Untabulated_COST_EST_10-1095.xls
XLS spreadsheet 67 KB Posted
- Attached to
- Roads and Grounds IDIQ Base Contract
- Solicitation number
- FA5685-14-R-0012
About this file
INC Form 1101 Untabulated COST ESTIMATE FOR 13-1095
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ Price
| 100% | FOR OFFICIAL USE ONLY | This is NOT a comprehensive cost estimation macro. The User | |||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SH: 1 OF 3 | is required to do many of the revisions manually. The User | |||||||||||
| CONTRACTOR | ADDRESS: | INCIRLIK HAVA ALANI-ADANA/TURKEY | must be capable of using a spreadsheet with minimum help. | ||||||||||
| WORK LOCATION: | INCIRLIK HAVA ALANI-ADANA | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | The cost form is prepared for Quattro Pro version 4.0. The printer | |||||||||||
| REPAIR VARIOUS BASE ROADS | $ | 0.00 | selected is Canon Laser Printer LPB-4. Hovewer, as the program's | ||||||||||
| PURCHASE REQUEST NUMBER: | PROJECT NUMBER | soft fonts are used, changing a printer should not present problems. | |||||||||||
| LJYC 13-1095 | |||||||||||||
| UNIT OF | TOTAL COST | It is possible that, at the first trials, problems with page fitting may | |||||||||||
| LINE | MEASURE | QUANTITY | $ | $ | arise. The User should experiment with the size of the first | ||||||||
| NO | UNIT | TOTAL | font on the font table. | ||||||||||
| ITEMS | |||||||||||||
| (2) | (3) | (4) | (5) | The User is recommended to work in protected mode initially to avoid | |||||||||
| erasing any formulas. | |||||||||||||
| R E C A P I T U L A T I O N | |||||||||||||
| RECAP sheet formulas and the discipline totals at the end of each | |||||||||||||
| discipline need to be manually revised with every new estimate. | |||||||||||||
| There are three utility macros that can be started by pressing | |||||||||||||
| simultaneously, the <Alt> key and one letter (See below). | |||||||||||||
| 1 | CIVIL WORKS TOTAL | $0.00 | <Alt>C ....... Erases the contents of one page of cost estimate | ||||||||||
| <Alt>Z ....... Inserts a new cost estimate page | |||||||||||||
| <Alt>X ....... Adds a new cost estimate page at the very end | |||||||||||||
| Macros <Alt>C and <Alt>Z must be started with the cursor parked | |||||||||||||
| in column A, and right below the cell containing page break, just | |||||||||||||
| before the page the contents of which are to be erased, or | |||||||||||||
| before the location of the new page to be inserted. | |||||||||||||
| To insert new items in a page use and empty page as a holding tank | |||||||||||||
| and rearrange items by copying ("copy special, contents", to avoid | |||||||||||||
| disturbing the cell formats) to and from it. Do not use "move" | |||||||||||||
| untill you feel comfortable with the spreadsheet. | |||||||||||||
| TOTAL | $0.00 | ||||||||||||
| 0.00 | |||||||||||||
| 12 | Demolish asphalt road, asphalt only | CM | $0.00 | ||||||||||
| 17 | Excavation by hand | CM | $0.00 | ||||||||||
| The form is designed using for A4 size, for 8.5"x11" minor | |||||||||||||
| 18 | Unclassified excavation (Bulk), including concrete, hauling, loading and disposal w/machine | CM | $0.00 | adjusments may be required. To print on A4, set page break | |||||||||
| options in the printer page layout to "NO". | |||||||||||||
| 21 | Compaction by hand with plate or rammer compactor | SM | $0.00 | ||||||||||
| 28 | Provide & Install Graded Crush Aggregate Base Course, including loading, hauling, spread | CM | $0.00 | ||||||||||
| 42 | Provide & Install Type II Asphalt Binder Course | CM | $0.00 | ||||||||||
| The discipline totals must be centered, written in uppercase, | |||||||||||||
| 43 | Provide & Install Primer Coat (MC30) | TON | $0.00 | ||||||||||
| The discipline totals must be centered, written in uppercase, | |||||||||||||
| 74 | Saw cut construction joints | LM | $0.00 | ||||||||||
| 221 | Conduct Compaction Test | EA | $0.00 | ||||||||||
| 119 | Provide and Apply one reactive comp.paint (KANAT PAINT , KANTEX 64710 or equal) c/w type 1glass beads, by machine | SM | $0.00 | ||||||||||
| 225 | Provide & Install Temporary Construction Fencing | LM | $0.00 | ||||||||||
| TOTAL | $0.00 | ||||||||||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | |||||||||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | |||||||||||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | |||||||||||||
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||||||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||||||||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||||||||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | |||||||||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |||||||||||||
| and of significant dollar value. | |||||||||||||
