Atch_1_PWS-Technical_Exhibit_1-4__27_Feb_19.pdf
PDF 283 KB Posted
- Solicitation number
- FA5613-19-RA001
About this file
This document contains technical exhibits to a performance work statement for family housing maintenance services. The exhibits provide inventory and inspection requirements for fire protection systems, appliance quality standards, required certifications, and workload history and estimates. Exhibit 1 lists the inventory of fire extinguishers, alarm systems, sprinkler systems and inspection intervals for various housing areas. Exhibit 2 outlines appliance quality standards for replacing stock. Exhibit 3 lists required certifications for working on fire alarm, suppression systems and other areas. Exhibit 4 provides workload history from fiscal years 2015 to 2018 and estimates for routine maintenance, service calls and exterior grounds maintenance for housing units in Landstuhl, Ramstein and Vogelweh areas.
Atch 1 - PWS Technical Exhibit 1-4
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBITS 1 THROUGH 4
TO THE
PERFORMANCE WORK STATEMENT
FOR
FAMILY HOUSING MAINTENANCE
27-Feb-19
NOTE: Historical Data is provided as a reference and is not a forecast of future activities or requirements
INDEX
Technical Exhibits 1-4
Technical Exhibit No. Title
1 Fire Protection System Inventory and Inspection Intervals (Example)
1.1 Fire Alarm System Inspections (Example)
1.2 Fire Alarm Systems/Fire Extinguisher Vogelweh Housing (Example)
1.3 Fire Sprinkler Systems Vogelweh Housing (Example)
2 Appliance Quality Standard 3 Certification List 4 Workload History/Workload Estimates 4a COM Breakout 4b Service Call Breakout 4c RMP Breakout
TECHNICAL EXHIBIT 1
Fire Protection System Inventory and Inspection Intervals (Example)
Neighborhood Facility Units Fi re
E xt in gu is he rs
FE
E xp er ia tio n D at e
T-
D oo r C lo su re
M ak e/ M od el
In st al le d
Pu sh
S ta tio n s tr ob e lig ht s a la rm h or ns h ea t d et s m ok e de t.
lo ca l s m ok e al ar m s
M ak e
In st al le d
To ta l
Si am es e
C on ne ct io n
W at er S to ra ge T an k
H ea ds U pr ig ht R ed
H ea ds U pr ig ht G re en
H ea ds U pr ig ht Y el lo w
H ea ds D ow nw ar d
R ed ds D ow nw ar d
G ds D ow nw ar d
Ye llo w ds S id ew ay s
R ed ds S id ew ay s
G ds S id ew ay s
Ye llo w
M od el
Tr an sm itt er
In st al le d
C od e
EX: Vogelweh 1146 16 4 9-Mar-09 22 Siemens
Simasys G 2000 10 6 16 16 16 16 Tyco 2000 94 16 58 20
Fire Protection Systems Other Fire Alarm System Fire Suppression System Monaco System
TECHNICAL EXHIBIT 1.1
Fire Alarm System Inspections (Example)
Overview
Neighborhood Facility J F M A M J J A S O N D 1st quarter 2nd quarter 3rd quarter Annual Insp. Service Calls: Open SO Nbr.: Details J F M A M J J A S O N D 1st quarter 2nd quarter 3rd quarter Annual Insp. Service Calls: Open SO Nbr.: Details:
EXAMPLE 1146 1 1 1 done 3 903890 Strobe light Stw A Parts on order 1 1 1 done 1
Fire Extinguishers Fire Alarm system Inspections Fire Suspression system Inspections
Technical Exhibit 1.2 Fire Alarm Systems/Fire Extinguisher Vogelweh Housing (Example)
This Table is an addition to the Tables Provided in the NFPA 72, 25
Component: Initial/ Reacceptance Frequency Control Equipment X Quarterly Secondary (Standby) Power Supply X Quarterly Uninterrupted Power Supply X Quarterly Batteries X Quarterly Fire Alarm Control Unit Trouble Signals X Quarterly Transient Suppressors X Quarterly Remote Annunciators X Quarterly Waterflow Devices X Quarterly Interface Equipment X Quarterly Alarm Notification Appliances X Quarterly Exit Marking Notification Appliances X Quarterly Combination systems X Quarterly Fire Safety Functions X Quarterly Public Fire Alarm Reporting system Power Supply Transmission Equipment Initiating Devices:
Heat Detectors * Carbon Monoxide Detectors * Smoke Detectors * Push Stations * Local Smoke alarms* Common Area T-30 Door Closures X Quarterly All Unit T-30 Door Closures X Annually
FAS Service book ( to ensure completeness and correctness of the entries)
Quarterly
Fire Extinguishers/Boxes in Stairwell Units X Monthly
*Note: Each of these detectors installed has to be tested once a year at the least.
