf PDF
Atach_02_Cameras_Rev_1.pdf PDF
Atach_12_Financial_Reference_Rev_1.pdf PDF
Atach_13_G002_Typical_All_Phases_Rev_1.pdf PDF
FA7000-17-R-0007_Amendment_2_Modification_copy.pdf PDF
FA7000-17-R-0007_Amendment_2_Conformed_Copy.pdf PDF
CCTV_RFI_No._1_Rev_2.pdf PDF
USAFA_CCTV_System_RFP_Extension.pdf PDF
CCTV_RFI_No._1_Rev_1.pdf PDF
Atach_02_Cameras_Rev_1.pdf PDF
FA7000-17-R-0007-0001.pdf PDF
Arnold_Hall_2302_COM_2.jpg JPG image
Arnold_Hall_2302_COM_1.jpg JPG image
Vandenberg_2360_Elect_Room_2.jpg JPG image
Sijan_2348_COM_Room_2.jpg JPG image
Roof_Warranties.pdf PDF
Prep_School_5212_COM_1.jpg JPG image
Prep_School_5212_COM_2.jpg JPG image
Sijan_2348_COM_Room_1.jpg JPG image
CETF_2355_COM_1.jpg JPG image
CCTV_RFI_No._1.pdf PDF
Arnold_Hall_2303_Elect_1.jpg JPG image
Vandenberg_2360_COM_Room_2.jpg JPG image
Atach_17_G002_Typical_All_Phases.pdf PDF
Atach_11_Phase_2_Drawings_28_Aug_17.pdf PDF
Atach_09_Phase_1A_Drawings_28_Aug_17.pdf PDF
Atach_14_Phase_5_Drawings_28_Aug_17.pdf PDF
Atach_12_Phase_3_Drawings_28_Aug_17.pdf PDF
Atach_10_Phase_1B_Drawings_28_Aug_17.pdf PDF
17-R-0007_CCTV_-_Site_Visit_Slides.pdf PDF
17-R-0007_CCTV_-_Site_Visit_Minutes.pdf PDF
Atach_07_Specifications.pdf PDF
Atach_06_Wage_Determination.pdf PDF
Atach_08_USAFA_Environmental_Standards_2016.pdf PDF
Atach_05_HAZMAT_CCTV.pdf PDF
Atach_04_USAFA_Erosion_Control_Reveg_Tree_Care_Stand.pdf PDF
Atach_11_Phase_2_Drawings.pdf PDF
Atach_01_CCTV_SOW_1_Aug_17.pdf PDF
Atach_13_Phase_4_Drawings.pdf PDF
Atach_15_Experience.pdf PDF
Atach_09_Phase_1A_Drawings.pdf PDF
Show all 50

Phases 1A, 1B, & 2 of CCTV System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Serve - Maintain - Protect

DEPARTMENT OF THE AIR FORCE

10TH CONTRACTING SQUADRON

USAF ACADEMY COLORADO

1 November 2017

MEMORANDUM FOR RECORD

SUBJECT: Second Pre-Proposal Site Visit Meeting Minutes, Solicitation FA7000-17-R-0007, USAFA CCTV

System Phases 1A and 1B

1. A second pre-proposal site visit was held for Phases 1A and 1B of the CCTV System at the United States Air

Force Academy (USAFA). Multiple site visits were held to accommodate a detailed site visit. Each site visit followed the same schedule. The site visits were held on 24, 25, and 26 October with two visits each day. One from

08:30 A.M. to 12:00 P.M. and another from 1:00 P.M. to 4:30 P.M. Potential contractors are listed on the attendance sheet (Attachment 1). All attendees met at the Pass & ID office. The Government provided base passes for all attendees that did not possess the proper credentials to get on the USAFA.

2. Before being released from the Pass & ID office, attendees were given an overview briefing of the site visit rules of engagement. Mr. Aaron Vollbracht, Contracting Officer, presented on the first site visit, Mrs. Heidi Stein, Contract Specialist, presented on site visits two, three, and four, Ms. Brittney Biscone, Contract Specialist, presented on site visits five and six. The attendees were then released to drive themselves to Arnold Hall where they met in the lobby with Jerry Branesky (CE), Jaime Krings (CE), and Jeff Rychter (Comm).

3. The site visit started at the Arnold Hall lobby with a discussion on planned camera locations. The group then proceeded down the hall and to the back of the building to view comm and electrical rooms and discussed where exterior cameras would be located plus planned cameras at Haps Lounge. After that the group exited out the main

Arnold Hall entrance, up the steps to the north entrance of Harmon Hall and viewed the two cameras located in this area plus the comm room on the third floor. We then proceeded to the south entrance of Harmon Hall and viewed the three camera locations in this area, two inside and one outside. Next the group proceed across the terrazzo area down the steps to the fourth level, west stairwell entrance of Vandenberg Hall then went to the third level to view the comm and general floor plan area. Then the group viewed a fourth level SAR (Student Activity Room) then went down to the third floor to view a comm and electrical room and walked around some dorm room halls noting various planned camera locations. The group then exited Vandenberg Hall and walked across the terrazzo to Sijan

Hall west stairwell area and viewed a fourth level comm room. After that the group walked down the stairs to the third level noting camera locations in this area then walked down hallway areas noting camera locations then to a

SAR room to view planned camera locations. The group exited Sijan Hall and went back to the parking area and drove to building 4199 to view the computer area where the new servers are to be placed. This concluded the tour.

4. Attendees were reminded of adherence to the strict schedule to ensure that each site visit remained the same.

Each site visit concluded on time and attendees drove off the USAFA when the tour ended at building 4199.

Prepared by:

Heidi Stein

Contract Specialist

Attachment:

1. Attendance Sheet

2. Site Visit Briefing