Attachment 6_ Submittal Register.pdf
PDF 640 KB Posted
- Attached to
- Repair Community Activity Center (CAC) Building 807 Federal contract opportunity
- Solicitation number
- FA663322R0001
About this file
This is a solicitation for repair services for a community activity center building at the Minneapolis Air Reserve Station in Minnesota. The contractor shall provide all professional services, permits, supervision, labor, materials and equipment necessary to fully meet the requirements outlined in the statement of work, construction specifications, and construction drawings. Funds are not presently available and no award will be made until funding is in place. The government reserves the right to cancel the solicitation before or after the closing date with no obligation to reimburse offerors for any costs. The set-aside is for 100% total small business with a size standard of $39.5 million. All offerors must be registered in SAM to receive an award. A bid guarantee is required in accordance with FAR 52.228-1 and proposals must be valid until 30 September 2022.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 64 PAGES
AFRC 934th Airlift Community Center
01 11 00 SD-01 Preconstruction Submittals
1.6 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 GList of Contact Personnel
01 20 00.00 20 SD-01 Preconstruction Submittals
1.3 GSchedule of Prices
01 30 00 SD-01 Preconstruction Submittals
1.4 GView Location Map
1.5 GProgress and Completion
Pictures
SD-04 Samples
1.3 GColor Boards
01 32 16.00 20 SD-01 Preconstruction Submittals
1.3 GPreliminary Project Schedule
1.4 GInitial Project Schedule
1.5 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.1 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 64 PAGES
01 33 29 1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
1.5.3.1 GFinal Sustainability eNotebook
1.5.3.1 GAmended Final Sustainability
eNotebook
1.5.3.1 GAmended Final High
Performance and Sustainable
Building Checklist
GThird Party Certification
Certificate, Assessment, or
Validation
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 64 PAGES
01 35 26 1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
GSIOR Letter of Acceptance
GProject Manual
Written NDT Practices
SD-06 Test Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Certificate of Compliance
1.5 GSpecial Inspector
Qualification Records
SD-11 Closeout Submittals
3.1.2 GInterim Report
3.1.2 GComprehensive Final Report
01 58 00 SD-02 Shop Drawings
GSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 64 PAGES
01 74 19 1.6 GConstruction Waste Management
Plan
SD-06 Test Reports
1.8.2Quarterly Reports
1.8.3Annual Report
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan
1.8.5Warranty Tags
1.6Spare Parts Data
SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
GRecord Model
1.8.1As-Built Record of Equipment and Materials
3.6As-Built Record of Equipment and Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 64 PAGES
01 78 00 3.4 GFinal Approved Shop Drawings
3.5 G SConstruction Contract
Specifications
2.2 GCertification of EPA Designated
Items
3.9.1 GInterim DD FORM 1354
3.9.2 GChecklist for DD FORM 1354
3.9.2 G SHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 64 PAGES
01 91 00.15 10 3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.2 G DOFinal Construction Phase
Commissioning Plan
3.1.2.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.1.4.2 G DOBuilding Envelope Inspection
Checklists
3.1.4.3 G DOPre-Functional Checklists
1.8Issues Log
3.2 G DOCommissioning Report
SD-07 Certificates
1.9 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.5 G ROTraining Plan
3.1.5 G ROTraining Attendance Rosters
SD-11 Closeout Submittals
3.2 S DOFinal Commissioning Report
3.1.2.2 SFinal Construction Phase
Commissioning Plan
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
GDeconstruction Plan
1.9Existing Conditions
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 64 PAGES
02 41 00 1.6 GNotification
SD-11 Closeout Submittals
3.2.4Receipts
02 42 51 SD-01 Preconstruction Submittals
1.4.2 GDust-Control Measures
1.4.2 GPacking and Transportation
Measures
1.4.4 GSchedule of Carpet Reclamation
Activities
1.4.3 GCarpet Reclamation Agency