X Quarterly
X Annually
Technical Exhibit 1.3 Fire Sprinkler Systems Vogelweh Housing (Example)
Item: Frequency Inspection Gauges ( dry preaction and deluge systems) Weekly/Monthly Control valves Weekly/Monthly Waterflow devices Quarterly Valve supervisory devices Quarterly Supervisory signal devices exept valve supervisory switch Quarterly Gauges ( wet pipe systems) Monthly Hydraulic nameplate Quarterly Buildings Annually Pipe and fittings Annually Sprinklers Annually Spare Sprinklers Annually Fire Department connection Quarterly Valves ( all types) Obstruction 5 Years Water Tanks Pumps
Test Waterflow devices Quarterly/Semiannually
Valves supervisory devices Semiannually Supervisory signal devices exept valve supervisory switch Semiannually Main drain Annually Antifreeze solution Annually Gauges 5 Years Sprinklers (extra high temperature) 5 Years Sprinklers (fast response) at 20 years Sprinklers at 50 years Water Tanks Pumps
Maintenance Valves (all types) Annually or as needed Obstruction investigation 5 years or as needed Water Tanks Pumps
For technical definitions see NFPA72, 25
Testing Frequencies for Fire Sprinkler Systems (FSS)
TECHNICAL EXHIBIT 2
Appliance Quality Standards
The Contractor shall use this technical exhibit to replace appliance stock quality: Replacement stock quality shall conform to the following basic guidelines. The Conractor shall present the COR information, catalogs, pictures or sample appliances on make and model of all appliances for acceptance prior to purchase.
1. Dishwashers: Dishwasher fronts shall match existing adjoining cabinet fronts. Dishwashers shall have an automatic water turn off valve installed in the water supply line at the supply connection to automatically shut the water off in case of hose rupture. If existing fronts cannot be matched, the Contractor shall contact the COR for determination.
2. Ranges: Free-standing, four burner surface units, removable top, surface and oven “ON” indicator light, stove clock with cleaning and baking timer, removable oven door, oven door window, oven interior light, leveling legs, full width storage.
3. Wall Oven: German type built-in oven with: “ON” indicator light, stove clock with cleaning and baking timer, removable oven door, oven door window, oven interior light.
4. Cook Tops: 4-burner ceramic surface units shall be provided unless the top is not exchangable with a ceramic surface.
5. Refrigerators: Refrigerators and freezers shall be frost-free. Hard plastic liner, no-frost freezer. Freezer section shall be approximately 28% of total cubic footage. Refrigerator size upgrade may be requested by COR.
5.1 Refrigerator Standards:
5.1.1 Size for refrigerators are limited only by size of opening:
5.1.2 Refrigerator for: 2, 3, 4, bedroom units, minimum 21.5 cubic foot, with ice maker if water connection exists, if no water connection exists and no water connection is requested by the COR a refrigerator without ice maker is desired.
