Attachment 6_ Submittal Register.pdf

PDF 640 KB Posted

Attached to
Repair Community Activity Center (CAC) Building 807 Federal contract opportunity
Solicitation number
FA663322R0001
Issued by
Department of the Air Force Headquarters Secretary of the Air Force

About this file

This is a solicitation for repair services for a community activity center building at the Minneapolis Air Reserve Station in Minnesota. The contractor shall provide all professional services, permits, supervision, labor, materials and equipment necessary to fully meet the requirements outlined in the statement of work, construction specifications, and construction drawings. Funds are not presently available and no award will be made until funding is in place. The government reserves the right to cancel the solicitation before or after the closing date with no obligation to reimburse offerors for any costs. The set-aside is for 100% total small business with a size standard of $39.5 million. All offerors must be registered in SAM to receive an award. A bid guarantee is required in accordance with FAR 52.228-1 and proposals must be valid until 30 September 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Community Activity Center (CAC) Building 807, newest first.
File Type Posted
20220603 RFI CAC.pdf PDF
Attach 13 Drawing Specification Amendment 3 rev.2.pdf PDF
20220603 Solicitation Amendment FA663322R00010003 SF 30.pdf PDF
Garbage Disposal RFI 99.pdf PDF
20220601 RFI CAC.pdf PDF
20220516 Site Visit Attendance.pdf PDF
Hobart 44 ventless RFI Attach.pdf PDF
DFAC dishwasher room layout RFI Attach.pdf PDF
20220516 Site Visit Attendance.pdf PDF
20220516 Solicitation Amendment FA663322R00010002 SF 30.pdf PDF
Asbestos Reports.zip ZIP file
Attach 13 Drawing Specification Amendment.pdf PDF
20220516 RFI CAC.pdf PDF
20220422 MFR POC Change.pdf PDF
20220408 Solicitation Amendment FA663322R00010001 SF 30.pdf PDF
Attach 8 Section L_0407 Amend 1.pdf PDF
20220408 RFI CAC.pdf PDF
Attachment 4_ QJKL 18-0024 - Statement of Work (SOW).pdf PDF
Attachment 9_ Section M.pdf PDF
Attachment 10_ Consent Letter.docx DOCX document
Attachment 12_ Progress Schedule.xls XLS spreadsheet
Attachment 2_ QJKL 18-0024 - Contract Specifications Book 2.pdf PDF
Attachment 3_ QJKL 18-0024 - Contract Drawings.pdf PDF
Attachment 7_ Financial Institution Ref. Sheet.pdf PDF
Attachment 8 Section L_0331.pdf PDF
Solicitation - FA663322R0001.pdf PDF
Attachment 1_ QJKL 18-0024 Specifications Book 1.pdf PDF
Attachment 5_ Wage Determination.pdf PDF
Attachment 11_ Sample Client Authorization Letter.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 64 PAGES

AFRC 934th Airlift Community Center

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 GList of Contact Personnel

01 20 00.00 20 SD-01 Preconstruction Submittals

1.3 GSchedule of Prices

01 30 00 SD-01 Preconstruction Submittals

1.4 GView Location Map

1.5 GProgress and Completion

Pictures

SD-04 Samples

1.3 GColor Boards

01 32 16.00 20 SD-01 Preconstruction Submittals

1.3 GPreliminary Project Schedule

1.4 GInitial Project Schedule

1.5 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.1 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 64 PAGES

01 33 29 1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

1.5.3.1 GFinal Sustainability eNotebook

1.5.3.1 GAmended Final Sustainability

eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable

Building Checklist

GThird Party Certification

Certificate, Assessment, or

Validation

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 64 PAGES

01 35 26 1.14License Certificates

1.14.1 GRadiography Operation Planning

Work Sheet

1.14.1 GPortable Gauge Operations

Planning Worksheet

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

GSIOR Letter of Acceptance

GProject Manual

Written NDT Practices

SD-06 Test Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Certificate of Compliance

1.5 GSpecial Inspector

Qualification Records

SD-11 Closeout Submittals

3.1.2 GInterim Report

3.1.2 GComprehensive Final Report

01 58 00 SD-02 Shop Drawings

GSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 64 PAGES

01 74 19 1.6 GConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Quarterly Reports