Records
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
GOnsite Hazardous Waste
Management
3.2Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.5 GRecordkeeping
3.5 GException Report
3.6Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 64 PAGES
02 81 00 1.4.2 GTraining
1.4.3Certification
3.2.3 GShipping Documents and
Packagings Certification
3.2.4Security Plan
3.2.5Certificates of Disposal
3.4Waste Minimization
02 82 00 SD-03 Product Data
1.2.2 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
2.1 GEncapsulants
3.1.2.1 GRespirators
3.1.6 GLocal Exhaust Equipment
3.1.6 GPressure Differential Automatic
Recording Instrument
3.1.7 GVacuums
3.1.9 GGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.13.5 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 64 PAGES
02 82 00 1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.9 GFederal, State or Local Citations
on Previous Projects
2.1 GEncapsulants
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 GWater Filtration Equipment
3.1.7 GVacuums
3.1.7 GVentilation Systems
SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 64 PAGES
02 82 00 1.3.7.1 GRespirator Program Records
1.5.7 GProtective Clothing
Decontamination Quality Control
Records
1.5.8 GProtective Clothing
Decontamination Facility
Notification
1.7.1 GRental Equipment
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.3Recycled Aggregate Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 64 PAGES
03 30 00 2.3.1Cementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
1.8.1Local/Regional Materials
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
1.6.3.4Finishing Plan
2.4.2Nonshrink Grout
SD-04 Samples
1.6.5.1Slab Finish Sample
1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 64 PAGES
03 30 00 1.6.4.2Slag Cement
1.6.4.3Aggregates
3.10.2.1Tolerance Report
3.14.2.3 GCompressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete
3.14.2.6Chloride Ion Concentration
3.14.2.4Air Content
3.14.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.6.3.3Silica Fume Manufacturer's
Representative
1.6.3.5VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.6Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 64 PAGES
03 30 00 2.4.5Joint Sealants
2.4.1Curing Compound
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.4Galvanizing Repair Paint
2.2.16Mechanical Fasteners
2.1.4Touch-Up Paint
Sound Absorbing Materials
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
Cellular Metal Floor Deck Units
2.2.4Flexible Closure Strips
2.2.15Acoustical Material
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 64 PAGES
05 30 00 1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
Stud Manufacture's Certification
Stud Manufacture's Test Reports
06 10 00 SD-03 Product Data
2.5.2Fiberboard Wall Sheathing
1.4.3Structural-use and OSB Panels
2.3.2.2Structural-use and OSB Panels
2.3Oriented Strand Board
SD-05 Design Data
1.8.2 GModifications of Structural
Members
SD-06 Test Reports
1.4.4Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
SCertified Sustainably Harvested
Virgin Lumber
2.1.2 SCertified Sustainably Harvested
Natural-decay and Insect-resistant
Wood
2.2.2 SCertified Sustainably Harvested
Framing Lumber
SCertified Sustainably Harvested
Structural Glued Laminated Timber
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 64 PAGES
06 10 00 2.3.1.1 SCertified Sustainably Harvested
Plywood Subflooring
2.3.1.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Subfloor Sheathing
SCertified Sustainably Harvested
Plywood Combination Subfloor
Underlayment
2.3.2.1 SCertified Sustainably Harvested
Plywood Wall Sheathing
2.3.2.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Wall Sheathing
2.3.3.1 SCertified Sustainably Harvested
Plywood Roof Sheathing
2.3.4.1 SCertified Sustainably Harvested
Plywood Diaphragm
2.3.4.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Diaphragm
2.3.5.1 SCertified Sustainably Harvested
Plywood Shear Wall
2.3.5.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Shear Wall
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 64 PAGES
06 10 00 SCertified Sustainably Harvested
Plywood for Other Uses
SCertified Sustainably Harvested
