LJYC_13-1096__FORM_INC-1106.xls
XLS spreadsheet 47 KB Posted
- Attached to
- Roads and Grounds IDIQ Base Contract Federal contract opportunity
- Solicitation number
- FA5685-14-R-0012
About this file
Schedule of Material Submittals - LJYC 13-1096 FORM INC 1106
View the file
Other files for this federal contract opportunity
Show all 50
Roads and Grounds IDIQ Base Contract has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | REPAIR VARIOUS | SOLICITATION/CONTRACT NO. | ||||||||||||||||||
| LJYC 13-1096 | BASE ROADS | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SUBMITTAL SCHEDULE, SPEC. 01 33 00 | 3 CP | NTP+ 10 DAYS | |||||||||||||||||||
| 2 | SAFETY PLAN, SPEC. 01 35 30 | 3 CP | See |
Note 1 3 QUALITY CONTROL PLAN, SPEC. 01 45 00.00 20 3 CP See Note 1 4 KEY PERSONNEL LIST 3 CP See Note 1 5 PROGRESS SCHEDULE, SPEC. 01 32 01.00 10 3 CP See Note 1 6 EQUIPMENT DELIVERY SCHEDULE 3 CP See Note 1 7 NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION, SPEC. 01 77 00.00 20 3 CP See Note 1 8 OPERATION AND MAINTENANCE MANUALS (Hardcopy: 1 original, 2 copies and 1 CD), SPEC. 01 78 23 3 CP+CD See Note 1 9 AS BUILT DATA (1 Original, 1 Red Line), SPEC. 01 78 02.00 10 1CP+CD See Note 1 10 HAZARDOUS MATERIAL LIST IN AF FORM 3952 3 CP See Note 1 11 BANK LETTER OF WARRANTY 3 CP See Note 1 15 Certification and Calibration Documents 3 CP See Note 1 16 Construction Debris Tally sheet 3 CP See Note 1 Note 1. Contractor must get submittal schedule approved by CO, before work begins. Contractor's proposed submittal dates for all items on INC-1106 must be on schedule.
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | REPAIR VARIOUS | SOLICITATION/CONTRACT NO. | ||||||||||||||||||
| LJYC 13-1096 | BASE ROADS | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| 1 | AGGREGATE BASE COURSE, SPEC. 32 11 24 | 0.5 kg | 3 | See |
Note 1 2 ASPHALT BINDER COURSE, SPEC. 32 12 17 3 3 3 See Note 1 3 ASPHALT WEARING COURSE, SPEC. 32 12 17 3 3 3 See Note 1 4 PRIMER, SPEC. 32 12 10 3 3 See Note 1 5 TACK COAT, SPEC. 32 12 10 3 3 See Note 1 6 TRAFFIC PAINT, SPEC. 32 17 24.00 10 3 3 3 3 3 See Note 1 7 GLASS BEADS, SPEC. 32 17 24.00 10 3 3 3 See Note 1
| 8 | COMPACTION TEST FOR SUBGRADE, | |||
| SPEC. 31 23 00.00 20 | 3 | See |
Note 1 9 COMPACTION TEST FOR BASE COURSE AND PLANT MIX, SPEC. 32 11 24 3 See Note 1 10 SHOP DRAWINGS FOR ASPHALT PATCH DETAIL 3 See Note 1 11 SHOP DRAWINGS SHOWING THE PATCH LOCATIONS AND ELEVATIONS 3 See Note 1 12 JOINT SEAL MATERIAL FOR PATCH EDGES 3 3 3 3 See Note 1 13 SHOP DRAWING FOR PHASING PLAN 3 See Note 1
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
File details come from the government source that posted it. Updated .