5.1.3 General Officer Housing (GOH), Senior Officer Quarters (SOQ) and Chief Prestige(CP), minimum 27 cubic foot, side by side with icemaker, chilled water and crushed ice dispenser in the door, with integrated water filter.
6. Washer Machine: Washer Machine shall have an automatic water turn off valve installed in the water supply line at the supply connection to automatically shut the water off in case of hose rupture.
7. Dryers: Standard should be equal or better to the existing appliance on the Master Appliance List at Appendix 5.
Upgrade of appliance shall be coordinated with the COR.
8. Garbage Disposals: Batch feed type.
9. Range Hood: European Type. Two or four speed fan, light, a filter that is removable, can be cleaned and reinstalled or is disposable and replaced with new. Range hood shall match existing range hood color or kitchen cabinet surface.
Replaceable filter to be provided to occupant by the U-Fix-It Store. Various types of range hoods exist. Some are build-in, stand-alone and stainless steel.
10. Single Unit Icemakers (GOH ONLY): Standard should be equal or better to the existing appliance on the Master Appliance List at Appendix 5. Upgrade of appliance shall be coordinated with the COR.
TECHNICAL EXHIBIT 3
Certification List
Certifications/Licenses.
Certifications Required For Fire Alarm Systems
1. Schrack Systems
a. Maxima systems certification
b. Integral systems certification
2. Esser Systems
a. 3008
c. 8000M
d. 8000C
e. 8007
f. 8008
3. Siemens Systems
a. SIGMASYS C
b. SIGMASYS B
c. SIGMASYS M
4. Monaco Systems
a. BT2/3 Transceivers
Certifications Required For Fire Suppression Systems
1. TYCO Systems (valves)
2. Grinell Systems (valves)
3. Rasco Systems (valves)
4. Victualic Systems (valves)
Other certifications as needed to perform/operate:
Note: This list is a general guide for the required certifications and is not an all-inclusive.
Electrical, Plumbing, Floor Refinishing/Replacement, Painting , Roofing, Masonry, Carpentry, Playground/Recreational Equipment maintenance, Locksmith, Excavating, Motor vehicles, and HVAC (Heating, Air Conditioning and Ventilation)
TECHNICAL EXHIBIT 4
Est.-Workload History
FY 15 FY 16 FY 17 FY 18 Unit of Issue Change of Occupancy Maintenance
(COM)
(Stairwell Units, Townhouses, GOH, SOQ)
2Br 316 358 258 251 Each 3Br 407 409 338 322 Each 4Br 205 176 183 190 Each GOH 10 8 4 7 Each
TOTAL 938 951 783 770
COM's Cleaning (Stairwell Units, Townhouses, GOH, SOQ)
2Br 316 358 258 251 Each 3Br 407 409 338 322 Each 4Br 205 176 183 190 Each GOH 10 8 4 7 Each
TOTAL 938 951 783 770
PRE-TERMINATION INSPECTION 973 886 859 795 Each
TERMINATION INSPECTION 1046 947 892 805 Each
DUST DOWN CLEANING 7 9 8 9 Each
FACILITY CLEANING (STAIRWELLS) 61 60 55 52 BLDG's