1.8.3Annual Report

SD-11 Closeout Submittals

1.9 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

GRecord Model

1.8.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 64 PAGES

01 78 00 3.4 GFinal Approved Shop Drawings

3.5 G SConstruction Contract

Specifications

2.2 GCertification of EPA Designated

Items

3.9.1 GInterim DD FORM 1354

3.9.2 GChecklist for DD FORM 1354

3.9.2 G SHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

1.7 G DOCommissioning Firm's Contract

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 64 PAGES

01 91 00.15 10 3.1.2.1 G DOInterim Construction Phase

Commissioning Plan

3.1.2.2 G DOFinal Construction Phase

Commissioning Plan

3.1.2.1.2 G DOTemplate Building Envelope

Inspection Checklists

3.1.4.2 G DOBuilding Envelope Inspection

Checklists

3.1.4.3 G DOPre-Functional Checklists

1.8Issues Log

3.2 G DOCommissioning Report

SD-07 Certificates

1.9 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.5 G ROTraining Plan

3.1.5 G ROTraining Attendance Rosters

SD-11 Closeout Submittals

3.2 S DOFinal Commissioning Report

3.1.2.2 SFinal Construction Phase

Commissioning Plan

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

GDeconstruction Plan

1.9Existing Conditions

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 64 PAGES

02 41 00 1.6 GNotification

SD-11 Closeout Submittals

3.2.4Receipts

02 42 51 SD-01 Preconstruction Submittals

1.4.2 GDust-Control Measures

1.4.2 GPacking and Transportation

Measures

1.4.4 GSchedule of Carpet Reclamation

Activities

1.4.3 GCarpet Reclamation Agency

Records

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

GOnsite Hazardous Waste

Management

3.2Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.5 GRecordkeeping

3.5 GException Report

3.6Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 64 PAGES

02 81 00 1.4.2 GTraining

1.4.3Certification

3.2.3 GShipping Documents and

Packagings Certification

3.2.4Security Plan

3.2.5Certificates of Disposal

3.4Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

3.1.6 GLocal Exhaust Equipment

3.1.6 GPressure Differential Automatic

Recording Instrument

3.1.7 GVacuums

3.1.9 GGlovebags

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2.13.5 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 64 PAGES

02 82 00 1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

2.1 GEncapsulants

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.7 GVacuums

3.1.7 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits and Licenses

1.3.5 GNotifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 64 PAGES

02 82 00 1.3.7.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control

Records

1.5.8 GProtective Clothing

Decontamination Facility

Notification

1.7.1 GRental Equipment

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications

1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

1.6.2.1 GForm Removal Schedule

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.3Recycled Aggregate Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 64 PAGES

03 30 00 2.3.1Cementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

1.8.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

1.6.3.4Finishing Plan

2.4.2Nonshrink Grout

SD-04 Samples

1.6.5.1Slab Finish Sample

1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

1.6.1.1Formwork Calculations

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 64 PAGES

03 30 00 1.6.4.2Slag Cement

1.6.4.3Aggregates

3.10.2.1Tolerance Report

3.14.2.3 GCompressive Strength Tests

3.14.2.5Unit Weight of Structural

Concrete

3.14.2.6Chloride Ion Concentration

3.14.2.4Air Content

3.14.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.6.3.3Silica Fume Manufacturer's

Representative

1.6.3.5VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.6Safety Data Sheets

