PWS_Appendix_2_Surveillance_Plan.docx
DOCX document 17 KB Posted
- Attached to
- Laundry and Dry Cleaning Services in Support of NAFI (Non-Appropriated Fund Instrumentality)
- Solicitation number
- FA5613-17-R-0001
About this file
PWS Appendix 2, Surveillance Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch_2_PWS_NAF_Laundry_Revised_Amd02.docx | DOCX document | |
| PWS_Appendix_1,_Estimated_Annual-Monthly_Workload_Revised_Amd02.xlsx | XLSX spreadsheet | |
| Pre-Prop_Conf-Site_Visit_Attend_Sheet.pdf | ||
| Amendment_02.doc | DOC document | |
| Pre-Proposal_Conf_Minutes_27Mar17.docx | DOCX document | |
| AF_Inns_Linen_Specifications_Standard.docx | DOCX document | |
| Pre-Proposal_Slides_Laundry.ppt | PPT presentation | |
| Site_Visit_Minutes_31Mar17.docx | DOCX document | |
| Amendment_01.doc | DOC document | |
| Attachment_4_Past_Performance_Questionnaire_(PPQ).doc | DOC document | |
| Attachment_1,_Pricing_Schedule.doc | DOC document | |
| Combined_Synopsis-Solicitation.doc | DOC document | |
| Attachment_3,_General_Provisions.docx | DOCX document | |
| Attachment_2,_Performance_Work_Statement_(PWS).docx | DOCX document | |
| PWS_Appendix_1,_Estimated_Annual-Monthly_Workload.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 of PWS Surveillance Plan
1. Surveillance Items. The contractor service requirements are summarized into performance objectives that relate directly to mission success. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
| SS |
| Performance objective |
| PWS Para |
| Performance Threshold |
| 01 |
| All laundry and dry cleaning returned and accomplished consistent with commercial standards, free of tears, stains, etc. |
| 1. – |
1.1.3 No more than 1 missing or defective item identified per 5 bundles.
| 02 |
| Laundry and dry-cleaning appropriately marked, separated, cleaned, packed, and returned. |
| 1. – |
1.1.3 No more than 1 missing or defective item identified per bundle.
| 03 |
| All items are packaged as dry and serviceable. |
| 1.3. |
| No more than 1 wet or unserviceable bundle per day. |
| 04 |
| Pick-up/Delivery – On a daily basis |
| 1.4 |
| Delays not to exceed 1 business day. |
2. Performance Assessment Report (PAR):
| 1. CONTRACTOR |
| 2. CONTRACT NUMBER |
3. TYPE OF SERVICES
4. FINDING CATEGORY
|_| NO FINDING
|_| FINDING
|_| MAJOR FINDING
I. PERFORMANCE DESCRIPTION
5. CONTRACT REQUIREMENT
6. PWS REFERENCE
7. DETAILED PERFORMANCE ASSESSMENT—DESCRIBE CONTRACTOR PERFORMANCE
8. ASSESSING Tech Rep GRADE/NAME
9. ASSESSMENT DATE
II. FINDING DESCRIPTION
10. CONTROL NUMBER
| 11. ISSUING AUTHORITY GRADE/NAME |
| 12. SUSPENSE DATE |
13. BRIEF DESCRIPTION OF THE FINDING
14. FINDING IMPACT
15. CONTRACTOR RESPONSE: Contractor must respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 12. If date was not entered in Block 12, the Contractor is not required to provide a response.
16. Techn Rep RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE:
1 17. CONTRACTOR RESPONSE
|_|ACCEPTED
|_|REJECTED
18. EVALUATING TECH REP GRADE/NAME
19. FINDING CLOSE DATE
PERFORMANCE ASSESSMENT REPORT (CONTINUATION SHEET)
ENTER CONTROL NUMBER (Same as Block 10) if applicable
File details come from the government source that posted it. Updated .