DEPARTMENT OF THE AIR FORCE
10TH MISSION SUPPORT GROUP
USAF ACADEMY, COLORADO
NOTICE: Failure to acknowledge all amendments may cause rejection of the offer.
ADDENDUM 003
Repair Mitchell Hall Phase 7.
Date of Issue: 28 August 2012
Project Number: XQPZ 09-0103G
SUBJECT: ADDENDUM No. 003 Drawings and specification for construction of Repair Mitchell Hall Phase 7.
TO: Prospective Offerors and Others Concerned
The Drawings and Specifications for subject project are hereby modified as follows (revise all Drawings indices lists, Specification indices, table of contents, sections, and attachments lists accordingly)
Changes to the drawings and specifications.
1) The areas of ACM are now located in Section 02080. 1.13 E.2 See the new specification section 02080.
2) Detail 14/S-502 was incorrectly referenced and shall be changed to 2/S-502.
3) The interior gypsum board shown on detail 10/S-502 is not required. Detail 3/A-503 shall be deleted. See new drawing SK-1.
4) Detail 4/A-503 is revised see new drawing SK-1.
5) Structural element sizes shown on 8, 9, & 10/S-502 supersede element sizes shown on detail 4/A-503.
6) The detail shown on 7/S-502 supersedes the attachment shown on detail 5/A-503.
7) Drawing F-104 replace general note #3 with the following.
Fire sprinkler systems will require modifications due to the renovation work within the building. Modifications shall be hydraulically designed, based on occupancy, sprinkler density, design area, maximum sprinkler area coverage, and for the most hydraulically remote areas as indicated in the “fire system design criteria” table.
8) A new drawing SK-2 has been generated to clarify the cable release shown on detail 6/A-501.
9) Top of existing window head elevation is at +/- 7187’-0”. Bottom of roof deck elevation varies with roof slope and truss configuration. Total depth of truss varies from 9’-0” to 7’- 0”.
10) New specification sections shall be added to the construction documents. These sections shall be 071413, 02716 and 033000.2.
File details come from the government source that posted it. Updated .