1.8.2Forest Stewardship Council

(FSC) Certification

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 64 PAGES

03 30 00 2.4.5Joint Sealants

2.4.1Curing Compound

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.4Galvanizing Repair Paint

2.2.16Mechanical Fasteners

2.1.4Touch-Up Paint

Sound Absorbing Materials

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-04 Samples

2.1.1Metal Roof Deck Units

Cellular Metal Floor Deck Units

2.2.4Flexible Closure Strips

2.2.15Acoustical Material

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 64 PAGES

05 30 00 1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

Stud Manufacture's Certification

Stud Manufacture's Test Reports

06 10 00 SD-03 Product Data

2.5.2Fiberboard Wall Sheathing

1.4.3Structural-use and OSB Panels

2.3.2.2Structural-use and OSB Panels

2.3Oriented Strand Board

SD-05 Design Data

1.8.2 GModifications of Structural

Members

SD-06 Test Reports

1.4.4Preservative-treated

SD-07 Certificates

1.9.1Certificates of Grade

SCertified Sustainably Harvested

Virgin Lumber

2.1.2 SCertified Sustainably Harvested

Natural-decay and Insect-resistant

Wood

2.2.2 SCertified Sustainably Harvested

Framing Lumber

SCertified Sustainably Harvested

Structural Glued Laminated Timber

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 64 PAGES

06 10 00 2.3.1.1 SCertified Sustainably Harvested

Plywood Subflooring

2.3.1.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Subfloor Sheathing

SCertified Sustainably Harvested

Plywood Combination Subfloor

Underlayment

2.3.2.1 SCertified Sustainably Harvested

Plywood Wall Sheathing

2.3.2.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Wall Sheathing

2.3.3.1 SCertified Sustainably Harvested

Plywood Roof Sheathing

2.3.4.1 SCertified Sustainably Harvested

Plywood Diaphragm

2.3.4.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Diaphragm

2.3.5.1 SCertified Sustainably Harvested

Plywood Shear Wall

2.3.5.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Shear Wall

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 64 PAGES

06 10 00 SCertified Sustainably Harvested

Plywood for Other Uses

SCertified Sustainably Harvested

Structural-use and OSB Panels for

Other Uses

2.4.3 SCertified Sustainably Harvested

Plywood Underlayment

1.7Preservative Treatment

2.4.2 SIndoor Air Quality for

Particleboard Underlayment

2.4.5 SIndoor Air Quality for Fiberboard

Underlayment

2.4.6 SIndoor Air Quality for Strawboard

Panels

2.5.2 SIndoor Air Quality for Fiberboard

Wall Sheathing

2.5.10 SIndoor Air Quality for Aerosol

Adhesives

2.5.10 SIndoor Air Quality for Non-aerosol

Adhesives

SD-10 Operation and Maintenance

Data

3.6Take-back Program

06 61 16 SD-02 Shop Drawings

GDetail Fabrication Drawings

3.1 GInstallation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 64 PAGES

06 61 16 SD-03 Product Data

2.1.1 GSolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.4 GCounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

SIndoor Air Quality for solid surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 GSolid Polymer

07 21 16 SD-03 Product Data

Blanket Insulation; AE, G

2.1.1 SRecycled Content for Insulation

Materials

Accessories

SD-07 Certificates

2.1.3 SIndoor Air Quality for Insulation

Materials

SD-08 Manufacturer’s Instructions

3.3.1Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 64 PAGES

07 21 23 SD-03 Product Data

Loose Fill Insulation; AE, G

2.1.2 SRecycled Content for Insulation

Materials

Sill Sealer Insulation

Vapor Retarder

Pressure Sensitive Tape

SD-07 Certificates

2.1.4 SIndoor Air Quality for Insulation

Materials

SD-08 Manufacturer’s Instructions

2.1Loose Fill Insulation

07 22 00 SD-02 Shop Drawings

1.3Insulation Board Layout

AE, G

1.3Verification of Existing Conditions

SD-03 Product Data

2.1Insulation

AE, G

2.5 GFasteners

2.3 GSheathing Paper

2.4 GMoisture Control

1.10.1 GAsphalt

2.1.3 SRecycled Content For Insulation

SD-06 Test Reports

1.8.1Flame Spread Rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 64 PAGES

