Text version
DEPARTMENT OF THE AIR FORCE
10TH MISSION SUPPORT GROUP
USAF ACADEMY, COLORADO
NOTICE: Failure to acknowledge all amendments may cause rejection of the offer.
ADDENDUM 002 REV 1
Repair Mitchell Hall Phase 7.
Date of Issue: 24 August 2012
Project Number: XQPZ 09-0103G
SUBJECT: ADDENDUM No. 002 Rev 1 Drawings and specification for construction of Repair Mitchell Hall Phase 7.
TO: Prospective Offerors and Others Concerned-
The Drawings and Specifications for subject project are hereby modified as follows (revise all Drawings indices lists, Specification indices, table of contents, sections, and attachments lists accordingly)
CLIN 0001:
The contractor shall provide a separate line item pricing for all other items not shown or identified in the drawings below. This will be classified as repair construction by the Government
CLIN 0002:
The contractor shall provide a separate line item pricing for the following items shown in the drawings. This will be classified as minor construction by the Government.
1) Sheet A-401: Key Note 3, 15, 30, 31 and 56.
2) Sheet A-404: Key Note 5, 7, 8, 20, 26, 29, 33 and 38.
3) Sheet A-406: Key Note 16.
4) Sheet A-601: Door 110A, 110B and 110C.
5) Sheet F-101: Key Note 4.
6) Sheet M-101: Key Note 7.
7) Sheet M-103: Key Note 10.
8) Sheet M-110: Key Note 2.
9) Sheet P-101: Key Note 10.
10) Sheet EL-101: Key Note 1.
11) Sheet EP-101: Key Note 5.
12) Sheet EY-101 Key Note:1.
DEPARTMENT OF THE AIR FORCE
10TH MISSION SUPPORT GROUP
USAF ACADEMY, COLORADO
NOTICE: Failure to acknowledge all amendments may cause rejection of the offer.
Revision 1 to this addendum is to add demolition instructions and clarifications.
DEMOLITION INSTRUCTIONS:
Drawing Sheet MD-101 Note 3.
Drawing Sheet MD-103 Note 3.
Drawing Sheet MD-106 Note 3.
Drawing Sheet MD-107 Note 3.
Drawing Sheet MD-110 Note 3.
Drawing Sheet MD-111 Note 3.
Drawing Sheet MD-112 Note 3.
Drawing Sheet MD-113 Note 3.
Drawing Sheet MD-115 Note 3.
Drawing Sheet MD-116 Note 3.
Drawing Sheet MD-402 Note 3.
Drawing Sheet MD-403 Note 3.
The General Demolition Note 3 for each of the drawings shown above reads as follows:
Contractor shall remove all materials as required and shall give the owner the opportunity to inspect such materials for potential salvage. Contractor shall remove from the site all materials deemed “non-salvageable” by the owner. Contractor shall turn over to the owner all materials deemed “salvageable” by the owner.
CLARIFICATION:
For bidding purposes, the contractor shall be responsible for the disposal of all materials removed as part of the demolition work.