Attachment 18 SECTION 02716 Drainage Mat.pdf

PDF 82 KB Posted

Attached to
Mitchell Hall Renovation Phase 7 Federal contract opportunity
Solicitation number
FA7000-12-R-0015
Issued by
Department of the Air Force Headquarters Air Force Academy

About this file

Section 02716 Drainage Mat

View the file

Other files for this federal contract opportunity

Other files attached to Mitchell Hall Renovation Phase 7, newest first.
File Type Posted
01 FA7000-12-R-0015-0004 Amendment.pdf PDF
MEMORANDUM TO OFFERORS 5 Sep 12.docx DOCX document
Bid-RFI-Responses-Mitchell Phase 7 RFI Clarification Final.pdf PDF
01 FA7000-12-R-0015-0003 Amendment.pdf PDF
Attachment 06 Addendum 002 rev 1.pdf PDF
Attachment 06 Addendum 002 rev 1.pdf PDF
Bid-RFI-Responses-Mitchell Phase 7 Final.pdf PDF
Attachment 03 Davis Bacon Wage Determination 08172012.pdf PDF
Attachment 08 Praxis Rpt I.pdf PDF
Attachment 10 Praxis Rpt III.pdf PDF
Attachment 12 CS17754-125-R1 soils investigation.pdf PDF
Attachment 14 bid phase sketch sk-1.pdf PDF
Attachment 09 Praxis Rpt II.pdf PDF
Attachment 17 Exposed Aggregate Concrete - Type 2.pdf PDF
Attachment 16 Hot Fluid Applied Rubberized Asphalt Waterproofing.pdf PDF
Attachment 13 USAFA Mitchell Hall ACM Specification.pdf PDF
Attachment 11 Door Project Asbestos Report.pdf PDF
Attachment 05 Addendum 001 rev 1.pdf PDF
Attachment 07 Addendum 003.pdf PDF
Attachment 15 bid phase sketch sk-2.pdf PDF
01 FA7000-12-R-0015-0002 Amendment.pdf PDF
FA7000-12-R-0025 Mitchell Site Vist and attendance Sheets.pdf PDF
01 FA7000-12-R-0015-P02 Amendment.pdf PDF
Brand Name Justification Siemens.pdf PDF
Brand Name Justification Notifier.pdf PDF
Attachment 04 Past Performance Questionnaire.pdf PDF
Attachment 06 Addendum 002.pdf PDF
Attachment 03 Davis Bacon Wage Determination.pdf PDF
FA7000-12-R-0015 Solicitation.pdf PDF
Attachment 05 Addendum 001.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES AIR FORCE ACADEMY IDIQ Rigid Pavements Contract

28 August 2012

Drainage Mat – Section 02716 Page-- 1 –

September 2007

SECTION 02716

DRAINAGE MAT

PART 1 - GENERAL

1.1 Scope

Work under this section consists of installing a prefabricated drainage mat in the following areas:

Plaza Decks: in localized repair areas, as a supporting layer directly beneath the cast-in-place topping slab.

Transition Areas: Between cast-in-place slab-on-grade and supporting angle on basement wall at perimeter of plaza deck (see details).

Submittals: Data illustrating and describing the all the materials of the system and verifying their conformance with the requirements of this specification.

PART 2 - PRODUCTS:

Materials: The drainage mat shall be a prefabricated, composite drainage panel consisting of a three-dimensional. High impact, polystyrene core with a nominal one inch flange on one longitudinal edge and a polymeric sheet adhered to the flat side of the core and a non-woven filter fabric on the other side. The product shall conform to the following material properties:

Component Property Test Method Critical Value

Core Weight

Thickness

Compressive Strength

ASTM D3776

ASTM D1777

ASTM D1621

3.09 oz/sq ft

0.40 in

15,000 lb/sq ft

Filter Fabric Apparent Opening Size

Water Flow Rate

Grab Tensile Strength

Weight

ASTM D4751

ASTM D4991

ASTM D4632

ASTM D3776

#100(U.S. Std. Sieve)

150 gpm/sq ft

100 lb

4.0 oz/sq yd

Composite System Q at 3,600 psf: ASTM D4716 15 gpm/ft of width

UNITED STATES AIR FORCE ACADEMY IDIQ Rigid Pavements Contract

28 August 2012

Drainage Mat – Section 02716 Page-- 2 –

September 2007

Hydraulic Gradient of

1.00

2.2 Acceptable Products: “MiraDrain 6200”, Mirafi Inc or approved equal.

PART 3 - EXECUTION:

Plaza Deck Areas: The drainage mat shall be placed horizontally on clean, smooth substrate as shown on the drawings with no projections or kinks in the material. During placement of concrete overlayment, care shall be taken to prevent damage to filter fabric or core material. Salient characteristics are per previous table.

Transition Areas: Place the drainage mat as detailed on the drawings. Plae the flat side

(not filter material side) against the waterproof membrane under plaza deck pavement as shown. Continue mat down to support angle placement over filter fabric used as trench drain wrap. Secure the drainage mat in place as recommended by the manufacturer to prevent any displacement during backfilling operations.

* * * END OF SECTION * * *