07 22 00 AE, G

SD-07 Certificates

1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials

2.1.4 SIndoor Air Quality For Insulation

SD-08 Manufacturer’s Instructions

2.5 GFasteners

2.1 GInsulation

07 31 13 SD-03 Product Data

Shingles; AE, G

2.1.1 SEnergy Star Label for Asphalt

Shingle

SHeat Island Reduction

SD-04 Samples

2.1.1Shingles

AE, G

2.1.1Color Charts

SD-08 Manufacturer’s Instructions

3.3Application

SD-11 Closeout Submittals

Manufacturer's Warranty; G

Contractor's Warranty; G

07 53 23 SD-02 Shop Drawings

Roof Plan Drawing; AE, G

Wind Load Calculations; AE, G

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 64 PAGES

07 53 23 1.3.1Boundaries of Enhanced

Perimeter

1.3.1Corner Attachments of Roof

System Components

1.3.1Location of Perimeter Half-Sheets

1.3.1Spacing of Perimeter, Corner, and Infield Fasteners

1.3.1Slopes and Drain Locations

SD-03 Product Data

2.1.1EPDM Sheet

AE, G

Seam Tape; AE, G

Bonding Adhesive; AE, G

Lap Splice Adhesive; AE, G

Water Cutoff Mastic/Water Block;

AE, G

Lap Cleaner, Lap Sealant, and

Edge Treatment; AE, G

Flashings; AE, G

Flashing Accessories; AE, G

2.1.8.1Flashing Tape

Fasteners and Plates; AE, G

Roof Insulation; AE, G

Protection Mat; AE, G

Pre-Manufactured Accessories;

AE, G

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 64 PAGES

07 53 23 1.8 GWarranty

SD-05 Design Data

1.4.4Wind Uplift Calculations

AE, G

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.4Wind Uplift Resistance

AE, G

1.4.3Fire Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.3Seam Tape

3.2.4Tape Seams / Lap Splices

3.2.5Adhesive Seams / Lap Splices

3.2.6Perimeter Attachment

3.2.4Primer

3.2.7Fasteners

Pre-Manufactured Accessories

1.6 GCold Weather

SD-11 Closeout Submittals

1.8Warranty

3.10Information Card

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 64 PAGES

07 53 23 3.9Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1Exposed Sheet Metal

AE, G

3.1.13Gutters

3.1.14Downspouts

2.2.1Gravel Stops and fascia

3.1.15Flashing for Roof Drains

3.1.10Base Flashing

Counterflashing

3.1.21Flashing at Roof Penetrations and Equipment Supports

3.1.16Scuppers

3.1.23 GCopings

3.1.12Drip Edges

3.1.18Eave Flashing

2.1 SRecycled Content

SD-04 Samples

1.4.2Finish Samples

AE, G

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 64 PAGES

07 60 00 1.4.3 GCleaning and Maintenance

07 92 00 SD-03 Product Data

2.1Sealants

AE, G

2.2Primers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

SIndoor Air Quality For Interior

Acoustical Sealants

SIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

AE, G

2.2 GFrames

2.2 GFrames

Accessories

SD-03 Product Data

2.1 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 64 PAGES

08 11 13 2.1 SRecycled Content for Steel Door

Product

2.2 GFrames

2.2 SRecycled Content for Steel Frame

Product

Accessories

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GList of Product Installations

SD-02 Shop Drawings

3.3Installation Drawings

AE, G

2.2Fabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.2 GFinish

2.1.1.2 SRecycled Content of Aluminum

Material

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-06 Test Reports

1.2.1 GCertified Test Reports

3.4.3Deflection

3.4.1Air Infiltration

3.4.4Condensation Resistance and

Thermal Transmittance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 64 PAGES

08 41 13 3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SD-11 Closeout Submittals

3.6Manufacturer's Product Warranty

08 51 13 SD-02 Shop Drawings

2.1Windows

AE, G

1.7Fabrication Drawings

SD-03 Product Data

2.1Windows

AE, G

2.1 SRecycled Content of Aluminum

Windows

2.2.6.1 GHardware

2.2.2 GFasteners

1.8Window Performance

2.4Thermal-Barrier Windows

GMullions

GWindow Cleaners' Bolts

2.2.8 GScreens

2.1.5 GWeatherstripping

2.2.6 GAccessories

2.2.3Adhesives

1.8.5Thermal Performance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 64 PAGES

08 51 13 1.8.5 SEnergy Star Label For Residential

Aluminum Window Products

SD-04 Samples

1.3.3.1Finish Sample

1.3.3.2Window Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.4 GDesign Analysis

