FA5685-18-R-0003_-_Attach_6_-_INC-1106.xls
XLS spreadsheet 61 KB Posted
- Attached to
- Incirlik Air Base Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- FA568518R0003
About this file
This document contains a schedule of material submittals for a project to upgrade a swimming pool at Incirlik Air Base in Turkey. The schedule includes 18 line items each for electrical, civil, structural, architectural, and mechanical work. It specifies the type of submittals required for each item such as shop drawings, samples, manufacturer recommendations and warranty information. For each submittal, the schedule outlines the required number of copies, submission date, and dates by which the submittal must be received by the contracting office and returned by the civil engineering office. It also includes fields to track the submittal number, dates the contractor is notified and resubmits, and whether the submittal is approved or disapproved.
The related federal contract opportunity is a pre-solicitation for a multiple award construction contract at Incirlik Air Base in Turkey to be awarded by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa. No further details are provided on required construction services, response dates, or other contractual terms.
FA5685-18-R-0003 - Attachment 6 - INC-1106
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 17-1119 | RPR UPGRADE SWIMMING POOL | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| FDA : Final Design Approval | NTP: Notice to Proceed | FA: Final Acceptance / GP: Gate Pass | ||||||||||||||||||||
| GPA : Gate Pass Approval | NLT: No Later Than |
&CFA5685-18-R-003 - Attch 6 - INC-1106 &L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 17-1119 | RPR UPGRADE SWIMMING POOL | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL |
&CFA5685-18-R-003 - Attch 6 - INC-1106 &L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 17-1119 | RPR UPGRADE SWIMMING POOL | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| C1 | ||||||||||||||||||||||
| C2 | ||||||||||||||||||||||
| C3 | ||||||||||||||||||||||
| C4 | ||||||||||||||||||||||
| C5 | ||||||||||||||||||||||
| C6 | ||||||||||||||||||||||
| C7 | ||||||||||||||||||||||
| C8 | ||||||||||||||||||||||
| C9 | ||||||||||||||||||||||
| C10 | ||||||||||||||||||||||
| C11 | ||||||||||||||||||||||
| C12 | ||||||||||||||||||||||
| C13 | ||||||||||||||||||||||
| C14 | ||||||||||||||||||||||
| C15 | ||||||||||||||||||||||
| C16 | ||||||||||||||||||||||
| C17 | ||||||||||||||||||||||
| C18 |
&CFA5685-18-R-003 - Attch 6 - INC-1106 &L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL
STRUCTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 17-1119 | RPR UPGRADE SWIMMING POOL | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| STRUCTURAL | ||||||||||||||||||||||
| S1 | ||||||||||||||||||||||
| S2 | ||||||||||||||||||||||
| S3 | ||||||||||||||||||||||
| S4 | ||||||||||||||||||||||
| S5 | ||||||||||||||||||||||
| S6 | ||||||||||||||||||||||
| S7 | ||||||||||||||||||||||
| S8 | ||||||||||||||||||||||
| S9 | ||||||||||||||||||||||
| S10 | ||||||||||||||||||||||
| S11 | ||||||||||||||||||||||
| S12 | ||||||||||||||||||||||
| S13 | ||||||||||||||||||||||
| S14 | ||||||||||||||||||||||
| S15 | ||||||||||||||||||||||
| S16 | ||||||||||||||||||||||
| S17 | ||||||||||||||||||||||
| S18 |
&CFA5685-18-R-003 - Attch 6 - INC-1106 &L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL
ARCHITECTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 17-1119 | RPR UPGRADE SWIMMING POOL | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ARCHITECTURAL | ||||||||||||||||||||||
| A1 | ||||||||||||||||||||||
| A2 | ||||||||||||||||||||||
| A3 | ||||||||||||||||||||||
| A4 | ||||||||||||||||||||||
| A5 | ||||||||||||||||||||||
| A6 | ||||||||||||||||||||||
| A7 | ||||||||||||||||||||||
| A8 | ||||||||||||||||||||||
| A9 | ||||||||||||||||||||||
| A10 | ||||||||||||||||||||||
| A11 | ||||||||||||||||||||||
| A12 | ||||||||||||||||||||||
| A13 | ||||||||||||||||||||||
| A14 | ||||||||||||||||||||||
| A15 | ||||||||||||||||||||||
| A16 | ||||||||||||||||||||||
| A17 | ||||||||||||||||||||||
| A18 |
&CFA5685-18-R-003 - Attch 6 - INC-1106 &L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL
MECHANICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 17-1119 | RPR UPGRADE SWIMMING POOL | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| MECHANICAL | ||||||||||||||||||||||
| M1 | ||||||||||||||||||||||
| M2 | ||||||||||||||||||||||
| M3 | ||||||||||||||||||||||
| M4 | ||||||||||||||||||||||
| M5 | ||||||||||||||||||||||
| M6 | ||||||||||||||||||||||
| M7 | ||||||||||||||||||||||
| M8 | ||||||||||||||||||||||
| M9 | ||||||||||||||||||||||
| M10 | ||||||||||||||||||||||
| M11 | ||||||||||||||||||||||
| M12 | ||||||||||||||||||||||
| M13 | ||||||||||||||||||||||
| M14 | ||||||||||||||||||||||
| M15 | ||||||||||||||||||||||
| M16 | ||||||||||||||||||||||
| M17 | ||||||||||||||||||||||
| M18 |
&CFA5685-18-R-003 - Attch 6 - INC-1106 &L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL