FORM_INC_1106_(LJYC_10-1099).xls
XLS spreadsheet 55 KB Posted
- Attached to
- Roads and Grounds IDIQ Base Contract Federal contract opportunity
- Solicitation number
- FA5685-14-R-0012
About this file
Form INC 1106(LJYC 10-1099)
View the file
Other files for this federal contract opportunity
Show all 50
Roads and Grounds IDIQ Base Contract has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 10-1099 | RPR STORM DRAINAGE BLDG 500 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SUBMITTAL SCHEDULE, SPEC. 01 33 00 | 3 CP | NTP+ 10 DAYS | |||||||||||||||||||
| 2 | PROGRESS SCHEDULE, SPEC. 01 32 01.00 10 | 3 CP | See |
Note 1 3 Cont. Quality Cont. Plan Spec. Sec. 01 45 00.00 21 3 CP See Note 1 4 NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION, SPEC. 01 77 00.00 20 3 CP See Note 1 5 AS BUILT DATA (1 Original, 1 Red Line), SPEC. 01 78 02.00 10 1 CP + CD See Note 1 6 HAZARDOUS MATERIAL LIST IN AF FORM 3952 3 CP See Note 1 7 BANK LETTER OF WARRANTY 3 CP See Note 1 8 Certification and Calibration Documents 3 CP See Note 1 9 Construction Debris Tally sheet 3 CP See Note 1 Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule.
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 10-1099 | RPR STORM DRAINAGE BLDG 500 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| 1 | GRADED CRUSHED AGGREGATE BASE COURSE | 3 CP | See |
Note 1 2 READY MIXED CONCRETE Specs. Sec. 03 31 00.00 10 3 3 3 CP See Note 1 3 COMPACTION TEST FOR BASE COURSE 3 CP See Note 1 4 CATCH BASIN COVER AND FRAME 3CP 3CP 3CP See Note 1 5 SUMP PUMP 3CP 3CP 3CP See Note 1 6 10 ATU 4 " HDPE PIPE C/W FITTINGS 3 CP 3 CP See Note 1 7 SHOP DRAWING FOR NEW CATCH BASIN C/W PUMP AND NEW PIPE TO EXISTING CATCH BASIN CONNECTION 3 CP See Note 1 8 WIRE MESH 3 CP See Note 1 9 CLEAN OUT 3 CP 3 CP See Note 1 10 COMPACTION TEST FOR COURSE MATERIALS 3 CP See Note 1 Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule.
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
ELECTRIC
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 10-1099 | RPR STORM DRAINAGE BLDG 500 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRIC | ||||||||||||||||||||||
| 1 | ALL TYPE WIRING | 3 CP | 3 CP | See |
Note 1 2 ALL TYPE CONDIUTS 3 CP 3 CP See Note 1 3 MOTOR PROTECTION AND CIRCUIT BREAKERS 3 CP 3 CP See Note 1 4 SHOP DRAWING FOR WIRING INSTALLATION 3CP See Note 1 Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule.
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
File details come from the government source that posted it. Updated .