Hot Fluid Applied Rubberized Asphalt Waterproofing

View the file

Other files for this federal contract opportunity

Other files attached to Mitchell Hall Renovation Phase 7, newest first.
File Type Posted
01 FA7000-12-R-0015-0004 Amendment.pdf PDF
MEMORANDUM TO OFFERORS 5 Sep 12.docx DOCX document
Bid-RFI-Responses-Mitchell Phase 7 RFI Clarification Final.pdf PDF
01 FA7000-12-R-0015-0003 Amendment.pdf PDF
Attachment 06 Addendum 002 rev 1.pdf PDF
Attachment 06 Addendum 002 rev 1.pdf PDF
Bid-RFI-Responses-Mitchell Phase 7 Final.pdf PDF
Attachment 18 SECTION 02716 Drainage Mat.pdf PDF
Attachment 12 CS17754-125-R1 soils investigation.pdf PDF
Attachment 14 bid phase sketch sk-1.pdf PDF
Attachment 09 Praxis Rpt II.pdf PDF
Attachment 17 Exposed Aggregate Concrete - Type 2.pdf PDF
Attachment 13 USAFA Mitchell Hall ACM Specification.pdf PDF
Attachment 11 Door Project Asbestos Report.pdf PDF
Attachment 05 Addendum 001 rev 1.pdf PDF
Attachment 07 Addendum 003.pdf PDF
Attachment 15 bid phase sketch sk-2.pdf PDF
Attachment 03 Davis Bacon Wage Determination 08172012.pdf PDF
Attachment 08 Praxis Rpt I.pdf PDF
Attachment 10 Praxis Rpt III.pdf PDF
01 FA7000-12-R-0015-0002 Amendment.pdf PDF
FA7000-12-R-0025 Mitchell Site Vist and attendance Sheets.pdf PDF
01 FA7000-12-R-0015-P02 Amendment.pdf PDF
Brand Name Justification Notifier.pdf PDF
Brand Name Justification Siemens.pdf PDF
Attachment 04 Past Performance Questionnaire.pdf PDF
Attachment 06 Addendum 002.pdf PDF
Attachment 03 Davis Bacon Wage Determination.pdf PDF
FA7000-12-R-0015 Solicitation.pdf PDF
Attachment 05 Addendum 001.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Copyright 2005 AIA MASTERSPEC Short Form 11/05

28 August 2012

HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING 071413 - 1

SECTION 071413 - HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Rubberized-asphalt waterproofing membrane reinforced.

2. Protection Course.

1.2 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Show locations and extent of waterproofing. Include details for substrate joints and cracks, sheet flashings, penetrations, inside and outside corners, tie-ins to adjoining waterproofing, and other termination conditions.

C. Product test reports:

1. Manufacturer’s test reports

2. Field water test reports

D. Sample warranties.

1.3 QUALITY ASSURANCE

A. Installer Qualifications: A firm that is locally based, authorized applicator for installation of waterproofing required for this Project and is eligible to receive warranties specified.

B. Preinstallation Conference: Conduct conference at project site.

1.4 PROJECT CONDITIONS

A. Environmental Limitations: Apply waterproofing within the range of ambient and substrate temperatures recommended by waterproofing manufacturer. Do not apply waterproofing to a damp or wet substrate, or when temperature is below 0 deg F (minus 17.7 deg C).

1.5 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace waterproofing and sheet flashings that do not comply with requirements or that fail to remain watertight within specified warranty period.

1. Warranty Period: Twenty years from date of Substantial Completion.

HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING 071413 - 2

PART 2 - PRODUCTS

2.1 WATERPROOFING MEMBRANE

A. Hot Fluid-Applied, Rubberized-Asphalt Waterproofing Membrane: Single component; 100 percent solids; hot fluid-applied, rubberized asphalt.

1. Products: Subject to compliance with requirements, provide the following:

a. American Hydrotech, Inc.; Monolithic Membrane 6125EV or equal

2.2 FLASHING SHEET MATERIALS

A. Elastomeric Flashing Sheet: 60-mil- (1.5-mm-) minimum, uncured sheet neoprene, American

Hydrotech, Inc. Flex Flash UN or equal.

2.3 AUXILIARY MATERIALS

A. Primer: ASTM D 41, asphaltic primer.

B. Elastomeric Sheet: 60-mil- (1.5-mm-) minimum, uncured sheet neoprene, Hydrotech Flex

Flash UN or equal

C. Sealants and Accessories: Manufacturer's recommended sealants and accessories.

D. Reinforcing Fabric: Manufacturer's recommended, spun-bonded polyester fabric.

E. Horizontal Protection Course: Manufacturer's standard, 3.0 mm thick, fiberglass-reinforced rubberized asphalt or modified bituminous sheet. HAL Industries Perma-Board GG3 FF or equal.

F. Vertical Protection Course – Manufacturer’s standard, 85 mil (2.0 mm) thick, fiberglass – reinforced rubberized asphalt or modified bituminous sheet. American Hydrotech Hydroflex 30 or equal.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean and prepare substrates according to manufacturer's written instructions. Provide clean, dust-free, and dry substrate for waterproofing application.

B. Mask off adjoining surfaces not receiving waterproofing to prevent spillage and overspray affecting other construction.

C. Close off deck drains and other deck penetrations to prevent spillage and migration of waterproofing fluids.

HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING 071413 - 3

D. Remove grease, oil, form-release agents, paints, curing compounds, and other penetrating contaminants or film-forming coatings from concrete.

E. Remove fins, ridges, and other projections and fill honeycomb, aggregate pockets, and other voids.

3.2 JOINTS, CRACKS, AND TERMINATIONS

A. Prepare and treat substrates to receive waterproofing membrane, including joints and cracks, deck drains, corners, and penetrations according to manufacturer's written instructions.

B. At expansion joints and discontinuous deck-to-wall or deck-to-deck joints, bridge joints with elastomeric sheet per manufacturers’ recommendations

3.3 FLASHING INSTALLATION

A. Install elastomeric flashing sheets at terminations of waterproofing membrane according to manufacturer's written instructions.

3.4 MEMBRANE APPLICATION

A. Apply primer, at manufacturer's recommended rate, over prepared substrate and allow to dry.

B. Heat and apply rubberized asphalt according to manufacturer's written instructions.

C. Reinforced Membrane: Apply hot rubberized asphalt to substrates and adjoining surfaces indicated. Spread to a thickness of 90 mils (2.3 mm); embed reinforcing fabric, overlapping sheets 2 inches (50 mm); spread another 125-mil- (3.2-mm-) thick layer to provide a uniform, reinforced, seamless membrane 215 mils (5.5 mm) thick.

D. Apply waterproofing over prepared joints and up wall terminations and vertical surfaces to heights indicated or required by manufacturer.

E. Cover waterproofing with protection course per manufacturers’ recommendations.

3.5 FIELD QUALITY CONTROL

A. Notify the Contracting Officer one day prior to date of performing tests. Before concealment, cover rubberized asphalt waterproofing on horizontal surfaces over finished spaces with ponded water for 24 hours. Do not add water after start of 24 hour period. Carefully measure water level at beginning and end of 24 hour period. If water level falls, remove water and inspect waterproofing membrane. Make repairs or replacement as directed, and repeat test. Do not proceed with work that conceals membrane waterproofing before receiving approval and acceptance of Contracting Officer. Record results and submit all test reports as sections are completed.

HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING 071413 - 4

3.6 CLEANING AND PROTECTION

A. Protect waterproofing from damage and wear during remainder of construction period.

B. Clean spillage and soiling from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

END OF SECTION 071413