FORM_INC_1106_(LJYC_10-1099).xls

XLS spreadsheet 55 KB Posted

Attached to
Roads and Grounds IDIQ Base Contract Federal contract opportunity
Solicitation number
FA5685-14-R-0012
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Form INC 1106(LJYC 10-1099)

View the file

Other files for this federal contract opportunity

Other files attached to Roads and Grounds IDIQ Base Contract, newest first.
File Type Posted
Q_ _A_2__for_Amd_9.docx DOCX document
Q_ _A_for_Amd_9.docx DOCX document
FA5685-14-R-0012-0008.doc DOC document
R-G_Bid_Sched_qty_1.xls XLS spreadsheet
FA5685-14-R-0012-0006.doc DOC document
FA5685-14-R-0012-0005.doc DOC document
FA5685-14-R-0012-0004.doc DOC document
Updated_IDIQ_Specification_22_Jul_14.pdf PDF
FA5685-14-R-0012-0003.doc DOC document
FENCE_-3.pdf PDF
Consolidated_questions_for_Roads_and_Grounds_1.docx DOCX document
HANDHOLE_DETAIL.PDF PDF
FENCE_-1.pdf PDF
warning_sign_plan.pdf PDF
FA5685-14-R-0012-0002.doc DOC document
Updated_IDIQ_Specification.pdf PDF
FA5685-14-R-0012-0001.doc DOC document
C1.pdf PDF
C4.pdf PDF
C2.pdf PDF
TITLE.pdf PDF
C3.pdf PDF
TITLE.pdf PDF
C2.pdf PDF
SOW_LJYC_13-1096.doc DOC document
C1.pdf PDF
13-1095_SOW_.doc DOC document
Past_Performance_Questionnaire.docx DOCX document
IDIQ_Specification.pdf PDF
LJYC_13-1095__FORM_INC-1106.xls XLS spreadsheet
C3.pdf PDF
C4.pdf PDF
C2.pdf PDF
LJYC_10-1099_SOW.doc DOC document
PPL_Feb_2012.xls XLS spreadsheet
Geospatial_Data_Requirements_Incirlik_AB.pdf PDF
FA5685-14-R-0012.doc DOC document
ufc_3_270_01.pdf PDF
Site_Visit_Reservation_Form.docx DOCX document
Untabulated_COST_EST_10-1095.xls XLS spreadsheet
Untabulated_COST_ESTIMATE_FOR_10-1099.xls XLS spreadsheet
C4.pdf PDF
PPL_Feb_2012.xls XLS spreadsheet
ufc_3_270_01.pdf PDF
Untabulated_RoadsGrounds_IDIQ__Bid_Schedule_with_quantity-.xls XLS spreadsheet
Untabulated_COST_EST_10-1096.xls XLS spreadsheet
PAVEMENT_ _GROUNDS_STANDARDS.pdf PDF
C3.pdf PDF
Site_Visit_Reservation_Form.docx DOCX document
Site_Visit_Reservation_Form.docx DOCX document
Show all 50

Roads and Grounds IDIQ Base Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 10-1099RPR STORM DRAINAGE BLDG 500
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATAPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
GENERAL
1SUBMITTAL SCHEDULE, SPEC. 01 33 003 CPNTP+ 10 DAYS
2PROGRESS SCHEDULE, SPEC. 01 32 01.00 103 CPSee

Note 1 3 Cont. Quality Cont. Plan Spec. Sec. 01 45 00.00 21 3 CP See Note 1 4 NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION, SPEC. 01 77 00.00 20 3 CP See Note 1 5 AS BUILT DATA (1 Original, 1 Red Line), SPEC. 01 78 02.00 10 1 CP + CD See Note 1 6 HAZARDOUS MATERIAL LIST IN AF FORM 3952 3 CP See Note 1 7 BANK LETTER OF WARRANTY 3 CP See Note 1 8 Certification and Calibration Documents 3 CP See Note 1 9 Construction Debris Tally sheet 3 CP See Note 1 Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule.

&CATTACHMENT 4

&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)

CIVIL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 10-1099RPR STORM DRAINAGE BLDG 500
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATAPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
CIVIL
1GRADED CRUSHED AGGREGATE BASE COURSE3 CPSee

Note 1 2 READY MIXED CONCRETE Specs. Sec. 03 31 00.00 10 3 3 3 CP See Note 1 3 COMPACTION TEST FOR BASE COURSE 3 CP See Note 1 4 CATCH BASIN COVER AND FRAME 3CP 3CP 3CP See Note 1 5 SUMP PUMP 3CP 3CP 3CP See Note 1 6 10 ATU 4 " HDPE PIPE C/W FITTINGS 3 CP 3 CP See Note 1 7 SHOP DRAWING FOR NEW CATCH BASIN C/W PUMP AND NEW PIPE TO EXISTING CATCH BASIN CONNECTION 3 CP See Note 1 8 WIRE MESH 3 CP See Note 1 9 CLEAN OUT 3 CP 3 CP See Note 1 10 COMPACTION TEST FOR COURSE MATERIALS 3 CP See Note 1 Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule.

&CATTACHMENT 4

&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)

ELECTRIC

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 10-1099RPR STORM DRAINAGE BLDG 500
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATAPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
ELECTRIC
1ALL TYPE WIRING3 CP3 CPSee

Note 1 2 ALL TYPE CONDIUTS 3 CP 3 CP See Note 1 3 MOTOR PROTECTION AND CIRCUIT BREAKERS 3 CP 3 CP See Note 1 4 SHOP DRAWING FOR WIRING INSTALLATION 3CP See Note 1 Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule.

&CATTACHMENT 4

&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)

File details come from the government source that posted it. Updated .