Structural-use and OSB Panels for
Other Uses
2.4.3 SCertified Sustainably Harvested
Plywood Underlayment
1.7Preservative Treatment
2.4.2 SIndoor Air Quality for
Particleboard Underlayment
2.4.5 SIndoor Air Quality for Fiberboard
Underlayment
2.4.6 SIndoor Air Quality for Strawboard
Panels
2.5.2 SIndoor Air Quality for Fiberboard
Wall Sheathing
2.5.10 SIndoor Air Quality for Aerosol
Adhesives
2.5.10 SIndoor Air Quality for Non-aerosol
Adhesives
SD-10 Operation and Maintenance
Data
3.6Take-back Program
06 61 16 SD-02 Shop Drawings
GDetail Fabrication Drawings
3.1 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 64 PAGES
06 61 16 SD-03 Product Data
2.1.1 GSolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.4 GCounter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
SIndoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 GSolid Polymer
07 21 16 SD-03 Product Data
Blanket Insulation; AE, G
2.1.1 SRecycled Content for Insulation
Materials
Accessories
SD-07 Certificates
2.1.3 SIndoor Air Quality for Insulation
Materials
SD-08 Manufacturer’s Instructions
3.3.1Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 64 PAGES
07 21 23 SD-03 Product Data
Loose Fill Insulation; AE, G
2.1.2 SRecycled Content for Insulation
Materials
Sill Sealer Insulation
Vapor Retarder
Pressure Sensitive Tape
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
SD-08 Manufacturer’s Instructions
2.1Loose Fill Insulation
07 22 00 SD-02 Shop Drawings
1.3Insulation Board Layout
AE, G
1.3Verification of Existing Conditions
SD-03 Product Data
2.1Insulation
AE, G
2.5 GFasteners
2.3 GSheathing Paper
2.4 GMoisture Control
1.10.1 GAsphalt
2.1.3 SRecycled Content For Insulation
SD-06 Test Reports
1.8.1Flame Spread Rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 64 PAGES
07 22 00 AE, G
SD-07 Certificates
1.6 GInstaller Qualifications
1.6 GCertificates Of Compliance For
Felt Materials
2.1.4 SIndoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.5 GFasteners
2.1 GInsulation
07 31 13 SD-03 Product Data
Shingles; AE, G
2.1.1 SEnergy Star Label for Asphalt
Shingle
SHeat Island Reduction
SD-04 Samples
2.1.1Shingles
AE, G
2.1.1Color Charts
SD-08 Manufacturer’s Instructions
3.3Application
SD-11 Closeout Submittals
Manufacturer's Warranty; G
Contractor's Warranty; G
07 53 23 SD-02 Shop Drawings
Roof Plan Drawing; AE, G
Wind Load Calculations; AE, G
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 64 PAGES
07 53 23 1.3.1Boundaries of Enhanced
Perimeter
1.3.1Corner Attachments of Roof
System Components
1.3.1Location of Perimeter Half-Sheets
1.3.1Spacing of Perimeter, Corner, and Infield Fasteners
1.3.1Slopes and Drain Locations
SD-03 Product Data
2.1.1EPDM Sheet
AE, G
Seam Tape; AE, G
Bonding Adhesive; AE, G
Lap Splice Adhesive; AE, G
Water Cutoff Mastic/Water Block;
AE, G
Lap Cleaner, Lap Sealant, and
Edge Treatment; AE, G
Flashings; AE, G
Flashing Accessories; AE, G
2.1.8.1Flashing Tape
Fasteners and Plates; AE, G
Roof Insulation; AE, G
Protection Mat; AE, G
Pre-Manufactured Accessories;
AE, G
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 64 PAGES
07 53 23 1.8 GWarranty
SD-05 Design Data
1.4.4Wind Uplift Calculations
AE, G
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.4Wind Uplift Resistance
AE, G
1.4.3Fire Resistance
SD-08 Manufacturer’s Instructions
3.2 GApplication
3.2.3 GApplication Method
3.3.2 GMembrane Flashing
2.1.3Seam Tape
3.2.4Tape Seams / Lap Splices
3.2.5Adhesive Seams / Lap Splices
3.2.6Perimeter Attachment
3.2.4Primer
3.2.7Fasteners
Pre-Manufactured Accessories
1.6 GCold Weather
SD-11 Closeout Submittals
1.8Warranty
3.10Information Card
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 64 PAGES
07 53 23 3.9Instructions To Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
AE, G
3.1.13Gutters
3.1.14Downspouts
2.2.1Gravel Stops and fascia
3.1.15Flashing for Roof Drains
3.1.10Base Flashing
Counterflashing
3.1.21Flashing at Roof Penetrations and Equipment Supports
3.1.16Scuppers
3.1.23 GCopings
3.1.12Drip Edges
3.1.18Eave Flashing
2.1 SRecycled Content
SD-04 Samples
1.4.2Finish Samples
AE, G
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 64 PAGES
07 60 00 1.4.3 GCleaning and Maintenance