| Col 10 Line Total. Self-explanatory. | |||||||||||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||||||||||
| page as follows. | |||||||||||||
| TOTAL MATERIAL COSTS | $ | N/A | |||||||||||
| ------- | |||||||||||||
| TOTAL LABOR COSTS | $ | N/A | |||||||||||
| ------- | |||||||||||||
| TOTAL OTHER DIRECT COSTS | $ | N/A | |||||||||||
| ------- | |||||||||||||
| TOTAL DIRECT COSTS | $ | 0.00 | |||||||||||
| Included | ------- | ||||||||||||
| OVERHEAD | In Unit Price | $ | N/A | ||||||||||
| ------- | |||||||||||||
| SUBTOTAL | $ | 0.00 | |||||||||||
| Included | ------- | ||||||||||||
| PROFIT | In Unit Price | $ | N/A | ||||||||||
| ------- | |||||||||||||
| TOTAL PRICE | $ | 0.00 | |||||||||||
| -------- | |||||||||||||
| DATE : | FIRM NAME : | ||||||||||||
| ------------------------------------- | --------------------------------------------------- | ||||||||||||
| TITLE : | BY : | ||||||||||||
| ----------------------------------- | ------------------------------------------------------------------- | ||||||||||||
| REPAIR VARIOUS BASE ROADS | |||||||||||||
| INSTRUCTIONS TO OFFERORS | |||||||||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||||||||||
| estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from | |||||||||||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | |||||||||||||
| (see ASPR 3-807.3(e) and 3-807.4) | |||||||||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||||||||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||||||||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||||||||||
| a. The existing, verifiable data. | |||||||||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||||||||||
| c. The contingencies used by the offeror in his proposed price. | |||||||||||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||||||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||||||||||
| and made available to the contracting officer or his authorized representative upon request. | |||||||||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||||||||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||||||||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | |||||||||||||
| with any negotiations prior to contract award. | |||||||||||||
| (Reverse of Computer Generated AF Form 3052., AUG 93) |
back
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | SH: 3 OF 3 | |||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | ||||||
| permit itemizing of all direct costs. | ||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | ||||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | ||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | ||||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | ||||||
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. | ||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | ||||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | ||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | ||||||
| and of significant dollar value. | ||||||
| Col 10 Line Total. Self-explanatory. | ||||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||||
| page as follows. | ||||||
| TOTAL MATERIAL COSTS | $ | N/A | ||||
| ------- | ||||||
| TOTAL LABOR COSTS | $ | N/A | ||||
| ------- | ||||||
| TOTAL OTHER DIRECT COSTS | $ | N/A | ||||
| ------- | ||||||
| TOTAL DIRECT COSTS | $ | $0.00 | ||||
| Included | ------- | |||||
| OVERHEAD | In Unit Price | $ | N/A | |||
| ------- | ||||||
| SUBTOTAL | $ | $0.00 | ||||
| Included | ------- | |||||
| PROFIT | In Unit Price | $ | N/A | |||
| ------- | ||||||
| TOTAL PRICE | $ | 0.00 | ||||
| -------- | ||||||
| DATE : | FIRM NAME : | |||||
| ------------------------------------- | ||||||
| TITLE : | BY : | |||||
| ----------------------------------- | ||||||
| REPAIR VARIOUS BASE ROADS | ||||||
| INSTRUCTIONS TO OFFERORS | ||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | ||||||
| estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from | ||||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | ||||||
| (see ASPR 3-807.3(e) and 3-807.4) | ||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | ||||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | ||||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||||||
| a. The existing, verifiable data. | ||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | ||||||
| c. The contingencies used by the offeror in his proposed price. | ||||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | ||||||
| and made available to the contracting officer or his authorized representative upon request. | ||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | ||||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | ||||||
| with any negotiations prior to contract award. | ||||||
| (Reverse of Computer Generated AF Form 3052., AUG 93) |