RFP_14-R-0016-Atch1-Annex30g._Blank_STP_Format.docx
DOCX document 31 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC), Ramstein AB, Germany Federal contract opportunity
- Solicitation number
- FA5613-14-R-0016
About this file
RFP Atch 1 Annex 30g Standardized Technical Proposal (STP) Format
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC), Ramstein AB, Germany has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5613-14-R-0016
Attachment 1 – Annex 30g Blank Standardized Technical Proposal (STP) Format
| A: PRELIMINARY NOTES |
| PROJECT #: |
TITLE:
BUILDING #:
LOCATION:
INSPECTOR:
| B: TIME SCHEDULE | |
| PERFORMANCE PERIOD | |
| CALENDAR DAYS: | |
| LATEST END DATE: | |
| EXCLUSION PERIOD: | |
| PHASES: |
C: STATEMENT OF WORK (SOW)
Contractor shall provide SOW based on the Government provided Statement of Need (SON)
Yes |_| No |_|
D: TECHNICAL DESCRIPTION
1. DESIGN EFFORT REQUIRED
2. CONSTRUCTION
a. NEW WORK
b. REPAIR/OTHER
| Yes |_| | No |_| |
| % DESIGN REQUIRED: |
| Yes |_| | No |_| |
| Yes |_| | No |_| |
| E: QUALITY CONTROL |
| 1. SPECIFIC TASK ORDER QUALITY CONTROL, ISO 9001-2000 |
2. ABATEMENT PLAN FOR CONTAMINATED MATERIAL
3. OTHER SPECIAL CONSTRAINTS
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
| F: CURRENT REGULATIONS |
| 1. DIN STANDARD FOR THIS SPECIFIC TASK ORDER |
2. OTHER REGULATIONS
Yes |_| No |_|
Yes |_| No |_|
G: ATTACHMENT ONE
[Project Info. Sheet Provided by requiring activity - Attach to Technical Proposal ]
1. MAGNITUDE (SELECT ONE VALUE ONLY)
2. STATUTORY COST LIMITATION: THE NEW WORK PORTION OF THIS PROJECT IS ESTIMATED TO BE BELOW THE CURRENT VALID STATUTORY COST LIMITATION OF $ 750,000.00
3. LIQUIDATED DAMAGES ARE REQUESTED. THE VALUE IS ATTACHED. MANDATORY OVER $550,000.00
4. WORK HOURS
| Days |
| Weekend |
US / German Holidays
5. RESTRICTED AREAS
6. GOVERNMENT FURNISHED PROPERTY
7. DIGGING PERMIT: A digging permit (AF Form 103) is required. The contractor shall obtain the required form from the Ramstein or Spangdahlem Engineering Office.
8. WELDING PERMIT: A welding permit is required. The contractor will obtain the form at the Ramstein or Spangdahlem Fire Protection Office.
9. UTILITY SHUT-DOWN: Utility interruption is required. Request must be submitted in writing to the C. O. at least 10 working days prior to proposed interruption.
10. TRAFFIC RESTRICTION
11. CRANE ERECTION / AIR TRAFFIC INTERFERENCE
12. AIRFIELD CONSTRUCTION WAIVER
13. CONSTRUCTION / MATERIAL LAYDOWN AREA
14. AS-BUILT DRAWINGS
15. MAINTENANCE MANUALS (Due not later than final inspection) |_| Less than $25,000 |_| Between $25,000 and $100,000 |_| Between $100,000 and $250,000 |_| Between $250,000 and $500,000 |_| Between $500,000 and $1,000,000 |_| Between $1,000,000 and $5,000,000
Yes |_| No |_|
Yes |_| No |_|
| FROM | TO |
| FROM | TO |
| FROM | TO |
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
| H. OTHER ATTACHMENTS AS NEEDED |
| 1. 700 CONS MATERIAL SUBMITTAL FORM 66 |
2. ELECTRONIC & PAPER DRAWINGS IAW THE GENERAL REQUIREMENTS & TASK ORDER STATEMENT OF NEED
3. _______% DESIGN PROVIDED
Yes |_| No |_|
Yes |_| No |_|
Yes |_| No |_|
File details come from the government source that posted it. Updated .