07 92 00 SD-03 Product Data
2.1Sealants
AE, G
2.2Primers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
SIndoor Air Quality For Interior
Acoustical Sealants
SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
AE, G
2.2 GFrames
2.2 GFrames
Accessories
SD-03 Product Data
2.1 GDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 64 PAGES
08 11 13 2.1 SRecycled Content for Steel Door
Product
2.2 GFrames
2.2 SRecycled Content for Steel Frame
Product
Accessories
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
3.3Installation Drawings
AE, G
2.2Fabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.2 GFinish
2.1.1.2 SRecycled Content of Aluminum
Material
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
3.4.3Deflection
3.4.1Air Infiltration
3.4.4Condensation Resistance and
Thermal Transmittance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 64 PAGES
08 41 13 3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6Manufacturer's Product Warranty
08 51 13 SD-02 Shop Drawings
2.1Windows
AE, G
1.7Fabrication Drawings
SD-03 Product Data
2.1Windows
AE, G
2.1 SRecycled Content of Aluminum
Windows
2.2.6.1 GHardware
2.2.2 GFasteners
1.8Window Performance
2.4Thermal-Barrier Windows
GMullions
GWindow Cleaners' Bolts
2.2.8 GScreens
2.1.5 GWeatherstripping
2.2.6 GAccessories
2.2.3Adhesives
1.8.5Thermal Performance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 64 PAGES
08 51 13 1.8.5 SEnergy Star Label For Residential
Aluminum Window Products
SD-04 Samples
1.3.3.1Finish Sample
1.3.3.2Window Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
1.3.4 GDesign Analysis
SD-06 Test Reports
1.3.5Minimum Condensation
Resistance Factor
Windborne-Debris-Impact
Performance
SD-07 Certificates
Engineer's Qualifications
SD-10 Operation and Maintenance
Data
2.1 GWindows
1.5Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3Manufacturer's Detail Drawings
AE, G
1.3 GVerification of Existing Conditions
1.5Hardware Schedule
2.3.5 GKeying System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 64 PAGES
08 71 00 SD-03 Product Data
2.3Hardware Items
AE, G
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
Insulating Glass; AE, G
Blast Resistant Interlayer; AE, G
1.3Glazing Accessories
2.4.1.1Sealants
SD-04 Samples
2.3Insulating Glass
Glazing Compound
2.4.3Tape
2.4.3Sealing Tapes
SD-07 Certificates
Insulating Glass; AE, G
Blast Resistant Interlayer; AE, G
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 64 PAGES
08 81 00 SD-11 Closeout Submittals
Insulated Glass Units; AE, G
09 22 00 SD-02 Shop Drawings
2.1Metal Support Systems
AE, G
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.5Cementitious Backer Units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.2Water-Resistant Gypsum Backing
Board
2.1.8Accessories
2.1.1Gypsum Board
SRecycled Content for Gypsum
Board
SRecycled Content for Paper
Facing and Gypsum Cores
2.1.6 SVOC Content of Joint Compound
SD-06 Test Reports
GASTM E90 Factory Test Report
GASTM E336 Field Test Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 64 PAGES
09 29 00 2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
SIndoor Air Quality for Non-aerosol
Adhesives
SIndoor Air Quality for Aerosol
Adhesives
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GPorcelain Tile
2.1.1 SRecycled Content for Porcelain
Tile
GGauged Porcelain Tile
2.1.2 GQuarry Tile
2.1.3 GMosaic Tile
2.1.3 SRecycled Content for Mosaic Tile
2.1.4 GGlazed Ceramic Wall Tile
2.1.4 SRecycled Content for Glazed
Ceramic Wall Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 64 PAGES
09 30 10 2.1 GTransition Strips
2.6.1 GMetal Strips
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
GCementitious Backer Units
GGlass-Mat Gypsum
Water-Resistant Backing Board
2.7 GWaterproof Membrane
2.8 GCrack Isolation Membrane
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.6.1 GMetal Strips
GGrout
SD-07 Certificates
2.4 SIndoor Air Quality for Adhesives
SIndoor Air Quality for Sealants
1.3.2Water Absorption Rates
SD-08 Manufacturer’s Instructions
3.8Manufacturer's Approved
Cleaning Instructions
SD-10 Operation and Maintenance
Data
GGauged Porcelain Tile
2.1.1 GPorcelain Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 64 PAGES