SERVICE CALLS
Routine 3,059 3,059 2,808 3,758 Each Urgent 2,095 2,136 1,925 1,876 Each Emergency 2,680 2,732 2,394 2,763 Each
TOTAL 7,834 7,927 7,127 8,397
EXTERIOR GROUNDS MAINTENANCE 11098 6326 6937 7181 Sqm
HOUSEHOLD HAZARDOUS WASTE 0 0 0 0 Cubic meters
LOCK OUT SERVICE CALLS 776 642 400 543 Each
TECHNICAL EXHIBIT 4a COM Breakout
Fiscal Year Area Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep
2015 Ramstein 6 15 15 20 13 11 25 11 40 53 37 18
2015 Vogelweh 30 42 47 37 38 42 31 51 86 78 65 67
2015 Landstuhl 1 2 5 4 3 3 3 5 7 13 9 5
Total R-V-L 37 59 67 61 54 56 59 67 133 144 111 90
2016 Ramstein 11 13 15 8 13 9 14 10 42 49 34 24
2016 Vogelweh 59 53 53 26 43 47 51 28 72 53 67 107
2016 Landstuhl 4 2 7 2 2 2 3 2 6 9 9 2
Total R-V-L 74 68 75 36 58 58 68 40 120 111 110 133
2017 Ramstein 7 13 20 16 8 9 10 11 37 60 22 14
2017 Vogelweh 29 33 43 55 23 44 21 39 73 61 48 46
2017 Landstuhl 2 4 5 2 0 3 2 2 8 6 5 2
Total R-V-L 38 50 68 73 31 56 33 52 118 127 75 62
2018 Ramstein 11 10 4 11 5 6 10 11 38 57 14 23
2018 Vogelweh 25 45 37 35 29 30 38 49 66 74 82 37
2018 Landstuhl 1 1 2 1 4 2 2 3 4 1 1 1
Total R-V-L 37 56 43 47 38 38 50 63 108 132 97 61
TECHNICAL EXHIBIT 4a COM Breakout
Total
TECHNICAL EXHIBIT 4b Service Call (SC) Breakout
FY 15 FY 16 FY 17 FY 18 FY 19 TOTAL
Landstuhl / Emergency 131 113 128 75 6 453 Landstuhl / Urgent 123 201 139 58 7 528 Landstuhl / Routine 154 238 203 158 65 818 Σ 408 552 470 291 78 1,799 Ramstein / Emergency 1,088 1,093 521 832 76 3,610 Ramstein / Urgent 785 648 497 642 47 2,619 Ramstein / Routine 826 870 778 1,277 190 3,941 Σ 2,699 2,611 1,796 2,751 313 10,170 Vogelweh / Emergency 1,461 1,526 1,702 1,856 166 6,711 Vogelweh / Urgent 1,187 1,287 1,261 1,176 82 4,993 Vogelweh / Routine 2,079 1,951 1,803 2,323 329 8,485 Σ 4,727 4,764 4,766 5,355 577 20,189 Emergency Total 2,680 2,732 2,351 2,763 248 10,774 Urgent Total 2,095 2,136 1,897 1,876 136 8,140 Routine Total 3,059 3,059 2,784 3,758 584 13,244
Overall Total 7,834 7,927 7,032 8,397 968 32,158
TECHNICAL EXHIBIT 4c RMP Breakout
FY Description (Approx. # of Units to be Inspected) Location Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep Total
2015 Roof Inspections Landstuhl 41
Ramstein 336
Vogelweh 472
2015 Gutter & Downspout Inspections Landstuhl 43 43 86
Ramstein 351 351 702
Vogelweh 475 479 954
2015 Fence Inspections Landstuhl 38 38
Ramstein 316 316
Vogelweh 456 456
2015 Air Conditioning Units Landstuhl 0
Ramstein 0
Vogelweh 0
2015 Lightning Protection Systems Landstuhl 38 38
Ramstein 314 314
Vogelweh 497 497
2015 Dryer and Duct Cleaning Landstuhl 75 75
Ramstein 548 548
Vogelweh 1,294 1,294
2015 Positive Air Flow Systems Landstuhl 38 38 76
Ramstein 310 314 624
Vogelweh 462 462 924
