Attachment 03 Davis Bacon Wage Determination.pdf
PDF 14 KB Posted
- Attached to
- Mitchell Hall Renovation Phase 7 Federal contract opportunity
- Solicitation number
- FA7000-12-R-0015
About this file
Davis Bacon Wage Determination
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: CO120006 08/03/2012 CO6
Superseded General Decision Number: CO20100006
State: Colorado
Construction Type: Building
County: El Paso County in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories).
Modification Number Publication Date 0 01/06/2012 1 01/27/2012 2 02/24/2012 3 05/18/2012 4 08/03/2012
BRCO0007-002 06/01/2011
Rates Fringes
BRICKLAYER.......................$ 21.97 9.88
CARP0001-003 05/01/2009
Rates Fringes
CARPENTER
(Including Formbuilding/Formsetting)...$ 26.60 8.89
ELEC0113-001 06/01/2011
Rates Fringes
ELECTRICIAN
(Including Low Voltage Wiring and Installation of Fire Alarms, Computers, Telephones and Temperature Controls)...................$ 28.55 14.46
ELEV0025-002 01/01/2012
Rates Fringes
Elevator Constructor.............$ 39.34 23.535
FOOTNOTE:
a. Employer contributes 8% of basic hourly rate for over 5 years' service and 6% basic hourly rate for 6 months' to 5 years' service as Vacation Pay Credit.
PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans Day; Thanksgiving Day; Friday
8/3/2012http://www.wdol.gov/wdol/scafiles/davisbacon/CO6.dvb?v=4 after Thanksgiving Day; and Christmas Day.
ENGI0009-005 05/01/2011
Rates Fringes
Power equipment operators:
Backhoe: 3/4 yd. and over...$ 23.82 9.22 Backhoe: Belt & Elevating...$ 24.12 9.22 Backhoe: under 3/4 yd.......$ 23.67 9.22 Crane: 50 tons and under...$ 23.82 9.22 Crane: 51 to 90 tons.......$ 23.97 9.22 Crane: 91 to 140 tons......$ 24.12 9.22 Crane: 141 tons and over....$ 24.88 9.22 Front End Loader: over 6 cubic yards.................$ 23.82 9.22 Front End Loader: up to and including 6 cy..........$ 23.67 9.22 Roller: self propelled, all types over 5 tons.......$ 23.67 9.22 Roller: self-propelled, rubber tires under 5 tons...$ 23.32 9.22 Scraper: single bowl including pups 40 cubic yards and over and tandem bowls.......................$ 23.97 9.22 Scraper: single bowl under 40 cubic yards..............$ 23.82 9.22 Trackhoe....................$ 23.82 9.22 Water Wagon.................$ 23.67 9.22
IRON0024-002 07/01/2011
Rates Fringes
Ironworker, reinforcing and structural.......................$ 23.80 10.91
LABO0720-001 05/01/2009
Rates Fringes
Laborers:
Common and Concrete/Mason Tenders.....................$ 16.52 6.84
* PAIN0930-001 07/01/2012
Rates Fringes
GLAZIER..........................$ 27.77 7.42
PLAS0577-001 08/01/2011
Rates Fringes
Cement Mason/Concrete Finisher...$ 23.00 10.75
PLUM0058-001 07/01/2011
Rates Fringes
PLUMBER/PIPEFITTER
(Including HVAC pipe) & (Excluding HVAC work).......$ 28.05 12.35
ROOF0058-001 05/01/2010
Rates Fringes
ROOFER...........................$ 20.83 5.43
SHEE0009-001 01/01/2011
Rates Fringes
Sheet metal worker (Includes HVAC duct and installation of HVAC systems)....................$ 31.66 10.98
SUCO2001-007 12/20/2001
Rates Fringes
Carpenters:
Acoustical..................$ 15.02 .76 Drywall Framing/Hanging and Metal Stud Work.........$ 15.16 2.33
Drywall Finisher/Taper...........$ 14.42 .62
Mechanical Insulator/Asbestos Worker (Including application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 13.88
Painters:
Brush, Roller & Spray.......$ 11.29 3.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .