Attach 13 Drawing Specification Amendment.pdf

PDF 185 KB Posted

Attached to
Repair Community Activity Center (CAC) Building 807 Federal contract opportunity
Solicitation number
FA663322R0001
Issued by
Department of the Air Force Headquarters Secretary of the Air Force

About this file

This document contains an amendment to drawings and specifications for a federal contract solicitation to repair a community activity center building. The amendment revises the contractor laydown area and ceiling specifications. It also updates experience requirements to include one year of J2 innovations controls integration experience plus two years of experience integrating a Niagara-based system. The related solicitation is to provide all services necessary to repair Community Activity Center Building 807 at Minneapolis Air Reserve Station for $39.5 million or less. The 100% small business set-aside is a firm fixed price contract requiring registration in SAM and a bid guarantee. The proposal acceptance period ends 30 September 2022 for the Air Force project.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Community Activity Center (CAC) Building 807, newest first.
File Type Posted
Attach 13 Drawing Specification Amendment 3 rev.2.pdf PDF
20220603 RFI CAC.pdf PDF
20220603 Solicitation Amendment FA663322R00010003 SF 30.pdf PDF
20220601 RFI CAC.pdf PDF
Garbage Disposal RFI 99.pdf PDF
20220516 Site Visit Attendance.pdf PDF
Hobart 44 ventless RFI Attach.pdf PDF
DFAC dishwasher room layout RFI Attach.pdf PDF
20220516 Site Visit Attendance.pdf PDF
20220516 Solicitation Amendment FA663322R00010002 SF 30.pdf PDF
Asbestos Reports.zip ZIP file
20220516 RFI CAC.pdf PDF
20220422 MFR POC Change.pdf PDF
20220408 Solicitation Amendment FA663322R00010001 SF 30.pdf PDF
Attach 8 Section L_0407 Amend 1.pdf PDF
20220408 RFI CAC.pdf PDF
Solicitation - FA663322R0001.pdf PDF
Attachment 1_ QJKL 18-0024 Specifications Book 1.pdf PDF
Attachment 5_ Wage Determination.pdf PDF
Attachment 6_ Submittal Register.pdf PDF
Attachment 11_ Sample Client Authorization Letter.docx DOCX document
Attachment 4_ QJKL 18-0024 - Statement of Work (SOW).pdf PDF
Attachment 9_ Section M.pdf PDF
Attachment 10_ Consent Letter.docx DOCX document
Attachment 12_ Progress Schedule.xls XLS spreadsheet
Attachment 2_ QJKL 18-0024 - Contract Specifications Book 2.pdf PDF
Attachment 3_ QJKL 18-0024 - Contract Drawings.pdf PDF
Attachment 7_ Financial Institution Ref. Sheet.pdf PDF
Attachment 8 Section L_0331.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 13 Amendement-1 CAC Repair Project QJKL-18-0024 13 May 2022

CHANGE #1 – Revision to Laydown Area (drawing G-008).

FROM: Contractor Laydown Area “A” with Alternate Area “B”

TO: Alternate Laydown Area “B” AND Additional Laydown area along Apollo Ave.

CHANGE #2 - Revision to drawings AD101, AD102, AD103, and AD401 Note D10

FROM: Ceiling Tile and Grid to be removed as require for installation of fire suppression system. Salvage existing ceiling tile and grid for reuse in same location.

CHANGED TO READ: Ceiling Tile and Grid to be removed for installation of fire suppression system.

CHANGE #3 - Revisions to Attachment 8, Section L, Volume III: Written Proposal, 1. Format and Specific Content: Subfactor 1

FROM: Subfactor 1: Qualifications and prior experience identifying at least three (3) years’ experience of related work: retrofit projects and specifically Monaco fire alarm & mass notification, and J2 Innovations Fin Stack direct digital controls.

Provide valid training documentation for at least one expected Monaco installer and documented J2 Innovations Fin Stack software integration with an existing central control system.

TO: Subfactor 1: Qualifications and prior experience identifying at least three (3) years’ experience of related work: retrofit projects and specifically Monaco fire alarm & mass notification, and J2 Innovations Fin Stack direct digital controls OR 1 years’ experience of related work of J2 innovations Fin Stack direct digital controls plus 2 years of integration from an existing Niagara based central control system to another DDC controls product. Provide valid training documentation for at least one expected Monaco installer and documented J2 Innovations Fin Stack software integration with an existing central control system.