2015 Garage doors and Electric Garage Door Openers Landstuhl 38 38
Ramstein 328 328
Vogelweh 457 457
2015 Technical Room Inspections Landstuhl 41 41 41 41 41 41 41 41 41 41 41 41 492
Ramstein 332 332 332 332 332 332 332 332 338 338 338 342 4,012
Vogelweh 469 469 469 469 469 465 472 472 499 499 499 499 5,750
2015 Trash/Recycle Enclosure Sites Landstuhl 0
Ramstein 0
Vogelweh 0
2015 Pet Relief Station Landstuhl 32 32 32 32 32 40 32 32 40 32 40 32 408
Ramstein 68 68 68 68 68 85 68 68 85 68 85 68 867
Vogelweh 164 164 164 164 164 205 164 164 205 164 205 164 2,091
2015 ORA Landstuhl 8 8 8 8 10 8 10 8 68
Ramstein 20 20 20 20 25 20 25 20 170
Vogelweh 52 52 52 52 65 52 65 52 442
2015 ORA Annual Playground Audit Landstuhl 2 2 4
Ramstein 5 5 10
Vogelweh 13 13 26
2015 Fire Protection Systems Landstuhl 3 3 3 3 3 3 3 3 3 3 3 3 36
Ramstein 17 17 17 16 14 14 15 15 15 15 15 15 185
Vogelweh 47 47 47 47 47 43 43 43 43 43 41 41 532
2016 Roof Inspections Landstuhl 42 42
Ramstein 350 350
Vogelweh 531 531
2016 Gutter & Downspout Inspections Landstuhl 42 42 84
Ramstein 350 349 699
Vogelweh 516 534 1,050
2016 Fence Inspections Landstuhl 0
Ramstein 0
Vogelweh 0
2016 Air Conditioning Units Landstuhl 0
Ramstein 0
Vogelweh 0
2016 Lightning Protection Systems Landstuhl 38 38
Ramstein 314 314
Vogelweh 512 512
2016 Dryer and Duct Cleaning Landstuhl 75 75
Ramstein 564 564
Vogelweh 1,349 1,349
2016 Positive Air Flow Systems Landstuhl 38 38 76
Ramstein 316 316 632
Vogelweh 476 493 969
2016 Garage doors and Electric Garage Door Openers Landstuhl 38 38
Ramstein 330 330
Vogelweh 493 493
2016 Technical Room Inspections Landstuhl 21 21 41 21 21 41 21 21 41 21 21 41 332
Ramstein 234 234 342 234 234 344 232 233 341 234 235 343 3,240
Vogelweh 221 221 499 221 221 510 227 227 513 227 227 514 3,828
2016 Trash/Recycle Enclosure Sites Landstuhl 0
Ramstein 0
Vogelweh 0
2016 Pet Relief Station Landstuhl 32 40 32 32 40 32 32 40 32 32 40 32 416
Ramstein 68 85 68 68 85 68 68 85 68 68 85 68 884
Vogelweh 164 205 164 164 205 164 164 205 164 164 205 164 2,132
2016 ORA Landstuhl 2 2 10 10 8 10 8 8 58
Ramstein 6 6 30 30 24 30 24 24 174
Vogelweh 13 13 65 65 52 65 52 52 377
2016 ORA Annual Playground Audit Landstuhl 2 2
Ramstein 6 6
Vogelweh 13 13
2016 Fire Protection Systems Landstuhl 3 3 3 3 3 3 3 3 3 3 3 3 36
Ramstein 18 18 18 18 18 18 18 18 18 18 18 18 216
Vogelweh 41 41 41 41 41 41 41 41 41 41 41 41 492
Roof Inspections Landstuhl 42 42
Ramstein 350 350
Vogelweh 531 531
Gutter & Downspout Inspections Landstuhl 43 43 86
Ramstein 349 349 698
Vogelweh 534 534 1,068
Fence Inspections Landstuhl 38 38
Ramstein 316 316
Vogelweh 456 456
Air Conditioning Units Landstuhl 0
Ramstein 0
Vogelweh 0
Lightning Protection Systems Landstuhl 38 38
Ramstein 314 314