09 30 10 2.1.2 GQuarry Tile
2.1.3 GMosaic Tile
2.1.4 GGlazed Ceramic Wall Tile
2.1 GTransition Strips
2.6.1 GMetal Strips
09 51 00 SD-02 Shop Drawings
2.1Approved Detail Drawings
AE, G
SD-03 Product Data
Acoustical Ceiling Systems
AE, G
2.2.1.1 SRecycled Content for Type XII
Ceiling Tiles
2.3 SRecycled Content for Suspension
Systems
2.1.1 GAcoustical Performance
SD-04 Samples
2.2 GAcoustical Units
Acoustical Ceiling Tiles
AE, G
SD-07 Certificates
SIndoor Air Quality for Type IX
Ceiling Tiles
2.2.1.1 SIndoor Air Quality for Type XII
Ceiling Tiles
SIndoor Air Quality for Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 64 PAGES
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories
SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives
2.1Vinyl Composition Tile
SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
SIndoor Air Quality for Vinyl
Composition Tile
SIndoor Air Quality for Wall Base
2.4 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.8 GResilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 64 PAGES
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.1 GCarpet
SRecycled Content for Carpeting
2.4 GMoldings
2.3 SIndoor Air Quality for Aerosol
Adhesives
2.3 SIndoor Air Quality for Non-Aerosol
Adhesives
2.3 SIndoor Air Quality for Concrete
Primer
SD-04 Samples
2.1 GCarpet
2.4 GMoldings
GCarpet Cushion
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1.1 SIndoor Air Quality for Carpet
SIndoor Air Quality for Fiber
Cushion
SIndoor Air Quality for Rubber
Cushion
SIndoor Air Quality for
Polyurethane-Foam Cushion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 64 PAGES
09 68 00 SD-08 Manufacturer’s Instructions
3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
Maintenance Service
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-02 Shop Drawings
Piping Identification
SD-03 Product Data
2.1 GCoating
Sealant
SD-04 Samples
1.10 GColor
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2 GQualification Testing
2.1Indoor Air Quality for Paints and
Primers
2.1Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
3.5.2Mixing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 64 PAGES
09 90 00 1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings
AE, G
SD-03 Product Data
2.1Room Identification And
Directional Signage System
AE, G
SD-04 Samples
1.3.1 GInterior Signage
GSoftware
2.1 GRoom Identification And
Directional Signage System
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.2 GInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 64 PAGES
10 21 13 2.1Cleaning and Maintenance
Instructions
2.8Colors And Finishes
Painted Metal
2.2.2Anchoring Devices and Fasteners
2.2.4Hardware and Fittings
2.2.3Brackets
2.2.5Door Hardware
2.6Pilaster Shoes
2.2.4.2Finishes
2.8.2Finishes
AE, G
SRecycled content for plastic laminate partitions and screens
SD-04 Samples
2.8 GColors and Finishes
2.2.4Hardware and Fittings
2.2.2Anchoring Devices and Fasteners
SD-07 Certificates
1.6Warranty
2.3 SIndoor air quality for plastic
laminate clad partitions and screens
SIndoor air quality for solid phenolic, black core partitions and screens
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 64 PAGES
10 28 13 SD-02 Shop Drawings
2.1 GProduct Schedule
SD-03 Product Data
2.1 SRecycled content for stainless
steel toilet accessories
2.1.3Item A5080
AE, G
2.1.4Item A5090
2.1.5Item A5109
2.1.6Item A5200
SD-10 Operation and Maintenance
Data
2.1.3 GItem A5080
2.1.4 GItem A5090
2.1.5 GItem A5109
2.1.6 GItem A5200
11 05 40 SD-01 Preconstruction Submittals
1.3 GContractor's Field Verification
Data
1.5.6 GManufacturer's Qualifications
SD-02 Shop Drawings
1.5.6 GDetail Drawings
GFood Service Equipment
Schedule
1.5.6 GUtilities
1.5.6 GCustom Fabricated Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 64 PAGES
11 05 40 1.5.6 GInstallation Instructions and
Diagrams
SD-03 Product Data
1.3.1Food Service Equipment
1.5.6Food Preparation Equipment
SD-04 Samples
1.5.6 GExterior Panel Finish Material
1.5.6 GInterior Panel Finish Material
1.5.6 GSample Warranty
SD-05 Design Data
1.5.6 GManufacturer's Descriptive And
Technical Literature
SD-06 Test Reports
1.5.6 GManufacturer's Test Data
3.6.2 GField Test Reports
