Pre-Proposal_Conf_Minutes_27Mar17.docx

DOCX document 136 KB Posted

Attached to
Laundry and Dry Cleaning Services in Support of NAFI (Non-Appropriated Fund Instrumentality)
Solicitation number
FA5613-17-R-0001
Issued by

About this file

Pre-Proposal Conference Minutes

View the file

Other files

File Type Posted
Atch_2_PWS_NAF_Laundry_Revised_Amd02.docx DOCX document
PWS_Appendix_1,_Estimated_Annual-Monthly_Workload_Revised_Amd02.xlsx XLSX spreadsheet
Pre-Prop_Conf-Site_Visit_Attend_Sheet.pdf PDF
Amendment_02.doc DOC document
AF_Inns_Linen_Specifications_Standard.docx DOCX document
Pre-Proposal_Slides_Laundry.ppt PPT presentation
Site_Visit_Minutes_31Mar17.docx DOCX document
Amendment_01.doc DOC document
Attachment_4_Past_Performance_Questionnaire_(PPQ).doc DOC document
Attachment_1,_Pricing_Schedule.doc DOC document
Combined_Synopsis-Solicitation.doc DOC document
PWS_Appendix_2_Surveillance_Plan.docx DOCX document
Attachment_3,_General_Provisions.docx DOCX document
Attachment_2,_Performance_Work_Statement_(PWS).docx DOCX document
PWS_Appendix_1,_Estimated_Annual-Monthly_Workload.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preproposal Conference Minutes

TITLE: Solicitation FA5613-17-R-0001, Laundry and Dry Cleaning Services in the Kaiserslautern Military Community (KMC)

PLACE: Kapaun Air Station, Bldg 2767, Kaiserslautern, Germany

DATE/TIME: 27 Mar 2017, 1000 hrs

In accordance with (IAW) the solicitation, a pre-proposal conference was conducted by the 700th Contracting Squadron/LGCA and the requesting unit, 786th Force Support Squadron (FSS), at Kapaun Air Station. Government personnel and attending contractor representatives are identified on attached combined pre-proposal conference and site visit attendance list.

1. The purpose of the pre-proposal conference was to give prospective offerors an overall understanding of the acquisition, discuss the requirement, explain significant elements of the solicitation and answer questions. The briefing was conducted IAW the attached briefing slides. In addition to the information contained on the slides, the reconciliation identified in the pricing schedule, Attachment 1 of the combined synopsis/solicitation, was explained. It gives the contractor the opportunity to request an equitable adjustment, when, at the end of the performance period, the actual number of items for laundry services exceeds the total number of these items in Appendix 1, Estimated Annual-Monthly Workload, by more than 3%. The adjustment will be made for laundry services in excess of these 3%.

2. The following questions were asked during and after the briefing (Question = Q, Answer = A):

a. Q: What items are to be laundered and what is to be dry-cleaned?
A: Appendix 1 to the PWS specifies this in the last column of the spread sheet.
b. Q: How are the evaluation factors weighted in percent? What is more important?
A: This information is contained on slide # 19 of the briefing.
c. Q: Regarding the reconciliation in the pricing schedule, how will more expensive pieces be priced?
A: The adjustment will be based on the average price per item for laundry services derived from the monthly price and the estimated total monthly quantity as shown on Appendix 1.
d. Q: Can the measurements of the sheets, etc., be provided?
A: Yes, this information will be provided.
e. Q: Is a daily delivery necessary?
A: Items have to be picked up daily, Monday through Friday at the two locations at Ramstein Air Base. Laundry has to be returned not later than 72 hours after pick-up. Pick-up and delivery occur on Saturdays, when a recognized German holiday falls on a Friday or Monday.
f. Q: Does the contractor have to drive to Spangdahlem?
A: No.
g. Q: Can the number of containers to be picked up be provided?
A: If more than one truck (7.5 ton) is required the technical representative will call the contractor.
h. Q: How far away from the gate and each other are the buildings for pick-up and delivery?
A: The GPS coordinates will be provided.
i. Q: Is the delivery time less than 72 hours or not later than 72 hours after pick-up?
A: It is not later than 72 hours after pick-up.
j. Q: How are the bundles tagged in accordance with paragraph 1.1.2. of the PWS?
A: No tags will be put on the bundles, but the laundry will either be packed in foil, bed sheets or pillow covers.
k. Q: How is paragraph 1.2.3. of the PWS to be understood? Shall laundry, which was contaminated with blood, for example, be thrown away?
A: No, this laundry shall be washed separately.

3. The representative of the requesting unit, 786th Force Support Squadron (FSS), provided additional information as follows:

a. Only 5-6% of the laundry consists of small pieces.

b. There will be 70 more hotel rooms by the end of the year.

c. Mondays are the days where there is the most laundry.

d. In the winter months there may be less pieces for laundry than in the summer. Items for dry cleaning may also fluctuate.

e. At Bldg 3336 is a corridor with a length of approximately 100 m, but the contractor’s truck can drive to a dock.

4. Based on the contractor representatives’ request a site visit will be scheduled. Date and time will be announced and posted to FBO.

As no further questions were asked, the pre-proposal conference concluded at 11:00.

Attachments:

1. Pre-proposal Conference Slides

2. Attendance List

700th Contracting Squadron Page 2 of 2 Kapaun Air Station, Germany image1.png