SD-06 Test Reports

1.3.5Minimum Condensation

Resistance Factor

Windborne-Debris-Impact

Performance

SD-07 Certificates

Engineer's Qualifications

SD-10 Operation and Maintenance

Data

2.1 GWindows

1.5Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3Manufacturer's Detail Drawings

AE, G

1.3 GVerification of Existing Conditions

1.5Hardware Schedule

2.3.5 GKeying System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 64 PAGES

08 71 00 SD-03 Product Data

2.3Hardware Items

AE, G

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

Insulating Glass; AE, G

Blast Resistant Interlayer; AE, G

1.3Glazing Accessories

2.4.1.1Sealants

SD-04 Samples

2.3Insulating Glass

Glazing Compound

2.4.3Tape

2.4.3Sealing Tapes

SD-07 Certificates

Insulating Glass; AE, G

Blast Resistant Interlayer; AE, G

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 64 PAGES

08 81 00 SD-11 Closeout Submittals

Insulated Glass Units; AE, G

09 22 00 SD-02 Shop Drawings

2.1Metal Support Systems

AE, G

SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.5Cementitious Backer Units

2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.2Water-Resistant Gypsum Backing

Board

2.1.8Accessories

2.1.1Gypsum Board

SRecycled Content for Gypsum

Board

SRecycled Content for Paper

Facing and Gypsum Cores

2.1.6 SVOC Content of Joint Compound

SD-06 Test Reports

GASTM E90 Factory Test Report

GASTM E336 Field Test Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 64 PAGES

09 29 00 2.1 GAsbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

SIndoor Air Quality for Non-aerosol

Adhesives

SIndoor Air Quality for Aerosol

Adhesives

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

GGauged Porcelain Tile

2.1.2 GQuarry Tile

2.1.3 GMosaic Tile

2.1.3 SRecycled Content for Mosaic Tile

2.1.4 GGlazed Ceramic Wall Tile

2.1.4 SRecycled Content for Glazed

Ceramic Wall Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 64 PAGES

09 30 10 2.1 GTransition Strips

2.6.1 GMetal Strips

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

GCementitious Backer Units

GGlass-Mat Gypsum

Water-Resistant Backing Board

2.7 GWaterproof Membrane

2.8 GCrack Isolation Membrane

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.6.1 GMetal Strips

GGrout

SD-07 Certificates

2.4 SIndoor Air Quality for Adhesives

SIndoor Air Quality for Sealants

1.3.2Water Absorption Rates

SD-08 Manufacturer’s Instructions

3.8Manufacturer's Approved

Cleaning Instructions

SD-10 Operation and Maintenance

Data

GGauged Porcelain Tile

2.1.1 GPorcelain Tile

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 64 PAGES

09 30 10 2.1.2 GQuarry Tile

2.1.3 GMosaic Tile

2.1.4 GGlazed Ceramic Wall Tile

2.1 GTransition Strips

2.6.1 GMetal Strips

09 51 00 SD-02 Shop Drawings

2.1Approved Detail Drawings

AE, G

SD-03 Product Data

Acoustical Ceiling Systems

AE, G

2.2.1.1 SRecycled Content for Type XII

Ceiling Tiles

2.3 SRecycled Content for Suspension

Systems

2.1.1 GAcoustical Performance

SD-04 Samples

2.2 GAcoustical Units

Acoustical Ceiling Tiles

AE, G

SD-07 Certificates

SIndoor Air Quality for Type IX

Ceiling Tiles

2.2.1.1 SIndoor Air Quality for Type XII

Ceiling Tiles

SIndoor Air Quality for Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 64 PAGES

09 65 00 SD-02 Shop Drawings

2.8 GResilient Flooring and

Accessories

SD-03 Product Data

2.8 GResilient Flooring and

Accessories

2.4Adhesives

2.1Vinyl Composition Tile

SD-04 Samples

2.8 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

SIndoor Air Quality for Vinyl

Composition Tile

SIndoor Air Quality for Wall Base

2.4 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.8 GResilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 64 PAGES