Vogelweh 512 512
Dryer and Duct Cleaning Landstuhl 93 93
Ramstein 564 564
Vogelweh 1,349 1,349
Posiitive Air Flow Systems Landstuhl 38 38 76
Ramstein 316 316 632
Vogelweh 493 493 986
Garage doors and Electric Garage Door Openers Landstuhl 38 38
Ramstein 330 330
Vogelweh 493 493
Technical Room Inspections Landstuhl 21 21 42 22 22 42 20 22 42 22 22 42 340
Ramstein 235 241 347 239 239 347 108 229 336 237 237 346 3,141
Vogelweh 229 240 530 244 240 526 286 246 529 246 246 534 4,096
Trash/Recycle Enclosure Sites Landstuhl 0
Ramstein 0
Vogelweh 0
Pet Relief Station Landstuhl 25 20 20 25 20 20 20 25 20 20 20 20 255
Ramstein 95 76 76 95 76 76 76 95 76 76 76 76 969
Vogelweh 185 148 148 185 148 148 148 185 148 148 148 148 1,887
ORA Landstuhl 2 2 8 10 8 8 10 8 56
Ramstein 6 6 24 30 24 24 30 24 168
Vogelweh 13 13 52 65 52 52 65 52 364
ORA Annual Playground Audit Landstuhl 2 2
Ramstein 8 8
Vogelweh 13 13
Fire Protection Systems Landstuhl 3 3 4 4 4 4 4 4 5 5 5 5 50
Ramstein 18 17 17 17 17 17 17 17 17 17 17 17 205
Vogelweh 41 41 41 37 37 37 37 37 37 37 37 37 456 2017 Roof Inspections Landstuhl 42 42
Ramstein 350 350 Vogelweh 531 531
2017 Gutter & Downspout Inspections Landstuhl 43 43 86 Ramstein 349 349 698 Vogelweh 534 534 1,068
2013 Fence Inspections Landstuhl 38 38 Ramstein 316 316 Vogelweh 456 456
2018 Air Conditioning Units Landstuhl 0 Ramstein 0 Vogelweh 0
2018 Lightning Protection Systems Landstuhl 38 38 Ramstein 314 314 Vogelweh 512 512
2018 Dryer and Duct Cleaning Landstuhl 93 93 Ramstein 564 564 Vogelweh 1,349 1,349
2018 Posiitive Air Flow Systems Landstuhl 38 38 76 Ramstein 316 316 632 Vogelweh 493 493 986
2018 Garage doors and Electric Garage Door Openers Landstuhl 38 38 Ramstein 330 330 Vogelweh 493 493
2018 Technical Room Inspections Landstuhl 21 21 42 22 22 42 20 22 42 22 22 42 340 Ramstein 235 241 347 239 239 347 108 229 336 237 237 346 3,141 Vogelweh 229 240 530 244 240 526 286 246 529 246 246 534 4,096
2018 Trash/Recycle Enclosure Sites Landstuhl 0 Ramstein 0 Vogelweh 0
2018 Pet Relief Station Landstuhl 25 20 20 25 20 20 20 25 20 20 20 20 255 Ramstein 95 76 76 95 76 76 76 95 76 76 76 76 969 Vogelweh 185 148 148 185 148 148 148 185 148 148 148 148 1,887
2018 ORA Landstuhl 2 2 8 10 8 8 10 8 56 Ramstein 6 6 24 30 24 24 30 24 168 Vogelweh 13 13 52 65 52 52 65 52 364
2018 ORA Annual Playground Audit Landstuhl 2 2 Ramstein 8 8 Vogelweh 13 13
2018 Fire Protection Systems Landstuhl 3 3 4 4 4 4 4 4 5 5 5 5 50 Ramstein 18 17 17 17 17 17 17 17 17 17 17 17 205 Vogelweh 41 41 41 37 37 37 37 37 37 37 37 37 456
| CoverPage |
| Index |
| TE-1 |
| TE-1.1 |
| TE-1.2 |
| TE-1.3 |
| TE-2 |
| TE-3 |
| TE-4 |
| TE-4a |
| TE-4b |
| TE-4c |
File details come from the government source that posted it. Updated .