SD-07 Certificates
1.5.2National Sanitation Foundation
Standards
1.5.5Underwriters Laboratories
Standards
1.5.1Energy Star Labeled
1.5.1PL 109-58 Compliant
SD-08 Manufacturer’s Instructions
1.5.6 GManufacturer's Instructions
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 64 PAGES
11 05 40 3.4 GOperation and Maintenance
Manuals
3.5 GList of Authorized Local Service
and Repair Entities
SD-11 Closeout Submittals
3.7 GManufacturer's Warranty
3.8 GContractor's Warranty for
Installation
11 06 40.13 SD-02 Shop Drawings
2.1.2 GSchedule
11 41 11 SD-01 Preconstruction Submittals
1.3 GContractor's Field Verification
Data
SD-02 Shop Drawings
1.5 GManufacturer's Detail Drawings
1.5 GCustom Fabricated Equipment
1.5 GInstallation Instructions and
Diagrams
SD-03 Product Data
GWalk-in Refrigerators
GFreezers
SD-05 Design Data
1.6.1 GManufacturer's Descriptive and
Technical Literature
SD-06 Test Reports
1.6.2 GManufacturer's Test Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 64 PAGES
11 41 11 3.2.2 GField Test Reports
SD-07 Certificates
1.6.2NSF Certification
1.6.2UL Certification
SD-08 Manufacturer’s Instructions
1.6.1Manufacturer's Instructions
SD-11 Closeout Submittals
3.3Manufacturer's Warranty
3.4Contractor's Warranty for
Installation
11 48 00 SD-01 Preconstruction Submittals
1.3 GContractor's Field Verification
Data
SD-02 Shop Drawings
1.5.1 GInstallation Instructions and
Diagrams
SD-06 Test Reports
GManufacturer's Test Data
3.2.2 GField Test Reports
SD-08 Manufacturer’s Instructions
GManufacturer's Instructions
SD-10 Operation and Maintenance
Data
GFood Service Cleaning and
Disposal Equipment
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 64 PAGES
11 48 00 3.3Manufacturer's Warranty
3.4Contractor's Warranty for
Installation
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection Engineer
(QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
GPipe
2.2.1.2 GFittings
2.2.4 GValves
GAlarm Valves
2.7.5 GRelief Valves
2.6 GSprinklers
2.2.3 GPipe Hangers and Supports
2.3.1 GSprinkler Alarm Switch
2.3.2 GValve Supervisory (Tamper)
Switch
2.5 GFire Department Connection
2.4 GBackflow Prevention Assembly
2.7.6 GAir Vent
2.4.1 GHose Valve
2.1.2 GNameplates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 64 PAGES
21 13 13 SD-05 Design Data
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.6.1 GTest Procedures
SD-07 Certificates
3.6.2.1 GVerification of Compliant
Installation
3.6.2.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
3.8 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.8As-built drawings
21 13 16 SD-01 Preconstruction Submittals
1.2.4 GQualified Fire Protection Engineer
(QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
1.4.2.3 GNitrogen Generation System
Commissioning Technician
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 64 PAGES
21 13 16 GPipe
2.2.1.2 GFittings
2.2.3 GValves
2.9.4 GRelief Valves
2.8 GSprinklers
2.2.2 GPipe Hangers and Supports
2.5.1 GSprinkler Alarm Switch
2.5.3 GValve Supervisory (Tamper)
Switch
2.7 GFire Department Connection
2.6 GBackflow Prevention Assembly
2.6.1 GHose Valve
2.5.2 GHigh/Low-Nitrogen Pressure
Supervisory Switch
1.4.2.3 GNitrogen Generation System
2.1.2 GNameplates
2.3 GDry Pipe Valve
SD-05 Design Data
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.6.1 GTest Procedures
SD-07 Certificates
3.6.2.1 GVerification of Compliant
Installation
3.6.2.2 GRequest for Government Final
Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 64 PAGES
21 13 16 SD-10 Operation and Maintenance
Data
3.8 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.8As-built drawings
22 00 00 SD-02 Shop Drawings
3.7.1 GPlumbing System
SD-03 Product Data
2.4.1 SWaterSense Label for Flush
Valve Water Closet
2.4.2 SWaterSense Label for Urinal
Countertop Lavatories
SWaterSense Label for Lavatory
Faucet
SEnergy Star Label for Electric
Water Cooler
SEnergy Star Label for Wheelchair
Electric Water Cooler
Plastic Bathtubs
GWater Heaters
2.8.1.1 SEnergy Star Label for Gas
Storage Water Heater
2.9 GPumps
3.7.1.1 GBackflow Prevention Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P…
This is the start of the file's text. The full file is on GovTribe.