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.1 GCarpet

SRecycled Content for Carpeting

2.4 GMoldings

2.3 SIndoor Air Quality for Aerosol

Adhesives

2.3 SIndoor Air Quality for Non-Aerosol

Adhesives

2.3 SIndoor Air Quality for Concrete

Primer

SD-04 Samples

2.1 GCarpet

2.4 GMoldings

GCarpet Cushion

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

2.1.1 SIndoor Air Quality for Carpet

SIndoor Air Quality for Fiber

Cushion

SIndoor Air Quality for Rubber

Cushion

SIndoor Air Quality for

Polyurethane-Foam Cushion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 64 PAGES

09 68 00 SD-08 Manufacturer’s Instructions

3.1Surface Preparation

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

Maintenance Service

SD-11 Closeout Submittals

1.6Warranty

09 90 00 SD-02 Shop Drawings

Piping Identification

SD-03 Product Data

2.1 GCoating

Sealant

SD-04 Samples

1.10 GColor

SD-07 Certificates

1.4Applicator's Qualifications

1.5.1.2 GQualification Testing

2.1Indoor Air Quality for Paints and

Primers

2.1Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

3.5.2Mixing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 64 PAGES

09 90 00 1.8.2Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 GCoatings

10 14 00.20 SD-02 Shop Drawings

1.3.2Detail Drawings

AE, G

SD-03 Product Data

2.1Room Identification And

Directional Signage System

AE, G

SD-04 Samples

1.3.1 GInterior Signage

GSoftware

2.1 GRoom Identification And

Directional Signage System

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings

3.2 GInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 64 PAGES

10 21 13 2.1Cleaning and Maintenance

Instructions

2.8Colors And Finishes

Painted Metal

2.2.2Anchoring Devices and Fasteners

2.2.4Hardware and Fittings

2.2.3Brackets

2.2.5Door Hardware

2.6Pilaster Shoes

2.2.4.2Finishes

2.8.2Finishes

AE, G

SRecycled content for plastic laminate partitions and screens

SD-04 Samples

2.8 GColors and Finishes

2.2.4Hardware and Fittings

2.2.2Anchoring Devices and Fasteners

SD-07 Certificates

1.6Warranty

2.3 SIndoor air quality for plastic

laminate clad partitions and screens

SIndoor air quality for solid phenolic, black core partitions and screens

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 64 PAGES

10 28 13 SD-02 Shop Drawings

2.1 GProduct Schedule

SD-03 Product Data

2.1 SRecycled content for stainless

steel toilet accessories

2.1.3Item A5080

AE, G

2.1.4Item A5090

2.1.5Item A5109

2.1.6Item A5200

SD-10 Operation and Maintenance

Data

2.1.3 GItem A5080

2.1.4 GItem A5090

2.1.5 GItem A5109

2.1.6 GItem A5200

11 05 40 SD-01 Preconstruction Submittals

1.3 GContractor's Field Verification

Data

1.5.6 GManufacturer's Qualifications

SD-02 Shop Drawings

1.5.6 GDetail Drawings

GFood Service Equipment

Schedule

1.5.6 GUtilities

1.5.6 GCustom Fabricated Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 64 PAGES

11 05 40 1.5.6 GInstallation Instructions and

Diagrams

SD-03 Product Data

1.3.1Food Service Equipment

1.5.6Food Preparation Equipment

SD-04 Samples

1.5.6 GExterior Panel Finish Material

1.5.6 GInterior Panel Finish Material

1.5.6 GSample Warranty

SD-05 Design Data

1.5.6 GManufacturer's Descriptive And

Technical Literature

SD-06 Test Reports

1.5.6 GManufacturer's Test Data

3.6.2 GField Test Reports

SD-07 Certificates

1.5.2National Sanitation Foundation

Standards

1.5.5Underwriters Laboratories

Standards

1.5.1Energy Star Labeled

1.5.1PL 109-58 Compliant

SD-08 Manufacturer’s Instructions

1.5.6 GManufacturer's Instructions

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 64 PAGES

11 05 40 3.4 GOperation and Maintenance

Manuals

3.5 GList of Authorized Local Service

and Repair Entities

SD-11 Closeout Submittals

3.7 GManufacturer's Warranty

3.8 GContractor's Warranty for

Installation

11 06 40.13 SD-02 Shop Drawings

2.1.2 GSchedule

11 41 11 SD-01 Preconstruction Submittals

1.3 GContractor's Field Verification

Data

SD-02 Shop Drawings

1.5 GManufacturer's Detail Drawings

1.5 GCustom Fabricated Equipment

1.5 GInstallation Instructions and

Diagrams

SD-03 Product Data

GWalk-in Refrigerators

GFreezers

SD-05 Design Data

1.6.1 GManufacturer's Descriptive and

Technical Literature

SD-06 Test Reports

1.6.2 GManufacturer's Test Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 64 PAGES

11 41 11 3.2.2 GField Test Reports

SD-07 Certificates

1.6.2NSF Certification

1.6.2UL Certification

SD-08 Manufacturer’s Instructions

1.6.1Manufacturer's Instructions

SD-11 Closeout Submittals

3.3Manufacturer's Warranty

3.4Contractor's Warranty for

Installation

11 48 00 SD-01 Preconstruction Submittals

1.3 GContractor's Field Verification

Data

SD-02 Shop Drawings

1.5.1 GInstallation Instructions and

Diagrams

SD-06 Test Reports

GManufacturer's Test Data

3.2.2 GField Test Reports

SD-08 Manufacturer’s Instructions

GManufacturer's Instructions

SD-10 Operation and Maintenance

Data

GFood Service Cleaning and

Disposal Equipment

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 64 PAGES

11 48 00 3.3Manufacturer's Warranty

3.4Contractor's Warranty for

Installation

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection Engineer

(QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

GPipe

2.2.1.2 GFittings

2.2.4 GValves

GAlarm Valves

2.7.5 GRelief Valves

2.6 GSprinklers

2.2.3 GPipe Hangers and Supports

2.3.1 GSprinkler Alarm Switch

2.3.2 GValve Supervisory (Tamper)

Switch

2.5 GFire Department Connection

2.4 GBackflow Prevention Assembly

2.7.6 GAir Vent

2.4.1 GHose Valve

2.1.2 GNameplates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 64 PAGES

21 13 13 SD-05 Design Data

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.6.1 GTest Procedures

SD-07 Certificates

3.6.2.1 GVerification of Compliant

Installation

3.6.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.8 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.8As-built drawings

21 13 16 SD-01 Preconstruction Submittals

1.2.4 GQualified Fire Protection Engineer

(QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

1.4.2.3 GNitrogen Generation System

Commissioning Technician

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 64 PAGES

21 13 16 GPipe

2.2.1.2 GFittings

2.2.3 GValves

2.9.4 GRelief Valves

2.8 GSprinklers

2.2.2 GPipe Hangers and Supports

2.5.1 GSprinkler Alarm Switch

2.5.3 GValve Supervisory (Tamper)

Switch

2.7 GFire Department Connection

2.6 GBackflow Prevention Assembly

2.6.1 GHose Valve

2.5.2 GHigh/Low-Nitrogen Pressure

Supervisory Switch

1.4.2.3 GNitrogen Generation System

2.1.2 GNameplates

2.3 GDry Pipe Valve

SD-05 Design Data

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.6.1 GTest Procedures

SD-07 Certificates

3.6.2.1 GVerification of Compliant

Installation

3.6.2.2 GRequest for Government Final

Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 64 PAGES

21 13 16 SD-10 Operation and Maintenance

Data

3.8 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.8As-built drawings

22 00 00 SD-02 Shop Drawings

3.7.1 GPlumbing System

SD-03 Product Data

2.4.1 SWaterSense Label for Flush

Valve Water Closet

2.4.2 SWaterSense Label for Urinal

Countertop Lavatories

SWaterSense Label for Lavatory

Faucet

SEnergy Star Label for Electric

Water Cooler

SEnergy Star Label for Wheelchair

Electric Water Cooler

Plastic Bathtubs

GWater Heaters

2.8.1.1 SEnergy Star Label for Gas

Storage Water Heater

2.9 GPumps

3.7.1.1 GBackflow Prevention Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P…